Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Gas Lift Techniques Modification to Overcome Evolution in Completion

View through CrossRef
Abstract Completion type in Vico Indonesia is designed mainly based on the subsurface considerations. Multi-layer reservoir consisting of gas and oil reservoirs related with fluvio-deltaic depositional environment influences the production strategy which will need zone isolation for single or commingled production. Many completion types have been implemented since early development including single or dual selective, monobore, and dual monobore cemented as the most recent completion. There are more than 500 wells drilled and completed using dual monobore cemented completion. This completion type gives constraints on the application of common downhole pump lift. Evolution in the completion type requires a different approach in gas lift technique for oil development. Many gas lift techniques have been applied to address the completion types. The gas lift techniques include the implementation of conventional gas lift with SPM, poor boy, coiled tubing gas lift, and coiled tubing gas lift with unloader. The first two methods are common for selective completions while the last two are fit for purpose for monobore completions. The appropriate modification and selection on the gas lift techniques exhibits a real benefit to optimize oil recovery in these various and evolving completion types in VICO. The contribution is around 70% from total oil production while single year gas lift project contributes to approximately 30% of annual production in respective year. Total cumulative production from the application of these techniques is around 10 MMBO. Modification in gas lift techniques is needed to tackle evolution of completion types. Coiled tubing gas lift with unloader is the newest technique used to enhance the advantage of coiled tubing gas lift application. The modification of gas lift techniques will be described in this paper.
Title: Gas Lift Techniques Modification to Overcome Evolution in Completion
Description:
Abstract Completion type in Vico Indonesia is designed mainly based on the subsurface considerations.
Multi-layer reservoir consisting of gas and oil reservoirs related with fluvio-deltaic depositional environment influences the production strategy which will need zone isolation for single or commingled production.
Many completion types have been implemented since early development including single or dual selective, monobore, and dual monobore cemented as the most recent completion.
There are more than 500 wells drilled and completed using dual monobore cemented completion.
This completion type gives constraints on the application of common downhole pump lift.
Evolution in the completion type requires a different approach in gas lift technique for oil development.
Many gas lift techniques have been applied to address the completion types.
The gas lift techniques include the implementation of conventional gas lift with SPM, poor boy, coiled tubing gas lift, and coiled tubing gas lift with unloader.
The first two methods are common for selective completions while the last two are fit for purpose for monobore completions.
The appropriate modification and selection on the gas lift techniques exhibits a real benefit to optimize oil recovery in these various and evolving completion types in VICO.
The contribution is around 70% from total oil production while single year gas lift project contributes to approximately 30% of annual production in respective year.
Total cumulative production from the application of these techniques is around 10 MMBO.
Modification in gas lift techniques is needed to tackle evolution of completion types.
Coiled tubing gas lift with unloader is the newest technique used to enhance the advantage of coiled tubing gas lift application.
The modification of gas lift techniques will be described in this paper.

Related Results

Gas Lift Journey to Maximize the Asset Value in Platong Field, Gulf of Thailand
Gas Lift Journey to Maximize the Asset Value in Platong Field, Gulf of Thailand
Abstract Operating Platong field in the Gulf of Thailand (GoT) is challenging because of the small compartmentalized reservoirs in the fluvial deposition environm...
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Investigative Approaches to Troubleshooting and Remediating Sub-Optimal Gas Lift Performance in a Dual Completion Well
Investigative Approaches to Troubleshooting and Remediating Sub-Optimal Gas Lift Performance in a Dual Completion Well
Abstract Gas lift is said to be one of the most forgiving forms of artificial lift techniques because even a poorly designed gas lift system will lead to some produc...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
A New Approach to Gas-Lift Allocation Optimization
A New Approach to Gas-Lift Allocation Optimization
Abstract Analytical methods for determining the optimal injection rate in a well operating under gas-lift are based on balancing the buoyancy improvements from th...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...

Back to Top