Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Investigative Approaches to Troubleshooting and Remediating Sub-Optimal Gas Lift Performance in a Dual Completion Well

View through CrossRef
Abstract Gas lift is said to be one of the most forgiving forms of artificial lift techniques because even a poorly designed gas lift system will lead to some production of fluids. As a result, the tendency exists for Production Engineers to pay little attention to designing and maintaining optimal gas lift systems. Some unique considerations are required for a dual gas lift system where both strings in a dual completion are on gas lift. Using a case study, this paper highlights key investigative questions and assessments to understand the individual well string performances, assess optimal contribution of both strings and optimal distribution of the injected gas. This paper focuses on the gas lift optimization on Well-AX SS which experienced production decline from about 1,000 BOPD to 40 BOPD. The highlights of the methods employed involved investigating for communication between strings, identifying the string with highest production potential, determining optimal gas lift valve depth, and ensuring no surface network bottleneck exists. With industry emphasis on low-cost oil, it has become critical to minimize the Operating Expense (OPEX) by ensuring optimal gas lift injection into wells. After investigation and assessment of the production potential and the gas lift injection status, the gas lift injection was redesigned, and optimal gas lift design recommended. The work-over executed involved isolating the source of communication, shutting in the completion with lower potential and optimizing the gas lift system of the more productive string. This work-over led to an increase in production of 850 BOPD. One of the key challenges to optimal gas lift is accurate gas measurement and understanding the split of gas between each string in a dual completion. Lessons learned from this assessment include obtaining robust and recent surveillance data for well performance assessment and thorough evaluation of production strings to ascertain the injection depth of gas lift gas.
Title: Investigative Approaches to Troubleshooting and Remediating Sub-Optimal Gas Lift Performance in a Dual Completion Well
Description:
Abstract Gas lift is said to be one of the most forgiving forms of artificial lift techniques because even a poorly designed gas lift system will lead to some production of fluids.
As a result, the tendency exists for Production Engineers to pay little attention to designing and maintaining optimal gas lift systems.
Some unique considerations are required for a dual gas lift system where both strings in a dual completion are on gas lift.
Using a case study, this paper highlights key investigative questions and assessments to understand the individual well string performances, assess optimal contribution of both strings and optimal distribution of the injected gas.
This paper focuses on the gas lift optimization on Well-AX SS which experienced production decline from about 1,000 BOPD to 40 BOPD.
The highlights of the methods employed involved investigating for communication between strings, identifying the string with highest production potential, determining optimal gas lift valve depth, and ensuring no surface network bottleneck exists.
With industry emphasis on low-cost oil, it has become critical to minimize the Operating Expense (OPEX) by ensuring optimal gas lift injection into wells.
After investigation and assessment of the production potential and the gas lift injection status, the gas lift injection was redesigned, and optimal gas lift design recommended.
The work-over executed involved isolating the source of communication, shutting in the completion with lower potential and optimizing the gas lift system of the more productive string.
This work-over led to an increase in production of 850 BOPD.
One of the key challenges to optimal gas lift is accurate gas measurement and understanding the split of gas between each string in a dual completion.
Lessons learned from this assessment include obtaining robust and recent surveillance data for well performance assessment and thorough evaluation of production strings to ascertain the injection depth of gas lift gas.

Related Results

Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...
Field Scale Research on Artificial Lift
Field Scale Research on Artificial Lift
Abstract A field test loop to conduct experiments on artificial lift has been built and it is already in operation. A detailed description of the test loop is p...
Artificial Lift, A Major Unresolved Issue for SAGD
Artificial Lift, A Major Unresolved Issue for SAGD
Abstract Most SAGD projects currently operate at high enough pressure to utilize steam/gas lift. However, there are expected to be many applications where lower p...
Combining Gas Lift, PAGL, and Plunger Lift Optimizes Production Across Tight Oil Well Lifecycle
Combining Gas Lift, PAGL, and Plunger Lift Optimizes Production Across Tight Oil Well Lifecycle
Abstract This paper presents a "full lifecycle" approach to well production that encompasses three interrelated forms of artificial lift ‒ gas lift, plunger-assisted...

Back to Top