Sacramento River East Levee Contract 4 – Construction of Seepage Cutoff Wall
View through CrossRef
he Sacramento River East Levee Contract 4 was the fourth contract of the American Common Features (ARCF) 2016 project. The United States Army Corps of Engineers (USACE) developed a program to improve the seepage and stability conditions along the Sacramento River East Levee (SREL). This contract included construction of a cutoff wall utilizing jet grouting or deep mixing method to adjoin to existing cutoff walls from previously completed contracts. TREVIICOS Corporation (TIC) was selected by the General Contractor, Maloney-Odin A Joint Venture (MOAJV) to be the Jet Grouting Contractor and complete the jet grout cutoff wall portion of the contract.
The scope of work outlined for the Jet Grout contractor involved installation of a Jet Grout Cutoff Wall (JGCOW) connecting to previously installed Deep Mixing Method (DMM) Cutoff Walls. The project consisted of constructing a JGCOW at multiple locations with controlled strength and permeability properties. The project presented unique challenges for installing the cutoff wall, such as varying geology at each specific location, significant depths reaching up to 145+ feet, limited real estate near the active public and sensitive structures, active discharge pipes from a pump station, and an active pressurized gas line.
To circumnavigate these unique challenges, as required by the contract specifications, TIC installed 8 foot or 10.5 foot diameter triple fluid jet grout columns utilizing air, water, and grout at high pressures. In addition to triple fluid, TIC also implemented some single fluid high pressure grout columns reaching diameters of 3 to 4 foot to mitigate unknown challenges that arose during the construction of the jet grout cutoff wall. This paper details the unique challenges encountered, and the solutions implemented to successfully install the jet grout cutoff wall.
Deep Foundations Institute
Title: Sacramento River East Levee Contract 4 – Construction of Seepage Cutoff Wall
Description:
he Sacramento River East Levee Contract 4 was the fourth contract of the American Common Features (ARCF) 2016 project.
The United States Army Corps of Engineers (USACE) developed a program to improve the seepage and stability conditions along the Sacramento River East Levee (SREL).
This contract included construction of a cutoff wall utilizing jet grouting or deep mixing method to adjoin to existing cutoff walls from previously completed contracts.
TREVIICOS Corporation (TIC) was selected by the General Contractor, Maloney-Odin A Joint Venture (MOAJV) to be the Jet Grouting Contractor and complete the jet grout cutoff wall portion of the contract.
The scope of work outlined for the Jet Grout contractor involved installation of a Jet Grout Cutoff Wall (JGCOW) connecting to previously installed Deep Mixing Method (DMM) Cutoff Walls.
The project consisted of constructing a JGCOW at multiple locations with controlled strength and permeability properties.
The project presented unique challenges for installing the cutoff wall, such as varying geology at each specific location, significant depths reaching up to 145+ feet, limited real estate near the active public and sensitive structures, active discharge pipes from a pump station, and an active pressurized gas line.
To circumnavigate these unique challenges, as required by the contract specifications, TIC installed 8 foot or 10.
5 foot diameter triple fluid jet grout columns utilizing air, water, and grout at high pressures.
In addition to triple fluid, TIC also implemented some single fluid high pressure grout columns reaching diameters of 3 to 4 foot to mitigate unknown challenges that arose during the construction of the jet grout cutoff wall.
This paper details the unique challenges encountered, and the solutions implemented to successfully install the jet grout cutoff wall.
Related Results
Continuous River Levee Safety Assessment Based on a Reliability Analysis
Continuous River Levee Safety Assessment Based on a Reliability Analysis
A design scheme is proposed to evaluate the safety of continuous linear structure i.e. river levee. The scheme is developed to establish a procedure to continuously evaluate the st...
Continuous River Levee Safety Assessment based on a Reliability Analysis
Continuous River Levee Safety Assessment based on a Reliability Analysis
A design scheme is proposed to evaluate the safety of continuous linear structure i.e. river levee. The scheme is developed to establish a procedure to continuously evaluate the st...
River channel cutoff dynamics, Sacramento River, California, USA
River channel cutoff dynamics, Sacramento River, California, USA
AbstractWe measured patterns of river channel migration and cutoff between 1904 and 1997 on a 160 km meandering alluvial reach of the Sacramento River by intersecting a sequential ...
Quality Control of Slurry Cutoff Wall Installations
Quality Control of Slurry Cutoff Wall Installations
A predominantly sandy levee embankment along an 18 km portion of the Sacramento River had a history of heavy seepage during river flood stages. A seepage cutoff wall keyed into cla...
Inversion analysis and safety evaluation of deformation of cutoff wall in Daning Reservoir
Inversion analysis and safety evaluation of deformation of cutoff wall in Daning Reservoir
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project...
Analysis of Sluice Foundation Seepage Using Monitoring Data and Numerical Simulation
Analysis of Sluice Foundation Seepage Using Monitoring Data and Numerical Simulation
For sluices built on soil foundations, seepage safety of the foundation is one of the most concerns during operation of sluices. Monitoring data could reflect the real seepage beha...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...
Physical Modeling of Seepage Control Using Upstream Blanket and Cutoff in Earth Dams: A Hele–Shaw Experimental Study
Physical Modeling of Seepage Control Using Upstream Blanket and Cutoff in Earth Dams: A Hele–Shaw Experimental Study
Seepage beneath earth dams founded on pervious strata can cause excessive under-seepage, elevated downstream exit gradients, and high phreatic levels, thereby increasing susceptibi...