Javascript must be enabled to continue!
Quality Control of Slurry Cutoff Wall Installations
View through CrossRef
A predominantly sandy levee embankment along an 18 km portion of the Sacramento River had a history of heavy seepage during river flood stages. A seepage cutoff wall keyed into clayey layers in the foundation soils was chosen by the U.S. Army Corps of Engineers to remedy the seepage problems. A test cutoff program utilizing 4 different methods (backhoe, trencher, mix-in-place and vibrated beam) of installing a cement-bentonite cutoff wall was undertaken as a performance type of contract to evaluate the methods and results of installing cutoffs with specified minimum width, depth, strength, and maximum hydraulic conductivity. This was followed by a Phase I contract to install 3.2 km of cutoff wall (27,870 m2) with essentially the same performance type specification as used in the test program. The quality control programs involved sampling and molding specimens of cutoff wall materials and sampling of the hardened materials with drilled borings, in situ packer permeability testing, and numerous sampling methods. Test results raised questions of the representativeness and degrees of disturbance caused by the various sampling and testing methods and they indicated the cutoff walls did not always meet the required minimum unconfined compressive strength of 103 kPa or the maximum hydraulic conductivity of 1 × 10-6 cm/sec. The paper presents the test results and discusses the quality control methods, procedures and problems encountered in both the test program and Phase I contract.
ASTM International100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959
Title: Quality Control of Slurry Cutoff Wall Installations
Description:
A predominantly sandy levee embankment along an 18 km portion of the Sacramento River had a history of heavy seepage during river flood stages.
A seepage cutoff wall keyed into clayey layers in the foundation soils was chosen by the U.
S.
Army Corps of Engineers to remedy the seepage problems.
A test cutoff program utilizing 4 different methods (backhoe, trencher, mix-in-place and vibrated beam) of installing a cement-bentonite cutoff wall was undertaken as a performance type of contract to evaluate the methods and results of installing cutoffs with specified minimum width, depth, strength, and maximum hydraulic conductivity.
This was followed by a Phase I contract to install 3.
2 km of cutoff wall (27,870 m2) with essentially the same performance type specification as used in the test program.
The quality control programs involved sampling and molding specimens of cutoff wall materials and sampling of the hardened materials with drilled borings, in situ packer permeability testing, and numerous sampling methods.
Test results raised questions of the representativeness and degrees of disturbance caused by the various sampling and testing methods and they indicated the cutoff walls did not always meet the required minimum unconfined compressive strength of 103 kPa or the maximum hydraulic conductivity of 1 × 10-6 cm/sec.
The paper presents the test results and discusses the quality control methods, procedures and problems encountered in both the test program and Phase I contract.
Related Results
Inversion analysis and safety evaluation of deformation of cutoff wall in Daning Reservoir
Inversion analysis and safety evaluation of deformation of cutoff wall in Daning Reservoir
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project...
Performance Experiment of Ultra high Temperature Cementing Slurry System
Performance Experiment of Ultra high Temperature Cementing Slurry System
Abstract
The continuous development of oil and gas exploration and development to deep and ultra deep wells in China, the formation temperature is also getting higher and h...
Successful Application of Foamed Cement Slurry in an Ultradeepwater Well of 11,900-ft Water Depth (Claiming World Record)
Successful Application of Foamed Cement Slurry in an Ultradeepwater Well of 11,900-ft Water Depth (Claiming World Record)
Abstract
Foamed cement was successfully used in the riserless section of an ultradeepwater well located in 11,900ft water depth. Foamed cement was selected to minimi...
Ice Slurry Ingestion and Physiological Strain During Exercise in Non-Compensable Heat Stress
Ice Slurry Ingestion and Physiological Strain During Exercise in Non-Compensable Heat Stress
INTRODUCTION: Precooling with ice slurry ingestion attenuates the increase in rectal temperature (Tre) during subsequent running and cycling. It remains unclear how this cooling me...
Diaphragm Walls as Permanent Basement Walls in Regions of High Seismicity
Diaphragm Walls as Permanent Basement Walls in Regions of High Seismicity
Reinforced concrete structural slurry walls have been used in the United States since the early 1960s. The typical practice, and one that makes the econom...
New Equipment and Method for Evaluating Anti-Water-Invasion Ability of Cement Slurry
New Equipment and Method for Evaluating Anti-Water-Invasion Ability of Cement Slurry
In adjustment well cementing of old areas, underground high-pressure water layers can invade the cement slurry, leading to poor cement-stone bonding and compromised cementing quali...
Optimalisasi Slurry dan Baglog Terhadap Peningkatan Kualitas Bahan Baku Kompos
Optimalisasi Slurry dan Baglog Terhadap Peningkatan Kualitas Bahan Baku Kompos
Pemanfaatan slurry dapat berpotensi sebagai sumber bahan baku kompos. Hal ini berkaitan dengan bahan organik dan nitrogen pada slurry yang tinggi. Slurry memiliki C/N rasio rendah ...
The influence of slurry viscosity on the resistance characteristics of debris flow
The influence of slurry viscosity on the resistance characteristics of debris flow
<p>The slurry viscosity has significant influence on the movement of debris flow by affecting the resistance characteristics of the debris flow. Slurry viscosity affe...

