Prelude FLNG Towing, Station-Keeping and Mooring Hook-Up

View through CrossRef
Prelude FLNG ("Prelude"), the largest offshore floating facility ever built, was constructed in Geoje, South Korea, requiring a 3,200nm ocean tow to its installation location 475km north northeast of Broome, Western Australia. A team of station keeping vessels then took control of Prelude to accurately hold her in position above the pre-laid moorings for mooring hook-up operations. Planning and executing the tow, station keeping and mooring hook-up operations for mega floaters in remote locations requires precise planning, bespoke solutions to unprecedented challenges, comprehensive testing over a prolonged period and a global team with a diverse skill set. Overcoming key challenges required extensive engineering coupled with state-of-the-art vessel simulations, a bespoke mooring handling system, and full-scale winch wire testing. The result was a safe, successful and efficient operation demonstrating the industry's ability to execute the unprecedented challenges of projects in the search for economic development of remote and challenging reservoirs.
Title: Prelude FLNG Towing, Station-Keeping and Mooring Hook-Up
Description:
Prelude FLNG ("Prelude"), the largest offshore floating facility ever built, was constructed in Geoje, South Korea, requiring a 3,200nm ocean tow to its installation location 475km north northeast of Broome, Western Australia.
A team of station keeping vessels then took control of Prelude to accurately hold her in position above the pre-laid moorings for mooring hook-up operations.
Planning and executing the tow, station keeping and mooring hook-up operations for mega floaters in remote locations requires precise planning, bespoke solutions to unprecedented challenges, comprehensive testing over a prolonged period and a global team with a diverse skill set.
Overcoming key challenges required extensive engineering coupled with state-of-the-art vessel simulations, a bespoke mooring handling system, and full-scale winch wire testing.
The result was a safe, successful and efficient operation demonstrating the industry's ability to execute the unprecedented challenges of projects in the search for economic development of remote and challenging reservoirs.

Related Results

Flng Lean – A Natural Development
Flng Lean – A Natural Development
Abstract Construction of the Shell Prelude FLNG facility is currently well underway. When completed, the facility is expected to export LNG, LPG and condensate from ...
Floating LNG - Groundbreaking Innovation Becoming a Reality
Floating LNG - Groundbreaking Innovation Becoming a Reality
Abstract While today's volatile business environment - including the global financial crisis; technological advancements, maturing 'easy gas' developments, height...
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Abstract Mooring systems utilizing polyester ropes have facilitated exploration and production of deepwater fields and represent a step-change in mooring system d...
Dynamic Positioning in Single-Point Moorings
Dynamic Positioning in Single-Point Moorings
ABSTRACT This paper deals with the concept of and a system for complete control of the slowly varying bow motion of a bow-moored ship using dynamic positioning. ...
A New Approach to future FLNG for Offshore Gas Monetization
A New Approach to future FLNG for Offshore Gas Monetization
Abstract A new approach to future FLNG is presented which will significantly reduce the overall CAPEX, EPCIC schedule, and OPEX compared to past conventional bespoke...
Prelude’s Remarkable Turbomachinery - The Story From Selection To First Drop Of LNG
Prelude’s Remarkable Turbomachinery - The Story From Selection To First Drop Of LNG
Abstract This is the story of the remarkable turbomachinery of the Prelude floating liquefied natural gas (FLNG) facility that was selected, designed, manufactured a...
Mooring Safety Assessment Using Reliability Techniques
Mooring Safety Assessment Using Reliability Techniques
ABSTRACT The paper deals with the reliability of offshore mooring systems. Reliability techniques have been applied to assess mooring systems designed by the quas...
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Compared with the traditional catenary or semi-taut mooring lines, the taut mooring system is more advantageous in many aspects, such as reduction of mooring line loads, erosion an...

Back to Top