A New Approach to future FLNG for Offshore Gas Monetization

View through CrossRef
Abstract A new approach to future FLNG is presented which will significantly reduce the overall CAPEX, EPCIC schedule, and OPEX compared to past conventional bespoke FLNG designs and project execution methods. Using a standardized design approach on both FLNG topside and Hull, this new FLNG concept will provide standardized design of liquefaction and process modules with flexible and standardized hull forms and cargo containment systems. This FLNG concept can be deployed around world near shore or offshore with Jetty or Single Point Mooring, such as SSY or an External Turret. The standardization approach enables reduction in the EPCIC cost and schedule so that it becomes a more attractive solution for Gas Monetization. The paper will describe: ➢ Topside Modularization is based on functionality and Standardized design for easy integration and assembly for various sizes of production capacity and pre-process requirements. ➢ Environmentally friendly approach using highly efficient SMR technology employing aero-derivative gas turbine utilizing waste heat recovery to lower the carbon dioxide footprint. ➢ Patented turbo-expander based NGL recovery process and feed gas booster can provide flexibility in a range of deployment scenarios with standardized design of refrigeration and liquefaction modules. ➢ Embedded Advanced Control (WACTM) with ICSS can significantly reduce the number of operators on board and ultimately achieve unmanned operation. ➢ Proven robust SPB cargo containment system with standardized tank design provides storage for both LNG and LPG that fits standardized hull dimensions. ➢ EPCIC project execution by a single contractor on topside, hull, construction, integration, pre-commissioning, and gas trials to reduce interface, save cost and shorten schedule ➢ Completion of gas trials at LNG terminal before transportation to reduce the cost and risk of onsite commissioning issues. This new FLNG concept can be applied to a capacity range from 1 MTPA to 4 MTPA with different combination of standardized functional plug-in modules. It can be optimized to accommodate feed gas range from associated to non-associated gas streams, and can be deployed either offshore or near-shore with a standardized hull design adapted for different mooring systems. This new FLNG concept can greatly reduce the risks with project execution and overall schedule, thus providing an ideal solution for Offshore Gas Monetization.
Title: A New Approach to future FLNG for Offshore Gas Monetization
Description:
Abstract A new approach to future FLNG is presented which will significantly reduce the overall CAPEX, EPCIC schedule, and OPEX compared to past conventional bespoke FLNG designs and project execution methods.
Using a standardized design approach on both FLNG topside and Hull, this new FLNG concept will provide standardized design of liquefaction and process modules with flexible and standardized hull forms and cargo containment systems.
This FLNG concept can be deployed around world near shore or offshore with Jetty or Single Point Mooring, such as SSY or an External Turret.
The standardization approach enables reduction in the EPCIC cost and schedule so that it becomes a more attractive solution for Gas Monetization.
The paper will describe: ➢ Topside Modularization is based on functionality and Standardized design for easy integration and assembly for various sizes of production capacity and pre-process requirements.
➢ Environmentally friendly approach using highly efficient SMR technology employing aero-derivative gas turbine utilizing waste heat recovery to lower the carbon dioxide footprint.
➢ Patented turbo-expander based NGL recovery process and feed gas booster can provide flexibility in a range of deployment scenarios with standardized design of refrigeration and liquefaction modules.
➢ Embedded Advanced Control (WACTM) with ICSS can significantly reduce the number of operators on board and ultimately achieve unmanned operation.
➢ Proven robust SPB cargo containment system with standardized tank design provides storage for both LNG and LPG that fits standardized hull dimensions.
➢ EPCIC project execution by a single contractor on topside, hull, construction, integration, pre-commissioning, and gas trials to reduce interface, save cost and shorten schedule ➢ Completion of gas trials at LNG terminal before transportation to reduce the cost and risk of onsite commissioning issues.
This new FLNG concept can be applied to a capacity range from 1 MTPA to 4 MTPA with different combination of standardized functional plug-in modules.
It can be optimized to accommodate feed gas range from associated to non-associated gas streams, and can be deployed either offshore or near-shore with a standardized hull design adapted for different mooring systems.
This new FLNG concept can greatly reduce the risks with project execution and overall schedule, thus providing an ideal solution for Offshore Gas Monetization.

Related Results

Flng Lean – A Natural Development
Flng Lean – A Natural Development
Abstract Construction of the Shell Prelude FLNG facility is currently well underway. When completed, the facility is expected to export LNG, LPG and condensate from ...
Floating LNG - Groundbreaking Innovation Becoming a Reality
Floating LNG - Groundbreaking Innovation Becoming a Reality
Abstract While today's volatile business environment - including the global financial crisis; technological advancements, maturing 'easy gas' developments, height...
Offshore Liquefied Natural Gas LNG and Monetization
Offshore Liquefied Natural Gas LNG and Monetization
Abstract The growing global energy demand and the ecological advantages of low ozone depleting substance resulting from combustion of the natural gas products leads ...
Reviewing the development of floating LNG facilities and their global impact
Reviewing the development of floating LNG facilities and their global impact
This Review encapsulates a comprehensive review of the development and global impact of Floating Liquefied Natural Gas (FLNG) facilities. These innovative structures have revolutio...
Gas Explosion Analysis for FLNG Plant Layout Design
Gas Explosion Analysis for FLNG Plant Layout Design
Recently, the natural gas is expected to be an environmentally friendlier energy and alternative to the nuclear energy. In the social situation, many oil and gas and engineering co...
Research Analysis of Reforming Hydrogen Fuel for FLNG Application
Research Analysis of Reforming Hydrogen Fuel for FLNG Application
Abstract The LNG production platform is one of the main contributors of carbon emissions in the Marine and Offshore industry. It's called floating liquid natural gas...
Prelude’s Remarkable Turbomachinery - The Story From Selection To First Drop Of LNG
Prelude’s Remarkable Turbomachinery - The Story From Selection To First Drop Of LNG
Abstract This is the story of the remarkable turbomachinery of the Prelude floating liquefied natural gas (FLNG) facility that was selected, designed, manufactured a...
Cost Optimized Solutions for Near Shore FLNG
Cost Optimized Solutions for Near Shore FLNG
Abstract Offshore development project are facing significant challenges from current market environment. Due to current low price of oil and gas, the development of ...