Design Methodology for Converting a MODU into a FPU
View through CrossRef
Abstract
There are many idle mobile offshore drilling units (MODU) that present potential opportunities to reduce the cost of field development. This paper summarizes the background and proposes a design methodology that can be applied when companies look into the potential of modifying semisubmersible MODUs to floating production units (FPU).
The focus will be on the relevant commercial aspects that need to be taken into account, followed by the engineering efforts required for modification of the hull and main marine systems and the replacement of drilling systems by process topsides. There are some key differences in the design drivers for semisubmersible MODUs and FPUs that need to be taken into account when considering a conversion. This further governs the requirements for modifications and upgrades of a semisubmersible MODU in order to operate as a FPU. Based on the above, a case study has been executed.
Expected required modifications and upgrades are outlined in the paper. Further, some options for improving payload capacity are presented and discussed in terms of cost, payload increase and overall impact on the FPU design. There are several technical and commercial aspects that affect the viability of converting semisubmersible MODUs to FPUs, including but not limited to: production capacity/profile, environmental conditions, existing infrastructure, mooring and riser system requirements, contractual model, CAPEX for MODU and conversion scope. On the basis of the above, and an overall assessment of the current market and availability of MODUs, a qualitative feasibility evaluation has been performed and is presented in the paper.
The need to reduce the cost of deepwater projects is vital if projects are to be sanctioned and move forward. We must find innovative ways to drive out cost if the industry is to survive. Conversion of MODUs to FPUs may prove to provide an opportunity to achieve this.
Title: Design Methodology for Converting a MODU into a FPU
Description:
Abstract
There are many idle mobile offshore drilling units (MODU) that present potential opportunities to reduce the cost of field development.
This paper summarizes the background and proposes a design methodology that can be applied when companies look into the potential of modifying semisubmersible MODUs to floating production units (FPU).
The focus will be on the relevant commercial aspects that need to be taken into account, followed by the engineering efforts required for modification of the hull and main marine systems and the replacement of drilling systems by process topsides.
There are some key differences in the design drivers for semisubmersible MODUs and FPUs that need to be taken into account when considering a conversion.
This further governs the requirements for modifications and upgrades of a semisubmersible MODU in order to operate as a FPU.
Based on the above, a case study has been executed.
Expected required modifications and upgrades are outlined in the paper.
Further, some options for improving payload capacity are presented and discussed in terms of cost, payload increase and overall impact on the FPU design.
There are several technical and commercial aspects that affect the viability of converting semisubmersible MODUs to FPUs, including but not limited to: production capacity/profile, environmental conditions, existing infrastructure, mooring and riser system requirements, contractual model, CAPEX for MODU and conversion scope.
On the basis of the above, and an overall assessment of the current market and availability of MODUs, a qualitative feasibility evaluation has been performed and is presented in the paper.
The need to reduce the cost of deepwater projects is vital if projects are to be sanctioned and move forward.
We must find innovative ways to drive out cost if the industry is to survive.
Conversion of MODUs to FPUs may prove to provide an opportunity to achieve this.
Related Results
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
Risk Factors for Facial Pressure Ulcers in Patients Who Underwent Prolonged Prone Orthopedic Spine Surgery
Risk Factors for Facial Pressure Ulcers in Patients Who Underwent Prolonged Prone Orthopedic Spine Surgery
Mini
This study evaluated incidence and risk factors associated with the development of facial pressure ulcers (FPU) in patients who underwent spine surgery in prone po...
Sandwich‐Structured PI‐FPU/Celgard/PI‐FPU Separator for Long‐Life Room‐Temperature Sodium–Sulfur Batteries
Sandwich‐Structured PI‐FPU/Celgard/PI‐FPU Separator for Long‐Life Room‐Temperature Sodium–Sulfur Batteries
The shuttle effect of polysulfides and the piercing of dendrites severely limit the cycling stability and safety of room‐temperature sodium–sulfur (RT Na–S) batteries. To address t...
SS: MODU Anchor-Regional Analysis of Seafloor and Near Surface Sediments for MODU Anchors
SS: MODU Anchor-Regional Analysis of Seafloor and Near Surface Sediments for MODU Anchors
Abstract
A significant challenge of predicting Mobile Offshore Drilling Unit (MODU) anchor performance is the lack of detailed sediment information. There are sev...
SS: MODU Risk-Moored MODU Risk Assessment
SS: MODU Risk-Moored MODU Risk Assessment
Abstract
During the Gulf of Mexico (GoM) hurricane seasons of 2004, 2005 and 2008, numerous moored Mobile Offshore Drilling Units (MODUs) had complete mooring sys...
SS: MODU Risk-MODU Mooring Strength and Reliability JIP Overview
SS: MODU Risk-MODU Mooring Strength and Reliability JIP Overview
Abstract
The MODU Mooring Strength and Reliability Joint Industry Project (JIP) was a massive industry effort that involved all sectors of the MODU mooring indust...
Fiscal Uncertainty and Time-Varying Expected Market Returns
Fiscal Uncertainty and Time-Varying Expected Market Returns
This study examines the predictive ability of fiscal policy uncertainty (FPU) for future stock market excess returns. We show that FPU is a strong positive predictor of returns bot...
Energy carriers investigation in the Fermi-Pasta-Ulam β lattice
Energy carriers investigation in the Fermi-Pasta-Ulam β lattice
Recently, heat conduction in low-dimensional materials has attracted much attention. The energy carriers responsible for the heat conduction in the Fermi-Pasta-Ulam (FPU) β lattice...