Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

ANALYSIS OF SMK3 IMPLEMENTATION LEVEL AND ACCIDENT RISK IN THE ADMINISTRATION OFFICE BUILDING DEVELOPMENT PROJECT AT GUSTI NGURAH RAI AIRPORT BALI

View through CrossRef
Every construction project, whether high-tech or simple, certainly has risks in its implementation process, therefore it is necessary to establish an Occupational Safety and Health Management System to minimize Occupational Safety and Health (K3) risks, but there are still many construction companies that are lacking in identifying K3 risks. and implementing an Occupational Health and Safety Management System (SMK3) in the process of implementing a construction project. The purpose of this study was to determine the level of OSH risk based on work items, as well as to measure the level of implementation of SMK3 in a construction project. In this research, the object of the case study is the construction project of the Administration Office Building at I Gusti Ngurah Rai Airport, Bali, during the lower structure work. After carrying out risk identification, 35 risk questions and 5 jobs are obtained, namely Borepile, Pilecap, Pendestal Column, Sloff, Roof Frame, then the results of the identification are processed and the risk level is obtained from the implementation of the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali. Enter the Medium Category with a risk value of 8.69, while for the implementation of the Occupational Safety and Health Management System (SMK) the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali is included in the good category with a total application value of 83%. Hopefully this research can become a reference in identifying K3 risks and a reference in implementing the Occupational Health and Safety Management System (SMK).
Title: ANALYSIS OF SMK3 IMPLEMENTATION LEVEL AND ACCIDENT RISK IN THE ADMINISTRATION OFFICE BUILDING DEVELOPMENT PROJECT AT GUSTI NGURAH RAI AIRPORT BALI
Description:
Every construction project, whether high-tech or simple, certainly has risks in its implementation process, therefore it is necessary to establish an Occupational Safety and Health Management System to minimize Occupational Safety and Health (K3) risks, but there are still many construction companies that are lacking in identifying K3 risks.
and implementing an Occupational Health and Safety Management System (SMK3) in the process of implementing a construction project.
The purpose of this study was to determine the level of OSH risk based on work items, as well as to measure the level of implementation of SMK3 in a construction project.
In this research, the object of the case study is the construction project of the Administration Office Building at I Gusti Ngurah Rai Airport, Bali, during the lower structure work.
After carrying out risk identification, 35 risk questions and 5 jobs are obtained, namely Borepile, Pilecap, Pendestal Column, Sloff, Roof Frame, then the results of the identification are processed and the risk level is obtained from the implementation of the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali.
Enter the Medium Category with a risk value of 8.
69, while for the implementation of the Occupational Safety and Health Management System (SMK) the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali is included in the good category with a total application value of 83%.
Hopefully this research can become a reference in identifying K3 risks and a reference in implementing the Occupational Health and Safety Management System (SMK).

Related Results

The Effect of Service Quality in International Airport I Gusti Ngurah Rai on Satisfaction, Image, and Tourists Loyalty Who Visited Bali
The Effect of Service Quality in International Airport I Gusti Ngurah Rai on Satisfaction, Image, and Tourists Loyalty Who Visited Bali
Airport are the first and the last contact point for tourists when they arrive at their holiday destination. Therefore, the airport facilities are a source of first impression that...
SISTEM INFORMASI PENERIMAAN BEA MASUK DI KPPBC NGURAH RAI
SISTEM INFORMASI PENERIMAAN BEA MASUK DI KPPBC NGURAH RAI
ABSTRACT This study aims to discuss the information system of import duty that focuses on the procedure of receipt of import duties, potential threats to each process and internal ...
OPTIMIZATION INTERNATIONAL AIRPORT CAPACITY I GUSTI NGURAH RAI BALI
OPTIMIZATION INTERNATIONAL AIRPORT CAPACITY I GUSTI NGURAH RAI BALI
This study discuss about optimization capacity on land new to I Gusti Airport International Ngurah Rai, Bali with review evaluation capacity moment this . Development Airport Ngura...
PROGRAM ACARA GEGIRANG SEBAGAI MEDIA KOMUNIKASI BERLANDASKAN AGAMA HINDU DI LEMBAGA PENYIARAN PUBLIK (LPP) TVRI STASIUN BALI
PROGRAM ACARA GEGIRANG SEBAGAI MEDIA KOMUNIKASI BERLANDASKAN AGAMA HINDU DI LEMBAGA PENYIARAN PUBLIK (LPP) TVRI STASIUN BALI
Lembaga Penyiaran Publik (LPP) TVRI Stasiun Bali merupakan salah stasiun televisi lokal milik pemerintah Republik Indonesia yang dekat dengan budaya masyarakat setempat. Selain pen...
Penerapan Eco Airport Pada Bandar Udara Internasional I Gusti Ngurah Rai
Penerapan Eco Airport Pada Bandar Udara Internasional I Gusti Ngurah Rai
Meningkatnya aktifitas di bandar udara berpengaruh terhadap meningkatnya lalu lintas udara yang dapat berpengaruh terhadap kualitas udara lokal yang dapat menggangu kesehatan masya...
Kajian Tentang Fasilitas Sisi Darat Bandara Ngurah Rai
Kajian Tentang Fasilitas Sisi Darat Bandara Ngurah Rai
Ngurah Rai Airport, Denpasar can be categorized as a gate economic activity nationally and internationally. This is because the Ngurah Rai Airport, Denpasar, Bali Island which lies...

Back to Top