Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
View through CrossRef
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450 GeV/c and an average beam power of up to ∼270 kW. This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project. This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback. The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel.
Published by the American Physical Society
2024
American Physical Society (APS)
A. Romero Francia
A. Perillo Marcone
S. Pianese
K. Andersen
G. Arnau Izquierdo
J. A. Briz
D. Carbajo Perez
E. Carlier
T. Coiffet
L. S. Esposito
J. L. Grenard
D. Grenier
J. Humbert
K. Kershaw
J. Lendaro
A. Ortega Rolo
K. Scibor
D. Senajova
S. Sgobba
C. Sharp
D. Steyaert
F. M. Velotti
H. Vincke
V. Vlachoudis
M. Calviani
Title: Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
Description:
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments.
The SPS has been in operation since 1976, and it has been upgraded over the years.
For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function.
The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450 GeV/c and an average beam power of up to ∼270 kW.
This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project.
This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years.
The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation.
The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping.
To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process.
A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel.
Published by the American Physical Society
2024.
Related Results
Magic graphs
Magic graphs
DE LA TESIS<br/>Si un graf G admet un etiquetament super edge magic, aleshores G es diu que és un graf super edge màgic. La tesis està principalment enfocada a l'estudi del c...
Product of digraphs, (super) edge-magic valences and related problems
Product of digraphs, (super) edge-magic valences and related problems
Discrete Mathematics, and in particular Graph Theory, has gained a lot of popularity during the last 7 decades. Among the many branches in Graph Theory, graph labelings has experim...
Acid mine drainage generation potential of waste rocks using weathering cell test in gold mine, Thailand
Acid mine drainage generation potential of waste rocks using weathering cell test in gold mine, Thailand
In gold mine, tons of waste rocks produced and left under atmospheric condition may consequently generate acid mine drainage (AMD). The aims of this study was to predict the AMD ge...
SU‐E‐T‐47: A Monte Carlo Model of a Spot Scanning Proton Beam Based On a Synchrotron Proton Therapy Accelerator
SU‐E‐T‐47: A Monte Carlo Model of a Spot Scanning Proton Beam Based On a Synchrotron Proton Therapy Accelerator
Purpose:To build the model of a spot scanning proton beam for the dose calculation of a synchrotron proton therapy accelerator, which is capable of accelerating protons from 50 up ...
Advancements in optics control at the CERN Proton Synchrotron
Advancements in optics control at the CERN Proton Synchrotron
The CERN Proton Synchrotron (PS), operational since 1959, remains a critical component in CERN's accelerator complex, supporting downstream experiments and serving as an injector f...
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED]➪ACV Super Slim Gummies - Official Website Link - Click Here To Buy❤️ ✪Product Name ➯ ACV Super Slim Gummies UK✪Main Benefits ➯ Can help you with all your overweight i...
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED]➪ACV Super Slim Gummies - Official Website Link - Click Here To Buy❤️ ✪Product Name ➯ ACV Super Slim Gummies UK✪Main Benefits ➯ Can help you with all your overweight i...
Study on Dosimetry Technology of Absorbed Dose to Water for Proton
Study on Dosimetry Technology of Absorbed Dose to Water for Proton
In proton therapy, precise energy transfer to tissues is crucial for cancer treatment, as accurate dose delivery directly influences tumor control efficiency and minimizes radiatio...