Bonga Deepwater Project Mid-Life Abandonment Campaign – A Success Story

View through CrossRef
Abstract When oil and gas wells have been produced to the end of useful life, when the cost of production relative to the value derived converge to a point when producing the well is no longer profitable, the wells are decommissioned. Oil and gas well decommissioning and restoration refers to the process of permanently sealing and abandoning oil and gas producing reservoirs within a wellbore that are no longer productive or economical to operate, in a way that ensures safety and environmental protection in accordance with industry and local regulatory standards and requirements. As part of this philosophy, The project strategy was to decommission and abandon depleted wells as they reach their end of useful life in accordance with Shell PLC guidelines and local regulation as specified in Environmental Guidelines and Standards for the Petroleum Industry In Nigeria (EGASPIN). The field's midlife abandonment project was a first in deep water environment in Nigeria, developed and executed to permanently abandon selected wells that have reached their end of useful life by permanently isolating the reservoirs zones that are capable of flow and restoring caprock. This was achieved by recovering the completion, production and intermediate casing strings to expose the reservoirs traversed by the wellbore, then restoring the caprock using cement plugs which were set to create a rock-to-rock isolation of all zones with flow potential within the primary wellbore. The objective was to prevent crossflow between reservoir zones, isolate the reservoirs from the environment and marine life while safeguarding all subsea infrastructure from damage arising from the well abandonment operations. In total, thirteen wells with varying degrees of complexity were successfully decommissioned and restored without incidents or accidents. The fourteenth well had to be re-suspended due to multiple complex challenges which emerged during the abandonment campaign. The well needed to be replanned, ensuring the required equipment to execute the emerging challenges were available. As with every new project, several challenges were encountered, and new ideas were developed. These ideas include achieving better well integrity coupled with improved tubing and casing recovery practices and optimized cement plug placement will be a foundation for future deep water well abandonment in Nigeria specifically and the industry at large. The learnings from the project were adopted to generate a Standard Operating Procedure (SOP) for deep water well abandonment. These SOPs and all other learnings and best practices that led to the success of the mid-life abandonment campaign will be adopted in executing the end of field life abandonment for the project and will be shared on this paper.
Title: Bonga Deepwater Project Mid-Life Abandonment Campaign – A Success Story
Description:
Abstract When oil and gas wells have been produced to the end of useful life, when the cost of production relative to the value derived converge to a point when producing the well is no longer profitable, the wells are decommissioned.
Oil and gas well decommissioning and restoration refers to the process of permanently sealing and abandoning oil and gas producing reservoirs within a wellbore that are no longer productive or economical to operate, in a way that ensures safety and environmental protection in accordance with industry and local regulatory standards and requirements.
As part of this philosophy, The project strategy was to decommission and abandon depleted wells as they reach their end of useful life in accordance with Shell PLC guidelines and local regulation as specified in Environmental Guidelines and Standards for the Petroleum Industry In Nigeria (EGASPIN).
The field's midlife abandonment project was a first in deep water environment in Nigeria, developed and executed to permanently abandon selected wells that have reached their end of useful life by permanently isolating the reservoirs zones that are capable of flow and restoring caprock.
This was achieved by recovering the completion, production and intermediate casing strings to expose the reservoirs traversed by the wellbore, then restoring the caprock using cement plugs which were set to create a rock-to-rock isolation of all zones with flow potential within the primary wellbore.
The objective was to prevent crossflow between reservoir zones, isolate the reservoirs from the environment and marine life while safeguarding all subsea infrastructure from damage arising from the well abandonment operations.
In total, thirteen wells with varying degrees of complexity were successfully decommissioned and restored without incidents or accidents.
The fourteenth well had to be re-suspended due to multiple complex challenges which emerged during the abandonment campaign.
The well needed to be replanned, ensuring the required equipment to execute the emerging challenges were available.
As with every new project, several challenges were encountered, and new ideas were developed.
These ideas include achieving better well integrity coupled with improved tubing and casing recovery practices and optimized cement plug placement will be a foundation for future deep water well abandonment in Nigeria specifically and the industry at large.
The learnings from the project were adopted to generate a Standard Operating Procedure (SOP) for deep water well abandonment.
These SOPs and all other learnings and best practices that led to the success of the mid-life abandonment campaign will be adopted in executing the end of field life abandonment for the project and will be shared on this paper.

Related Results

Impact of Planning and Experience in Well Abandonment - Lessons Learned from Complex Well Abandonment in Bonga Deepwater Field
Impact of Planning and Experience in Well Abandonment - Lessons Learned from Complex Well Abandonment in Bonga Deepwater Field
Abstract The abandonment of deepwater oil and gas fields has become increasingly prevalent over the past decade as these assets reach the end of their productive and...
Bonga-Flow Assurance Benchmarking via Field Surveillance
Bonga-Flow Assurance Benchmarking via Field Surveillance
Abstract Bonga - the first Deepwater development in Nigeria - commenced production in Q4 2005. At an early stage of the project, flow assurance was identified as ...
First Rigless Intervention in Bonga Deepwater
First Rigless Intervention in Bonga Deepwater
Abstract In the Bonga Deepwater project, while exploring subsea well intervention and stimulation campaign opportunity, the subsea Rigless intervention strategy, whi...
The Future of Regulations for the Deepwater GOM
The Future of Regulations for the Deepwater GOM
Abstract Deepwater oil and gas activities in the U.S. Gulf of Mexico Outer ContinentalShelf (OCS) are regulated by the Minerals Management Service (MMS). The leve...
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
Abstract The extensive industry experience with design, fabrication, installation, and operation of TLPs in water depths up to 4,000 ft has demonstrated the flexi...
Production Optimization in Bonga Deepwater Through Rigless Intervention
Production Optimization in Bonga Deepwater Through Rigless Intervention
Abstract Maximizing oil recovery and production remains paramount in Deepwater operations. This paper focuses on enhanced oil recovery and production optimization in...
Maximizing Profits Associated With Abandonment Decisions And Options
Maximizing Profits Associated With Abandonment Decisions And Options
Abstract Economic strategies which are designed to maximise profits associated with abandonment decisions and options focus on:-Extending field lifeOffsetting of ...
First Deepwater Plug and Abandonment Project in Nigeria
First Deepwater Plug and Abandonment Project in Nigeria
Abstract As oil and gas reservoirs are systematically exploited, the constant drilling of new wells remains imperative to maximize reservoir productivity. Inevitably...