Javascript must be enabled to continue!
Rearranging First-In First-Out (FIFO) Parts Layouts
View through CrossRef
Surabaya locomotive warehouse is one part of the company PT. Kereta Api Indonesia (Persero) as a place to store spare parts for repair and maintenance purposes, especially locomotives. The implementation of these inspections and repairs, of course, requires spare parts to facilitate the maintenance process which generally spare parts are placed in storage or warehouses. The problem in the Surabaya locomotive warehouse is that the arrangement of spare parts for bin boxes for each type of group is not always fixed so that the search becomes a bit hampered. This study aims to review the repair of bin box spare parts placement on a regular basis by using the First-In First-Out (FIFO) approach to sort bin box spare parts based on their movement flow. Based on the results of the analysis, the classification of bin boxes in each type of spare parts rack group based on the flow of movement in sequence is fast moving, medium moving, and slow moving. In the fast moving spare parts bin boxes are placed on the bottom row of shelves, bin boxes that have medium moving spare parts are placed on the second and third rows of shelves. Meanwhile, bin boxes that have slow-moving spare parts will be placed on the top shelf. After classifying the spare parts in the bin box, an addressing area is made on each row of the rack to determine the location of the spare part position.
Universitas Muhammadiyah Sidoarjo
Title: Rearranging First-In First-Out (FIFO) Parts Layouts
Description:
Surabaya locomotive warehouse is one part of the company PT.
Kereta Api Indonesia (Persero) as a place to store spare parts for repair and maintenance purposes, especially locomotives.
The implementation of these inspections and repairs, of course, requires spare parts to facilitate the maintenance process which generally spare parts are placed in storage or warehouses.
The problem in the Surabaya locomotive warehouse is that the arrangement of spare parts for bin boxes for each type of group is not always fixed so that the search becomes a bit hampered.
This study aims to review the repair of bin box spare parts placement on a regular basis by using the First-In First-Out (FIFO) approach to sort bin box spare parts based on their movement flow.
Based on the results of the analysis, the classification of bin boxes in each type of spare parts rack group based on the flow of movement in sequence is fast moving, medium moving, and slow moving.
In the fast moving spare parts bin boxes are placed on the bottom row of shelves, bin boxes that have medium moving spare parts are placed on the second and third rows of shelves.
Meanwhile, bin boxes that have slow-moving spare parts will be placed on the top shelf.
After classifying the spare parts in the bin box, an addressing area is made on each row of the rack to determine the location of the spare part position.
Related Results
Pernerapan Algoritma Multilevel Feedback Queue (MFQ) & First In First Out (FIFO) pada Studi Kasus di Toko Bunga ARTHA PUSPA
Pernerapan Algoritma Multilevel Feedback Queue (MFQ) & First In First Out (FIFO) pada Studi Kasus di Toko Bunga ARTHA PUSPA
Artha Puspa is a flower shop in Madiun which sells plant needs. This very rapid business development encourages every entrepreneur to create a form that is different from other bus...
Penerapan metode first in first out (fifo) pada bahan makanan di hotel fairfield by marriot bali legian
Penerapan metode first in first out (fifo) pada bahan makanan di hotel fairfield by marriot bali legian
Banyak manfaat yang kita dapatkan apabila menerapkan sistem first in first out dalam penyimpanan bahan makanan apalagi untuk sebuah hotel, karna memberikan dan menghasilkan makanan...
Formal Verification of Communicating Automata
Formal Verification of Communicating Automata
Vérification formelle des automates communicants
Les systèmes distribués concernent des processus qui s’exécutent indépendamment et communiquent de manière asynchro...
Numerical Analysis of Dynamic Interaction Between Two Closely Spaced Vertical Axis Wind Turbines
Numerical Analysis of Dynamic Interaction Between Two Closely Spaced Vertical Axis Wind Turbines
To investigate the optimum layouts of small vertical axis wind turbines, a two-dimensional analysis of dynamic fluid body interaction is performed via computational fluid dynamics ...
Analisis Desain terhadap Manajemen Stockpile Batubara di PT. Era Perkasa Mining
Analisis Desain terhadap Manajemen Stockpile Batubara di PT. Era Perkasa Mining
Abstrak. Stockpile batubara adalah area penyimpanan sementara tempat batubara dari area penambangan ditumpuk sebelum digunakan atau dikirim. PT Era Perkasa Mining (EPM), berlokasi ...
Influences on Apartment Design: A History of the Spatial Layout of Apartment Buildings in Sydney and Implications for the Future
Influences on Apartment Design: A History of the Spatial Layout of Apartment Buildings in Sydney and Implications for the Future
This paper traces the history of apartment design with an emphasis on spatial layout. It charts the events that have influenced apartment design in Sydney, Australia and provides a...
Education on the First in First Out Method on Storing Animal Product in the Refrigerator
Education on the First in First Out Method on Storing Animal Product in the Refrigerator
Animal products are products that are easily damaged. One alternative to maintain shelf life is to store in the refrigerator. The aim of this activity is to provide education to ho...
DB-ATRG: The Density and BI-RADS–Aware Triage and Automatic Report Generation System for Mammography
DB-ATRG: The Density and BI-RADS–Aware Triage and Automatic Report Generation System for Mammography
ABSTRACT
Background
The growing volume of mammography screenings has created severe radiologist shortages, while standard First...

