Integrity Testing of Three Drilled and Grouted Piles
View through CrossRef
THE PROJECT
The work described in this article was done to evaluate the ability of oil field grout logging technology to determ1ne the integrity of drilled and grouted piles.
Three drilled and grouted piles were constructed at one of the two Texas A&M University sites for geotechnical experimentation. At the site the soil is a stiff to very stiff clay. One boring with Shelby tube sampling and pressure meter testing was drilled. Three cone electrometer soundings were also performed. Unconsolidated Untrained Tests and some Drained Direct Shear Tests were performed. Figure 1 gives a summary of the soil data.
The drilled and grouted pile designed for logging purposes was 110 ft (33.5 m) long, and had an average diameter equal to 30 in. (0.76 m). The steel casing was 20 in. O.D. (0.51 m) and had a wall thickness equal to 0.75 in. (19 mm). The hole was drilled dry, the grout was placed at the bottom of the hole and the closed end steel casing was lowered to the bottom squeezing the grout up in the annulus. From 0 to 20 ft (0 to 6.1 m) the annulus was made of loose cuttings of clay, from 20 to 40 ft (6.1 to 12.2 m) the annulus was left unfilled by creating a 360° chamber void, from 40 to 60 ft (12.2 to 183 m) a 45° vertical channel void was created in the grout curtain, from 60 ft to 85 ft (18.3 to 26 m) the pile was fully grouted with a 5 in. (127 mm) thick grout curtain and from 85 to 110 ft (26 to 33.5 m) the pile was fully grouted with a 2 in. (5 mm) thick grout curtain. Figure 2 shows the pile.
The two drilled and grouted piles designed for capacity determination were 40 ft (12.2 m) long and 8 in. (203 mm) in diameter. The steel casings were 5 in. (127 mm) in diameter. The holes were drilled with betonies drilling mud, the grout was tremied to the bottom of the hole and the closed end casings were slowly lowered in place. The grout filled the annulus from 40 ft (12.2 m) depth to 5 ft (1.52 m) depth. The no defect pile had no purposely designed defects, while the defective pile had a 45° defect from 5 ft (1.52 m) to 25 ft (7.6 m) depth and a 45° defect from 15 ft (4.57 m) to 35 ft (10.7 m) depth at 180° from the other defect. Figure 3 shows the defective pile.
The logging pile and to a lesser extent the two load test piles were logged by Schlumberger with a series of sonic, ultrasonic, gamma-gamma, and neutron logging tools. A well head was placed on the three piles so that the logging could be done at various pressure levels.
The two load test piles were subjected to various tension load tests after the logging. This article gives the details of the logging part of the work.
Title: Integrity Testing of Three Drilled and Grouted Piles
Description:
THE PROJECT
The work described in this article was done to evaluate the ability of oil field grout logging technology to determ1ne the integrity of drilled and grouted piles.
Three drilled and grouted piles were constructed at one of the two Texas A&M University sites for geotechnical experimentation.
At the site the soil is a stiff to very stiff clay.
One boring with Shelby tube sampling and pressure meter testing was drilled.
Three cone electrometer soundings were also performed.
Unconsolidated Untrained Tests and some Drained Direct Shear Tests were performed.
Figure 1 gives a summary of the soil data.
The drilled and grouted pile designed for logging purposes was 110 ft (33.
5 m) long, and had an average diameter equal to 30 in.
(0.
76 m).
The steel casing was 20 in.
O.
D.
(0.
51 m) and had a wall thickness equal to 0.
75 in.
(19 mm).
The hole was drilled dry, the grout was placed at the bottom of the hole and the closed end steel casing was lowered to the bottom squeezing the grout up in the annulus.
From 0 to 20 ft (0 to 6.
1 m) the annulus was made of loose cuttings of clay, from 20 to 40 ft (6.
1 to 12.
2 m) the annulus was left unfilled by creating a 360° chamber void, from 40 to 60 ft (12.
2 to 183 m) a 45° vertical channel void was created in the grout curtain, from 60 ft to 85 ft (18.
3 to 26 m) the pile was fully grouted with a 5 in.
(127 mm) thick grout curtain and from 85 to 110 ft (26 to 33.
5 m) the pile was fully grouted with a 2 in.
(5 mm) thick grout curtain.
Figure 2 shows the pile.
The two drilled and grouted piles designed for capacity determination were 40 ft (12.
2 m) long and 8 in.
(203 mm) in diameter.
The steel casings were 5 in.
(127 mm) in diameter.
The holes were drilled with betonies drilling mud, the grout was tremied to the bottom of the hole and the closed end casings were slowly lowered in place.
The grout filled the annulus from 40 ft (12.
2 m) depth to 5 ft (1.
52 m) depth.
The no defect pile had no purposely designed defects, while the defective pile had a 45° defect from 5 ft (1.
52 m) to 25 ft (7.
6 m) depth and a 45° defect from 15 ft (4.
57 m) to 35 ft (10.
7 m) depth at 180° from the other defect.
Figure 3 shows the defective pile.
The logging pile and to a lesser extent the two load test piles were logged by Schlumberger with a series of sonic, ultrasonic, gamma-gamma, and neutron logging tools.
A well head was placed on the three piles so that the logging could be done at various pressure levels.
The two load test piles were subjected to various tension load tests after the logging.
This article gives the details of the logging part of the work.
Related Results
Improvement of seismic performance of ordinary reinforced partially grouted concrete masonry shear walls
Improvement of seismic performance of ordinary reinforced partially grouted concrete masonry shear walls
Reinforced masonry constitutes about 10% of all low-rise construction in the US. Most of these structures are commercial and school buildings. It may also be used for multi-story h...
Grouted Piles in Weak Carbonate Rocks
Grouted Piles in Weak Carbonate Rocks
ABSTRACT
This paper describes a proposed method of design for the axial capacity of grouted piles in weak carbonate rocks. The, method was developed during a deta...
New Data on Grouted Connections With Large Grout Dimensions
New Data on Grouted Connections With Large Grout Dimensions
ABSTRACT
The paper describes two studies into the static strength of grouted connections with low D/T ratios. These were performed as part of the development prog...
ACIP Pile Installation, Installation Monitoring, Full-scale Load Testing, and Extraction Program
ACIP Pile Installation, Installation Monitoring, Full-scale Load Testing, and Extraction Program
The Augered Cast-In-Place (ACIP) Pile Committee of the Deep Foundations Institute (DFI) performed a foundation installation, monitoring, performance and extraction program f...
Grouted Pile-to-Sleeve Connection Tests
Grouted Pile-to-Sleeve Connection Tests
ABSTRACT
Eighteen grouted pile-sleeve connections were tested to examine the influence of combined loading (moment and axial load), relative shear key location be...
Some Thoughts on API RP2A for Vertically Loaded Piles
Some Thoughts on API RP2A for Vertically Loaded Piles
INRODUCTION
API RP2A represents one of the very few design guidelines produced by the geotechnical profession The overwhelming success and the worldwide use of AP...
Casting and installation of segmental precast quadratic concrete driven geothermal energy piles
Casting and installation of segmental precast quadratic concrete driven geothermal energy piles
Geothermal energy pile foundations are used both for structural purposes and to provide sustainable, clean, and cost-effective ground energy for heating and cooling buildings [1]. ...
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
ABSTRACT
This paper is about Long Buoyant Flexible Pile Frames for support of deep-water offshore platforms. These Long Buoyant Flexible Pile Frame structures com...