An Investigation of Critical Factors for BIM-based Principles for Onsite Sequencing and Assembly Processes

View through CrossRef
Design buildability is an important aspect of Design for Manufacture and Assembly (DfMA) to examine the sequence of building or construction activities, prefabrication opportunities, and onsite assembly. The lack of tight integration between the assembly process and existing digital solutions, however, is a significant gap in onsite sequencing and assembly. This paper explores the critical factors for Building Information Modelling (BIM) based principles and other digital technologies that can support DfMA for appropriate decision-making in onsite sequencing and assembly. The literature review reveals the existing approaches to onsite sequencing and assembly (OSA), as well as identifies their missing key capabilities/features. Although BIM-based initiatives exist for various construction purposes, BIM for onsite sequencing and assembly has not received the required attention from academia and industry, and a qualitative study was conducted to understand gaps in construction sequencing, onsite assembly practices, and industry practitioners' expectations. The study identified 14 factors for streamlining onsite sequencing and assembly using existing BIM capabilities or principles, categorising them into four groups based on their relationships and interconnections. The study's findings are expected to enhance understanding of BIM principles and other technologies for onsite sequencing and assembly among construction professionals, including contributing to the existing knowledge of onsite assembly in a BIM environment.
Title: An Investigation of Critical Factors for BIM-based Principles for Onsite Sequencing and Assembly Processes
Description:
Design buildability is an important aspect of Design for Manufacture and Assembly (DfMA) to examine the sequence of building or construction activities, prefabrication opportunities, and onsite assembly.
The lack of tight integration between the assembly process and existing digital solutions, however, is a significant gap in onsite sequencing and assembly.
This paper explores the critical factors for Building Information Modelling (BIM) based principles and other digital technologies that can support DfMA for appropriate decision-making in onsite sequencing and assembly.
The literature review reveals the existing approaches to onsite sequencing and assembly (OSA), as well as identifies their missing key capabilities/features.
Although BIM-based initiatives exist for various construction purposes, BIM for onsite sequencing and assembly has not received the required attention from academia and industry, and a qualitative study was conducted to understand gaps in construction sequencing, onsite assembly practices, and industry practitioners' expectations.
The study identified 14 factors for streamlining onsite sequencing and assembly using existing BIM capabilities or principles, categorising them into four groups based on their relationships and interconnections.
The study's findings are expected to enhance understanding of BIM principles and other technologies for onsite sequencing and assembly among construction professionals, including contributing to the existing knowledge of onsite assembly in a BIM environment.

Related Results

BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
We are at a stage where Building Information Modelling (BIM) has reached a maturity level to be widely adopted by the professionals and organizations within the Architectural, Engi...
BIM implementation: an empirical validation for a four-wheel model
BIM implementation: an empirical validation for a four-wheel model
Purpose Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adopti...
Application of BIM visual programming algorithms for infrastructure projects
Application of BIM visual programming algorithms for infrastructure projects
(English) The BIM digitization has generated a growing automation of traditional AECO project development processes. However, this automation has mainly benefited building projects...
BIM implementation model from the standpoint of concern-based adoption theory
BIM implementation model from the standpoint of concern-based adoption theory
Purpose This study investigated the concerns and plans of construction professionals about building information modeling (BIM) implementation, found the acceptable BIM implementati...
Building information modeling for facility managers
Building information modeling for facility managers
A Decision Support System (DSS) can help facility managers to improve building performance, occupants’ comfort, and energy efficiency during the Operation and Maintenance (O&M)...
Building Information Modeling (BIM) Benefits and Challenges: Malaysian Construction Organization Experience
Building Information Modeling (BIM) Benefits and Challenges: Malaysian Construction Organization Experience
Building Information Modeling is an innovative technology coupled with process and human interactions. BIM has been used by the Architecture, Engineering, and Construction (AEC) in...
BIM critical factors and benefits for public sector
BIM critical factors and benefits for public sector
Goal: The purpose of this study is to develop a decision support framework to select critical success factors (CSFs) and benefits for the implementation of BIM in the public works ...

Back to Top