Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Disassembly sequence planning for maintenance based on metaheuristic method

View through CrossRef
PurposeMaintenance disassembly that involves separating failed components from an assembly or system plays a vital role in line maintenance of civil aircraft, and it is necessary to have an effective and optimal sequence planning in order to reduce time and cost in maintenance. The purpose of the paper is to develop a more effective disassembly sequence planning method for maintenance of large equipment including civil aircraft systems.Design/methodology/approachThe methodology involves the following steps: a component‐fastener graph is built to describe the equipment in terms of classifying components into two categories that are functional components and fasteners; interference matrix is developed to determine the removable component, and a disassembly sequence planning of functional components is proposed based on Dijkstra's algorithm; the disassembly sequence planning including fasteners is presented based on particle swarm optimization.FindingsAn application case, which takes the nose landing gear system of a regional jet as a study object, shows that the disassembly sequence planning method proposed in the paper can reduce the calculation complexity greatly, and its effectiveness is greater than that of a genetic algorithm‐based method, in most situations.Practical implicationsThe method proposed herein can acquire the optimal maintenance disassembly sequence, which can reduce the cost and time for maintenance of large equipment.Originality/valueA novel and effective disassembly sequence planning solution for maintenance of large equipment is presented, which can be applied to the line maintenance of civil aircraft.
Title: Disassembly sequence planning for maintenance based on metaheuristic method
Description:
PurposeMaintenance disassembly that involves separating failed components from an assembly or system plays a vital role in line maintenance of civil aircraft, and it is necessary to have an effective and optimal sequence planning in order to reduce time and cost in maintenance.
The purpose of the paper is to develop a more effective disassembly sequence planning method for maintenance of large equipment including civil aircraft systems.
Design/methodology/approachThe methodology involves the following steps: a component‐fastener graph is built to describe the equipment in terms of classifying components into two categories that are functional components and fasteners; interference matrix is developed to determine the removable component, and a disassembly sequence planning of functional components is proposed based on Dijkstra's algorithm; the disassembly sequence planning including fasteners is presented based on particle swarm optimization.
FindingsAn application case, which takes the nose landing gear system of a regional jet as a study object, shows that the disassembly sequence planning method proposed in the paper can reduce the calculation complexity greatly, and its effectiveness is greater than that of a genetic algorithm‐based method, in most situations.
Practical implicationsThe method proposed herein can acquire the optimal maintenance disassembly sequence, which can reduce the cost and time for maintenance of large equipment.
Originality/valueA novel and effective disassembly sequence planning solution for maintenance of large equipment is presented, which can be applied to the line maintenance of civil aircraft.

Related Results

Unified assembly- and disassembly-line model formulae
Unified assembly- and disassembly-line model formulae
Purpose – There is a rich body of literature on sequencing assembly and on sequencing disassembly, but little that either fuses or contrasts the two, which may be v...
Ordered release of genomic RNA during icosahedral virus disassembly
Ordered release of genomic RNA during icosahedral virus disassembly
AbstractTo release their genomic cargo, many icosahedral viruses undergo a series of ordered conformational changes via distinct disassembly intermediates that allow nucleic acid e...
Fuzzy-Clustering Based Cost Modeling of Disassembly Planning for EOL Products
Fuzzy-Clustering Based Cost Modeling of Disassembly Planning for EOL Products
Cost model is a key issue in the disassembly process planning, because the optimized disassembly sequence is determined by ranking several possible disassembly operations. In this ...
The interplay between molten globules and heme disassociation defines human hemoglobin disassembly
The interplay between molten globules and heme disassociation defines human hemoglobin disassembly
Abstract Hemoglobin functions as an oxygen transport protein, with each subunit containing a heme cofactor. We have developed a global disassembly model for human h...
Mitotic lamin disassembly is triggered by lipid-mediated signaling
Mitotic lamin disassembly is triggered by lipid-mediated signaling
Disassembly of the nuclear lamina is a key step during open mitosis in higher eukaryotes. The activity of several kinases, including CDK1 (cyclin-dependent kinase 1) and protein ki...
Research on the Assembly Sequence of a Ship Block Based on the Disassembly Interference Matrix
Research on the Assembly Sequence of a Ship Block Based on the Disassembly Interference Matrix
Reasonable optimized block assembly sequence has vital practical significance for ship construction, and the research has been done in this article at the aim of obtaining optimal ...

Back to Top