Multilateral Completion Technology to Improve Reservoir Management
View through CrossRef
Abstract
Effective well completion design is crucial to optimize well and field performance, with many operators utilizing different techniques to achieve this important objective. However, the conventional means of designating wells for reservoir monitoring and standalone wells for production presents challenges to cost-effective reservoir management.
Vertical observation wells are usually drilled in different locations to monitor the reservoir and assist with planning and intervention decisions by running periodic logs to obtain subsurface information. However, these wells can be costly and occupy valuable space that could be utilized for production. An alternate technique is to drill a pilot hole, perform all the necessary logging, and obtain the required reservoir information. The pilot hole is then plugged and sidetracked to a producer well. Nevertheless, the collected data only remains valid for a limited period due to potential changes to the reservoir.
The demand for cost-effective, optimized drilling of production and observation wells has led to a paradigm shift in multilateral well technology that achieves both production and monitoring objectives for both laterals at the same time. Using this enhanced technology, wells can be completed with a pilot hole (vertical) drilled for reservoir evaluation throughout the life of the well, with permanent downhole gauges (PDHGs) installed for pressure and temperature monitoring, while the horizontal lateral functions as an oil and gas producer. Combining the observation and producer wells into one well results in cost savings and enhanced reservoir production and surveillance programs. In addition, the capability to access the lateral allows for intervention in both the motherbore and lateral at any time.
Well intervention operations for a well completed with this multilateral technology involve slickline runs to gain access to the horizontal lateral, retrieve an isolation sleeve, and install a tubing exit whipstock (TEW) for lateral re-entry. Later, coiled tubing (CT) or wireline tractor can be run through the window into the lateral to perform the logging and intervention necessary. Upon completion, the TEW is retrieved from the window, the isolation sleeve is reinstalled, and the well is returned to production. Well intervention through such multilateral completion demonstrates the ease and efficiency of accessing both the vertical and horizontal lateral, without requiring a rig or completion retrieval.
This paper will highlight the multilateral completion technology for accessing both laterals, which includes real-time monitoring capabilities that provide more reliable data for optimum well and field performance.
Title: Multilateral Completion Technology to Improve Reservoir Management
Description:
Abstract
Effective well completion design is crucial to optimize well and field performance, with many operators utilizing different techniques to achieve this important objective.
However, the conventional means of designating wells for reservoir monitoring and standalone wells for production presents challenges to cost-effective reservoir management.
Vertical observation wells are usually drilled in different locations to monitor the reservoir and assist with planning and intervention decisions by running periodic logs to obtain subsurface information.
However, these wells can be costly and occupy valuable space that could be utilized for production.
An alternate technique is to drill a pilot hole, perform all the necessary logging, and obtain the required reservoir information.
The pilot hole is then plugged and sidetracked to a producer well.
Nevertheless, the collected data only remains valid for a limited period due to potential changes to the reservoir.
The demand for cost-effective, optimized drilling of production and observation wells has led to a paradigm shift in multilateral well technology that achieves both production and monitoring objectives for both laterals at the same time.
Using this enhanced technology, wells can be completed with a pilot hole (vertical) drilled for reservoir evaluation throughout the life of the well, with permanent downhole gauges (PDHGs) installed for pressure and temperature monitoring, while the horizontal lateral functions as an oil and gas producer.
Combining the observation and producer wells into one well results in cost savings and enhanced reservoir production and surveillance programs.
In addition, the capability to access the lateral allows for intervention in both the motherbore and lateral at any time.
Well intervention operations for a well completed with this multilateral technology involve slickline runs to gain access to the horizontal lateral, retrieve an isolation sleeve, and install a tubing exit whipstock (TEW) for lateral re-entry.
Later, coiled tubing (CT) or wireline tractor can be run through the window into the lateral to perform the logging and intervention necessary.
Upon completion, the TEW is retrieved from the window, the isolation sleeve is reinstalled, and the well is returned to production.
Well intervention through such multilateral completion demonstrates the ease and efficiency of accessing both the vertical and horizontal lateral, without requiring a rig or completion retrieval.
This paper will highlight the multilateral completion technology for accessing both laterals, which includes real-time monitoring capabilities that provide more reliable data for optimum well and field performance.
Related Results
Development, Testing, and Field Case Histories of Multilateral Well Completion Systems
Development, Testing, and Field Case Histories of Multilateral Well Completion Systems
Abstract
Many enhancements have recently been made to multilateral completion systems, not only as a result of advances in technology but also because of changes ...
Feed-Through Intervention Window Adds Versatility on Intelligent Completion Multilateral Wells
Feed-Through Intervention Window Adds Versatility on Intelligent Completion Multilateral Wells
Abstract
For three decades multilateral well construction has been widely adopted in the North Sea and the Middle East as a beneficial method of field development. F...
Multilateral Technology Innovations Ready to Maximize Field Development
Multilateral Technology Innovations Ready to Maximize Field Development
Abstract
For a quarter of a century sustained technological advances in multilateral technology have enhanced economics and extended the production life of fields in...
Screening Variables for Multilateral Technology
Screening Variables for Multilateral Technology
Abstract
The multilateral well was one of the leading technologies of 1999, and it will continue to be one of the leading technologies for the next 5-10 years. It...
Economical Multilateral Well Technology for Canadian Heavy Oil
Economical Multilateral Well Technology for Canadian Heavy Oil
Abstract
In the last two years there has been a dramatic increase in the pace of the evolution of multilateral systems. Many systems with new features and improve...
Drilling and Completing Multilateral Horizontal Wells in the Middle East
Drilling and Completing Multilateral Horizontal Wells in the Middle East
Abstract
Multilateral completions provide unique systems that mechanically connect horizontal laterals to parent wellbores and allow selective or commingled produ...
Case Histories: Drilling and Completing Multilateral Horizontal Wells in the Middle East
Case Histories: Drilling and Completing Multilateral Horizontal Wells in the Middle East
Abstract
The changing economics of oilfield development has resulted in operators, and therefore, service companies, being challenged to produce greater quantitie...
Multilateral Techniques Enhance Feasibility for Deepwater Applications with Limited Reserves
Multilateral Techniques Enhance Feasibility for Deepwater Applications with Limited Reserves
Abstract
In deepwater development, operators must address unique reservoir management conditions that traditionally increase surface facility, completion, and wel...