The Khuff gas reservoir in Bahrain was discovered in 1948 when a shallow crestal Well No.52 was deepened to a depth of 10,078'. The reservoir was not developed until late 60's when the country planned to embark on an industrialization. scheme that would rely on Khuff gas as the main source of energy. Two commercial development Wells 254 and 255, were drilled in 1969 to meet the demand for a newly constructed alumimum smelter. Nine more wells were drilled during the 70's as the relatively lean Khuff gas replaced the richer Arab Zone gas for injection and artificial lift in the oil field, for municipal power generation and for use as feed stock and fuel in the local refinery. With the continued industrial expansion in Bahrain the need for Khuff gas was greatly increased and as a result a 10-well development drilling program was undertaken in 1982.
Khuff gas consumption has increased 50 MMSCFD in 1969 to around 400 MMSCFD in 1984 at an annual growth rate of 15%. Excessive growth will not only create the need for huge investments but will also rapidly deplete this vital resource. Future demand should be forecasted and controlled at this early stage of depletion to properly manage the reserovoir and, if necessary, to seek an alternative source of supply.
The objective of this paper is to outline a development/production strategy for the Khuff Reservoir based on deliverabilities and estimated reserves.
Title: Development of the Khuff Gas Reservoir, Bahrain Field
Description:
Abstract
The Khuff gas reservoir in Bahrain was discovered in 1948 when a shallow crestal Well No.
52 was deepened to a depth of 10,078'.
The reservoir was not developed until late 60's when the country planned to embark on an industrialization.
scheme that would rely on Khuff gas as the main source of energy.
Two commercial development Wells 254 and 255, were drilled in 1969 to meet the demand for a newly constructed alumimum smelter.
Nine more wells were drilled during the 70's as the relatively lean Khuff gas replaced the richer Arab Zone gas for injection and artificial lift in the oil field, for municipal power generation and for use as feed stock and fuel in the local refinery.
With the continued industrial expansion in Bahrain the need for Khuff gas was greatly increased and as a result a 10-well development drilling program was undertaken in 1982.
Khuff gas consumption has increased 50 MMSCFD in 1969 to around 400 MMSCFD in 1984 at an annual growth rate of 15%.
Excessive growth will not only create the need for huge investments but will also rapidly deplete this vital resource.
Future demand should be forecasted and controlled at this early stage of depletion to properly manage the reserovoir and, if necessary, to seek an alternative source of supply.
The objective of this paper is to outline a development/production strategy for the Khuff Reservoir based on deliverabilities and estimated reserves.
Related Results
Prediction of High Pressure Formation Salt Water Flow in Deep Drilling in Abu Dhabi Area
Prediction of High Pressure Formation Salt Water Flow in Deep Drilling in Abu Dhabi Area
ABSTRACT
Deep drilling of Permo-Triassic / Palaeozoic section in Abu Dhabi area is, generally, costly and risky: Many unforeseen problems were encountered while d...
Commingled Production Experiences of Multilayered Gas-Carbonate Reservoir in Saudi Arabia
Commingled Production Experiences of Multilayered Gas-Carbonate Reservoir in Saudi Arabia
Abstract
Saudi Aramco employed extensive matrix and acid fracturing treatments in the development of Saudi Arabian nonassociated gas carbonate reservoirs. The tar...
Mapping In-Situ H2S in Carbonate Khuff Reservoirs in Central Oman
Mapping In-Situ H2S in Carbonate Khuff Reservoirs in Central Oman
Abstract
H2S is a colorless toxic gas, although harmless in minute quantities, it can pose HSE critical hazards to personnel and facilities if risks are not identifi...
Reservoir Optimization and Monitoring: Mauddud Reservoir - Bahrain Field
Reservoir Optimization and Monitoring: Mauddud Reservoir - Bahrain Field
Abstract
For a matured oil field like Bahrain Field with a long production history, it is required to identify underperforming areas, infill wells and upgrade the...
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Abstract
Reservoir fluid estimation for exploration prospects can be random and of large uncertainties. Typically, the reservoir fluid estimation in a prospect can b...
Selecting Perforation Intervals and Stimulation Technique in the Khuff Reservoir for Improved and Economic Gas Recovery
Selecting Perforation Intervals and Stimulation Technique in the Khuff Reservoir for Improved and Economic Gas Recovery
Abstract
Saudi ARAMCO has initiated an acid fracturing program to treat the carbonates of the Khuff reservoir in the Ghawar field in the eastern province of Saudi Ar...
Khuff Gas Condensate Development
Khuff Gas Condensate Development
Summary
This paper addresses some key reservoir and production issues related to gas and condensate recovery from Khuff reservoirs in the Middle East – namely Gha...
Hydrocarbon Habitat of the Early Permian Unayzah Formation in Abu Dhabi
Hydrocarbon Habitat of the Early Permian Unayzah Formation in Abu Dhabi
Abstract
The pre-Khuff principal hydrocarbon reservoir, Unayzah Formation, consists mainly of distal braid plain sandstones characterized by aeolian and sabkha facie...