Sermo Dam is located in the Special Region of Yogyakarta and serves multiple purposes including providing drinking water, supplementing irrigation systems in the Kalibawang area, and flood control. According to data published by the World Commission, 60% of mitigation measures taken to overcome the impact of dam structure failures are unsuccessful. The simulation of dam failure serves as a crucial aspect of flood mitigation plans and strategies because it is more destructive than natural flood waves. This research used HEC-RAS 5.0.7 to examine the flood inundation mapping and simulate dam failure in two dimensions. However, Dam Break Analysis was adopted to provide a Dam Emergency Action Plan Guide to guide managers and the community. The overtopping scenario was adapted to model the failure of the Sermo Dam based on the frequent occurrence of heavy and extreme precipitation in the affected area. Data were analyzed using unsteady flow and PMF discharge with peak inflow discharge of 1276.6 m³/s, which result in an inundation area of 9394 hectares and a maximum flood height of 17 m. Dam failure-induced floods tend to potentially affect eight sub-districts including Kokap, Pengasih, Sentolo, Wates, Panjatan, Galur, Lendah, and Temon. The piping scenario is also considered based on the potential damage that tends to occur. In the piping scenario, the biggest flooding area was 5112 hectares with a maximum flood height of 13 m. About six sub-districts are potentially affected by dam failure-induced floods with Kokap and Sentolo being excluded from the list. Therefore, it is crucial to establish early warning systems and infrastructure to mitigate disaster risks. The results of this research can also inform evacuation planning, damage estimation, and post-flood rehabilitation efforts in the affected areas.
Universitas Gadjah Mada
Title: Dam Break Analysis of Sermo Dam
Description:
Sermo Dam is located in the Special Region of Yogyakarta and serves multiple purposes including providing drinking water, supplementing irrigation systems in the Kalibawang area, and flood control.
According to data published by the World Commission, 60% of mitigation measures taken to overcome the impact of dam structure failures are unsuccessful.
The simulation of dam failure serves as a crucial aspect of flood mitigation plans and strategies because it is more destructive than natural flood waves.
This research used HEC-RAS 5.
7 to examine the flood inundation mapping and simulate dam failure in two dimensions.
However, Dam Break Analysis was adopted to provide a Dam Emergency Action Plan Guide to guide managers and the community.
The overtopping scenario was adapted to model the failure of the Sermo Dam based on the frequent occurrence of heavy and extreme precipitation in the affected area.
Data were analyzed using unsteady flow and PMF discharge with peak inflow discharge of 1276.
6 m³/s, which result in an inundation area of 9394 hectares and a maximum flood height of 17 m.
Dam failure-induced floods tend to potentially affect eight sub-districts including Kokap, Pengasih, Sentolo, Wates, Panjatan, Galur, Lendah, and Temon.
The piping scenario is also considered based on the potential damage that tends to occur.
In the piping scenario, the biggest flooding area was 5112 hectares with a maximum flood height of 13 m.
About six sub-districts are potentially affected by dam failure-induced floods with Kokap and Sentolo being excluded from the list.
Therefore, it is crucial to establish early warning systems and infrastructure to mitigate disaster risks.
The results of this research can also inform evacuation planning, damage estimation, and post-flood rehabilitation efforts in the affected areas.
Related Results
Application of AHP in flood combination calculation of check dam system
Application of AHP in flood combination calculation of check dam system
Check dam is an important water and soil conservation measure for comprehensive treatment of small watershed in the Loess Plateau. The reinforcement of sick and dangerous check dam...
Modal Analysis of Chushandian Gravity Dam
Modal Analysis of Chushandian Gravity Dam
This article uses the finite element software ABAQUS to establish a three-dimensional finite element model based on the overflow dam section 12 # ~15 # and surface outlet dam secti...
Study on Deformation Characteristics of Gate Dam and Earth-Rock Dam System on Deep Overburden
Study on Deformation Characteristics of Gate Dam and Earth-Rock Dam System on Deep Overburden
The gate dam and earth-rock dam system offers advantages such as minimal ecological impact and strong terrain adaptability, making them the preferred dam type for low-head, high-fl...
Study on Deformation Characteristics of Gate Dam and Earth–Rock Dam Systems with Deep Overburden
Study on Deformation Characteristics of Gate Dam and Earth–Rock Dam Systems with Deep Overburden
Gate dam and earth–rock dam systems have many advantages, such as minimal ecological impact and good terrain adaptability, making them the preferred dam type for low-head, high-flo...
ANALISIS KONDISI TERAS REAKTOR DAYA MAJU AP1000 PADA KECELAKAAN SMALL BREAK LOCA
ANALISIS KONDISI TERAS REAKTOR DAYA MAJU AP1000 PADA KECELAKAAN SMALL BREAK LOCA
ABSTRAK ANALISIS KONDISI TERAS REAKTOR DAYA MAJU AP1000 PADA KECELAKAAN SMALL BREAK LOCA. Kecelakaan yang diakibatkan oleh kehilangan pendingin (loss of coolant accident / LOCA) da...
Safety and environmental impact control of cross passage construction in soft soil strata using tunnel boring machine method
Safety and environmental impact control of cross passage construction in soft soil strata using tunnel boring machine method
Abstract
The Tianjin area is covered by soft, water-bearing silt and silty sand strata and has a high groundwater table. The excavation of a cross passage in this area enta...
ANALISIS KINERJA BENDUNGAN JATIGEDE KABUPATEN SUMEDANG JAWA BARAT
ANALISIS KINERJA BENDUNGAN JATIGEDE KABUPATEN SUMEDANG JAWA BARAT
Jatigede dam is a dam located in Jatigede District, Sumedang Regency, West Java. This dam was built to stem the flow of the Cimanuk River and form the Jatigede Reservoir. To minimi...
Analysis of Fill Dam Using Finite Element Method and Comparison with Monitoring Results
Analysis of Fill Dam Using Finite Element Method and Comparison with Monitoring Results
Nowadays, a detailed safety policy is applied for dams. These policies cover structural safety, monitoring, inspection, safe operation, and emergency plans. For high-risk dams, all...