Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Rig Less Solution for Permanent Isolation of Unwanted Water Production Zone in an Oil Well to Sustain the Oil Production and Reduce the Water Production and Treatment Cost

View through CrossRef
Abstract This paper describes the systematic approach towards nullifying the water production from the oilwell by setting an inflatable and pumping water shut off solution beneath. An onshore oil producing well in the United Arab Emirates was producing high water-cut impacting overall oil production and increasing water production and treatment requirements. The objective of the well is to improve oil production and reduce water production. Well data was reviewed systematically including completion limitations, deviation survey, sour conditions along with recently carried out production logging information. The production logs identified that the lowermost zone is producing most of the water and needed to be shut off. The solution was designed with an inflatable retainer system having 2.125″ outer diameter and customized water shut off solution. The pressure differential capacity of this inflatable packer was evaluated using a software simulation and chemical water shut-off solution was designed within the limitation inflatable packer minimum differential capability. Proper lab testing of the Chemicals was carried out to finalize the setting time. The volume of chemical was finalized based on geological features and shut-off intervals. In summary a Coil tubing Conveyed solution was finalized after screening other possible bull head options. The solution was implemented at the candidate well after overcoming the operational challenges, completion restrictions and resources limitations. The paper highlights the candidate evaluation, solution screening, lab testing, execution challenges and successful results. In summary the solution reduced more than 700 BWPD of water production that resulted in saving treatment cost, water handling capability limitation and power optimization in producing the well using ESP system. This rig less solution provided an economic alternative for avoiding unwanted water while enhancing oil production capacities that resulted in increasing well life and profitability. This new approach of setting an inflatable cement retainer and pump the water shut off solution in rig less environment at wells having tubing restrictions provides an alternative solution that avoids the requirement of workover rigs and minimum timeframe to put back well on production.
Title: Rig Less Solution for Permanent Isolation of Unwanted Water Production Zone in an Oil Well to Sustain the Oil Production and Reduce the Water Production and Treatment Cost
Description:
Abstract This paper describes the systematic approach towards nullifying the water production from the oilwell by setting an inflatable and pumping water shut off solution beneath.
An onshore oil producing well in the United Arab Emirates was producing high water-cut impacting overall oil production and increasing water production and treatment requirements.
The objective of the well is to improve oil production and reduce water production.
Well data was reviewed systematically including completion limitations, deviation survey, sour conditions along with recently carried out production logging information.
The production logs identified that the lowermost zone is producing most of the water and needed to be shut off.
The solution was designed with an inflatable retainer system having 2.
125″ outer diameter and customized water shut off solution.
The pressure differential capacity of this inflatable packer was evaluated using a software simulation and chemical water shut-off solution was designed within the limitation inflatable packer minimum differential capability.
Proper lab testing of the Chemicals was carried out to finalize the setting time.
The volume of chemical was finalized based on geological features and shut-off intervals.
In summary a Coil tubing Conveyed solution was finalized after screening other possible bull head options.
The solution was implemented at the candidate well after overcoming the operational challenges, completion restrictions and resources limitations.
The paper highlights the candidate evaluation, solution screening, lab testing, execution challenges and successful results.
In summary the solution reduced more than 700 BWPD of water production that resulted in saving treatment cost, water handling capability limitation and power optimization in producing the well using ESP system.
This rig less solution provided an economic alternative for avoiding unwanted water while enhancing oil production capacities that resulted in increasing well life and profitability.
This new approach of setting an inflatable cement retainer and pump the water shut off solution in rig less environment at wells having tubing restrictions provides an alternative solution that avoids the requirement of workover rigs and minimum timeframe to put back well on production.

Related Results

Project To Upright The Alexander L. Kielland
Project To Upright The Alexander L. Kielland
Abstract The Alexander L Kielland is a drilling rig of Pentagone type. It was being used as an accommodation unit when it capsized in the North Sea in 1980 as a r...
Triumph Over Adversity: The Epic Journey Of Rig Bahari-1
Triumph Over Adversity: The Epic Journey Of Rig Bahari-1
Abstract The loading of Rig Bahari-1 onto the heavy lifter was a remarkable journey that show cased the commitment and teamwork of the staff Fig (1). The scope inclu...
Procedure for Western blot v1
Procedure for Western blot v1
Goal: This document has the objective of standardizing the protocol for Western blot. This technique allows the detection of specific proteins separated on polyacrylamide gel and t...
Development of Automatic Recognition and Recording System for Rig Jobs
Development of Automatic Recognition and Recording System for Rig Jobs
Abstract Keeping a record of drilling process automatically in real time is a requisite for KPI studies and getting support from ROCs experts. There are five categor...
Using a Land Rig in an Offshore Location: Some Lessons from a Niger-Delta Experience
Using a Land Rig in an Offshore Location: Some Lessons from a Niger-Delta Experience
Abstract In line with national aspiration to increase hydrocarbon reserves and production rate, the last 18 years have witnessed the award of licenses for the develo...
Use of the Engineering Simulator for Drilling for Evaluating and Designing Drilling Rigs
Use of the Engineering Simulator for Drilling for Evaluating and Designing Drilling Rigs
ABSTRACT Drilling personnel typically base the selection of a Drilling Contractor and rig on their subjective evaluation of how well various rig components will meet...
Everyday Life in the "Tourist Zone"
Everyday Life in the "Tourist Zone"
This article makes a case for the everyday while on tour and argues that the ability to continue with everyday routines and social relationships, while at the same time moving thro...

Back to Top