Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria

View through CrossRef
The construction industry has generally been tagged with poor project performance. Cost and time overruns are the leading causes of  poor performance. Design and construction errors are equally leading causes of cost and time overruns. The objectives of this study are  to investigate the prevalent types of errors in construction documents, the cost implication of the errors, the time implication of the  errors, and strategies adopted to mitigate the errors. The study involves an interview of construction professionals on 51 selected  building projects across the southwestern States of Nigeria through the non-probabilistic convenience sampling technique. The findings  of the study indicated that the Nigerian construction industry is largely dominated by the use of traditional procurement method and  many construction projects lack complete construction documents. Also, errors in construction documents added about 9% to the  contract sum and 31% to cost overrun. It also added about 21% to the agreed duration and 40% to the total time overrun. The study  concluded that errors in construction documents affect project duration more than the project cost and can triple the agreed duration of  building projects in some cases. The study recommended that based on the projects investigated, an additional 10% should be added to  the agreed cost and 20% to the scheduled duration of building projects.
Title: Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria
Description:
The construction industry has generally been tagged with poor project performance.
Cost and time overruns are the leading causes of  poor performance.
Design and construction errors are equally leading causes of cost and time overruns.
The objectives of this study are  to investigate the prevalent types of errors in construction documents, the cost implication of the errors, the time implication of the  errors, and strategies adopted to mitigate the errors.
The study involves an interview of construction professionals on 51 selected  building projects across the southwestern States of Nigeria through the non-probabilistic convenience sampling technique.
The findings  of the study indicated that the Nigerian construction industry is largely dominated by the use of traditional procurement method and  many construction projects lack complete construction documents.
Also, errors in construction documents added about 9% to the  contract sum and 31% to cost overrun.
It also added about 21% to the agreed duration and 40% to the total time overrun.
The study  concluded that errors in construction documents affect project duration more than the project cost and can triple the agreed duration of  building projects in some cases.
The study recommended that based on the projects investigated, an additional 10% should be added to  the agreed cost and 20% to the scheduled duration of building projects.

Related Results

NICU Medication Errors: Describing the Cause and Nature of Medication Errors in a NICU in Qatar
NICU Medication Errors: Describing the Cause and Nature of Medication Errors in a NICU in Qatar
IntroductionA medication error can be defined as “any error occurring in the medication use process” and focuses on problems with the delivery of medication to a patient [1]. Medic...
Architecture and adaptation
Architecture and adaptation
«The architectural work transcends the architect, goes beyond the moment in which its construction takes place, and therefore can be contemplated under the changing lights of histo...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Time and Architecture
Time and Architecture
In the Italian language, the term “tempo” (literally time) is a word of daily use to which we attribute many meanings. It can signify a chronological dimension between past, prese...
Analysis of Cost and Time Overruns for Major Public Building Construction Projects in Dire Dawa City, Ethiopia
Analysis of Cost and Time Overruns for Major Public Building Construction Projects in Dire Dawa City, Ethiopia
Cost and time overruns are the critical challenges for construction projects. The consequences can extend beyond just monetary losses, causing project delays and even project cance...
The integration of BIM in the application of green building materials in construction projects
The integration of BIM in the application of green building materials in construction projects
In recent years, with the growing call for sustainable development, green building materials, which are of great meaning for reducing resource and environmental impacts, have attra...
Performative Microforests
Performative Microforests
The design of office buildings can substantially improve the building, social, and ecological performance of office building projects. However, existing research on improving the p...

Back to Top