Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria
View through CrossRef
The construction industry has generally been tagged with poor project performance. Cost and time overruns are the leading causes of poor performance. Design and construction errors are equally leading causes of cost and time overruns. The objectives of this study are to investigate the prevalent types of errors in construction documents, the cost implication of the errors, the time implication of the errors, and strategies adopted to mitigate the errors. The study involves an interview of construction professionals on 51 selected building projects across the southwestern States of Nigeria through the non-probabilistic convenience sampling technique. The findings of the study indicated that the Nigerian construction industry is largely dominated by the use of traditional procurement method and many construction projects lack complete construction documents. Also, errors in construction documents added about 9% to the contract sum and 31% to cost overrun. It also added about 21% to the agreed duration and 40% to the total time overrun. The study concluded that errors in construction documents affect project duration more than the project cost and can triple the agreed duration of building projects in some cases. The study recommended that based on the projects investigated, an additional 10% should be added to the agreed cost and 20% to the scheduled duration of building projects.
African Journals Online (AJOL)
Title: Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria
Description:
The construction industry has generally been tagged with poor project performance.
Cost and time overruns are the leading causes of poor performance.
Design and construction errors are equally leading causes of cost and time overruns.
The objectives of this study are to investigate the prevalent types of errors in construction documents, the cost implication of the errors, the time implication of the errors, and strategies adopted to mitigate the errors.
The study involves an interview of construction professionals on 51 selected building projects across the southwestern States of Nigeria through the non-probabilistic convenience sampling technique.
The findings of the study indicated that the Nigerian construction industry is largely dominated by the use of traditional procurement method and many construction projects lack complete construction documents.
Also, errors in construction documents added about 9% to the contract sum and 31% to cost overrun.
It also added about 21% to the agreed duration and 40% to the total time overrun.
The study concluded that errors in construction documents affect project duration more than the project cost and can triple the agreed duration of building projects in some cases.
The study recommended that based on the projects investigated, an additional 10% should be added to the agreed cost and 20% to the scheduled duration of building projects.
Related Results
NICU Medication Errors: Describing the Cause and Nature of Medication Errors in a NICU in Qatar
NICU Medication Errors: Describing the Cause and Nature of Medication Errors in a NICU in Qatar
IntroductionA medication error can be defined as “any error occurring in the medication use process” and focuses on problems with the delivery of medication to a patient [1]. Medic...
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
BACKGROUND
Access to potable drinking water and sufficient sanitation continues to be an urgent global concern, particularly in developing regions where con...
Architecture and adaptation
Architecture and adaptation
«The architectural work transcends the architect, goes beyond the moment in which its construction takes place, and therefore can be contemplated under the changing lights of histo...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Physical database design in document stores
Physical database design in document stores
NoSQL is an umbrella term used to classify alternate storage systems to the traditional Relational Database Management Systems (RDBMSs). Among these, Document stores have gained po...
Time and Architecture
Time and Architecture
In the Italian language, the term “tempo” (literally time) is a word of daily use to which we attribute many meanings.
It can signify a chronological dimension between past, prese...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Development of building information classifier elements to create and maintain information models of capital construction objects in terms of design processes, construction process management and construction information
Development of building information classifier elements to create and maintain information models of capital construction objects in terms of design processes, construction process management and construction information
Introduction. Integral approach to the application of construction information in the creation and maintenance of information models of capital construction objects is key in the c...