Abstract This paper presents the performance of Electrical Submersible Pumps (ESPs) in the Wafra field within the Divided Zone Kuwait-Saudi Arabia and covers the period of 4 years started in 1998 - December 2001. Included are the historical failures of ESPs, analysis of failures and some solutions that have helped to reduce the number of failures and that in-turn increased ESP run lives/reduced deferred oil production/saved rig cost/time. Main reservoirs in the DZ area producing with ESPs include Wara/Burgan sands and Ratawi carbonates. Some ESPs are also operating in heavy oil carbonate Eocene wells, Ratawi limestone in south Fuwaris and Marrat carbonate in Humma field. As these reservoirs are of different lithologies, depths and flow rates vary from 1,000 to 9,000 bfpd, thus all series/types of ESPs have been run. Tables and plots demonstrate/analyze total number of ESP failures by each reservoir / equipment / components types, mean time to failure (Average Run Life), ESP listings. In summary, it is shown that ‘Mean time to failures’ (Average Run Life) significantly increased from 157 to 370 days within this 4 year period. ESP completions in Wara sands presented the biggest challenge to reduce ESP failures due to high sand volume erosion. New material design for ESP defined as ARM-COMP "Abrasion Resistance Material- Compression" was utilized successfully. In other reservoirs, new designs of ‘Slim Hole’ ESPs, ‘Shrouded Motors’, ‘Pump Optimizations’, ‘Stimulation jobs to increase intake pressure’ have been used to overcome frequent burnt motor, pump plugging etc., problems. Also, ESP XGC Gas Handler for high GOR wells was successful. Introduction Divided Zone Group (DZG) pursue exploration and optimum development of hydrocarbon resources of the Divided Zone (On-Shore) through Joint Operations (JO). The Divided Zone field is producing using artificial methods (Sucker rod pump & Electrical submersible pump). The focus of this paper is on the performances of electrical submersible pumps in period of 4 years started in 1998 until Dec.2001. Main producing reservoirs in the DZ area include Wara/Burgan sands and Ratawi carbonates. Some ESPs are also operating in heavy oil carbonate Eocene wells, Ratawi limestone in south Fuwaris and Marrat carbonate in Humma field. As these reservoirs are of different lithologies, depths and flow rates vary from 1,000 to 9,000 bfpd, thus all series/types of ESPs have been run. The total number of ESPs installed at the end of year 2001 in DZ was 251 and the common reasons of ESP failures and approximate percentages are:Motor Failures (40%)Pump Failures (22%)Cable Failure (26%)Others (12%) The following case studies for wells in Ratawi and Wara Reservoirs will be presented. These wells had ESP failures either due to high GOR or excessive sand production.Slim hole pump - Ratawi Reservoir - Case1.Shroud Motor & XGC gas handler- Ratawi Reservoir - Cases 2 & 3.Abrassion Resistance Material (Floater&Compression)-Wara Sand Reservoir Case 4 & 5.
Title: ESP Failures / Analysis / Solutions in Divided Zone - Case Study
Description:
Abstract This paper presents the performance of Electrical Submersible Pumps (ESPs) in the Wafra field within the Divided Zone Kuwait-Saudi Arabia and covers the period of 4 years started in 1998 - December 2001.
Included are the historical failures of ESPs, analysis of failures and some solutions that have helped to reduce the number of failures and that in-turn increased ESP run lives/reduced deferred oil production/saved rig cost/time.
Main reservoirs in the DZ area producing with ESPs include Wara/Burgan sands and Ratawi carbonates.
Some ESPs are also operating in heavy oil carbonate Eocene wells, Ratawi limestone in south Fuwaris and Marrat carbonate in Humma field.
As these reservoirs are of different lithologies, depths and flow rates vary from 1,000 to 9,000 bfpd, thus all series/types of ESPs have been run.
Tables and plots demonstrate/analyze total number of ESP failures by each reservoir / equipment / components types, mean time to failure (Average Run Life), ESP listings.
In summary, it is shown that ‘Mean time to failures’ (Average Run Life) significantly increased from 157 to 370 days within this 4 year period.
ESP completions in Wara sands presented the biggest challenge to reduce ESP failures due to high sand volume erosion.
New material design for ESP defined as ARM-COMP "Abrasion Resistance Material- Compression" was utilized successfully.
In other reservoirs, new designs of ‘Slim Hole’ ESPs, ‘Shrouded Motors’, ‘Pump Optimizations’, ‘Stimulation jobs to increase intake pressure’ have been used to overcome frequent burnt motor, pump plugging etc.
, problems.
Also, ESP XGC Gas Handler for high GOR wells was successful.
Introduction Divided Zone Group (DZG) pursue exploration and optimum development of hydrocarbon resources of the Divided Zone (On-Shore) through Joint Operations (JO).
The Divided Zone field is producing using artificial methods (Sucker rod pump & Electrical submersible pump).
The focus of this paper is on the performances of electrical submersible pumps in period of 4 years started in 1998 until Dec.
2001.
Main producing reservoirs in the DZ area include Wara/Burgan sands and Ratawi carbonates.
Some ESPs are also operating in heavy oil carbonate Eocene wells, Ratawi limestone in south Fuwaris and Marrat carbonate in Humma field.
As these reservoirs are of different lithologies, depths and flow rates vary from 1,000 to 9,000 bfpd, thus all series/types of ESPs have been run.
The total number of ESPs installed at the end of year 2001 in DZ was 251 and the common reasons of ESP failures and approximate percentages are:Motor Failures (40%)Pump Failures (22%)Cable Failure (26%)Others (12%) The following case studies for wells in Ratawi and Wara Reservoirs will be presented.
These wells had ESP failures either due to high GOR or excessive sand production.
Slim hole pump - Ratawi Reservoir - Case1.
Shroud Motor & XGC gas handler- Ratawi Reservoir - Cases 2 & 3.
Abrassion Resistance Material (Floater&Compression)-Wara Sand Reservoir Case 4 & 5.

Related Results

Harsh Environment ESP System
Harsh Environment ESP System
Objective/Scope When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than t...
High Rate Slim ESP Viability Assessment in the Field
High Rate Slim ESP Viability Assessment in the Field
Abstract Producing oil at full potential with an electrical submersible pump (ESP) in a slim well remains a challenge in the petroleum industry. A conventional slim ...
Improving ESP LifeTime Performance Evaluation by Deploying an ESP Tracking and Inventory Management System
Improving ESP LifeTime Performance Evaluation by Deploying an ESP Tracking and Inventory Management System
Abstract One of the most popular and efficient artificial lift mechanisms is the electrical submersible pump (ESP). According to recent statistics, there are more th...
Electric Submersible Pump Reliability Improvement Lean Six Sigma (LSS) Study
Electric Submersible Pump Reliability Improvement Lean Six Sigma (LSS) Study
Abstract Electric Submersible Pumping (ESP) is a common artificial lift method when technically viable for high flow rate application. ESP reliability, on the other ...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Real-Time ESP Management Framework Using Hybrid Physics-Based and ML Models
Real-Time ESP Management Framework Using Hybrid Physics-Based and ML Models
Abstract Water injection is a crucial field development strategy to meet targeted production requirements and improve the oil recovery from carbonate reservoirs in t...
ESP Pod System With Down-hole Mechanical Isolation Enhances Pump Run-Life in Harsh Wellbore Conditions-A Case Study
ESP Pod System With Down-hole Mechanical Isolation Enhances Pump Run-Life in Harsh Wellbore Conditions-A Case Study
Abstract Harsh wellbore environments reduce the run-life of an Electrical Submersible Pump (ESP), adversely affect casing integrity and require expensive ESP replace...
ESP Energy Efficiency Analysis on Western Siberia Fields
ESP Energy Efficiency Analysis on Western Siberia Fields
Abstract The paper is devoted to the estimation of energy efficiency of wells equipped with ESP at different operating conditions in Western Siberia. As a measure of...