A New Hybrid MCDM Model with Grey Numbers for the Construction Delay Change Response Problem
View through CrossRef
Stakeholders carry out construction projects under fast-changing conditions. The conditions can undermine the concept of a stable and prosperous construction plan without an appropriate permit and an active and targeted plan for environmental management. Therefore, the decision maker often faces many challenges of Multi-Criteria Decision-Making (MCDM) when it comes to solving the construction management proper response selection problem for planning delay changes when sustainable environment requirements are essential. Any addition, reduction, or modification of the original project plan is a change to the project and impacts the environment. Change occurrence is a probable issue while projects are implemented. One of the most complex tasks for the project manager is to work correctly and to find the most suitable decisions for the not precisely predetermined future expectations of a change. Therefore, the relevant criteria of values must reflect the uncertain properties of the problem model. Similar problems require fuzzy or grey MCDM methods. The paper introduces a new MCDM approach, which combines four different MCDM methods with grey numbers: the SWARA, TOPSIS-GM, Additive Ratio ASsessment with Grey Numbers (ARAS-G) techniques and Geometric Mean to cover uncertainty and improve the problem-solving model. An analysis of a case study has examined and highlighted four possible alternatives described by eight performance criteria (cost, duration, and some linguistic criteria). Stakeholders determined the best alternative, calculated the efficiency of choice, and practically implemented the best option.
Title: A New Hybrid MCDM Model with Grey Numbers for the Construction Delay Change Response Problem
Description:
Stakeholders carry out construction projects under fast-changing conditions.
The conditions can undermine the concept of a stable and prosperous construction plan without an appropriate permit and an active and targeted plan for environmental management.
Therefore, the decision maker often faces many challenges of Multi-Criteria Decision-Making (MCDM) when it comes to solving the construction management proper response selection problem for planning delay changes when sustainable environment requirements are essential.
Any addition, reduction, or modification of the original project plan is a change to the project and impacts the environment.
Change occurrence is a probable issue while projects are implemented.
One of the most complex tasks for the project manager is to work correctly and to find the most suitable decisions for the not precisely predetermined future expectations of a change.
Therefore, the relevant criteria of values must reflect the uncertain properties of the problem model.
Similar problems require fuzzy or grey MCDM methods.
The paper introduces a new MCDM approach, which combines four different MCDM methods with grey numbers: the SWARA, TOPSIS-GM, Additive Ratio ASsessment with Grey Numbers (ARAS-G) techniques and Geometric Mean to cover uncertainty and improve the problem-solving model.
An analysis of a case study has examined and highlighted four possible alternatives described by eight performance criteria (cost, duration, and some linguistic criteria).
Stakeholders determined the best alternative, calculated the efficiency of choice, and practically implemented the best option.
Related Results
Everyday Life in the "Tourist Zone"
Everyday Life in the "Tourist Zone"
This article makes a case for the everyday while on tour and argues that the ability to continue with everyday routines and social relationships, while at the same time moving thro...
General grey numbers and their operations
General grey numbers and their operations
PurposeThe purpose of this paper is to advance new rules about operations of grey numbers.Design/methodology/approachThe paper first puts forward the definitions of basic element o...
Grey relations
Grey relations
PurposeThe goal of this article is to introduce the notion of a grey relation between grey sets using grey numbers.Design/methodology/approachThis study uses the grey number to cre...
General grey number decision-making model and its application based on intuitionistic grey number set
General grey number decision-making model and its application based on intuitionistic grey number set
PurposeThe purpose of this paper is to study the grey decision model and distance measuring method of general grey number.Design/methodology/approachFirst, intuitionistic grey numb...
Explanations about grey information and framework of grey system modeling
Explanations about grey information and framework of grey system modeling
Purpose
The purpose of this paper is to summarize the different types of grey information, explain the mechanism of grey system modeling and reconstruct the framework of grey syste...
Covered solution for a grey linear program based on a general formula for the inverse of a grey matrix
Covered solution for a grey linear program based on a general formula for the inverse of a grey matrix
Purpose
– This paper attempts to establish the general formula for computing the inverse of grey matrix, and the results are applied to solve grey linear programmin...
Grey clustering and grey ranking of bank branches based on grey efficiency
Grey clustering and grey ranking of bank branches based on grey efficiency
PurposeCompetition in the banking sector is more complex than in the past, and survival has become more difficult than before. The purpose of this paper is to propose a grey method...
Study on distance measuring and sorting method of general grey number
Study on distance measuring and sorting method of general grey number
Purpose
The purpose of this paper is to study distance measuring and sorting method of general grey number.
Design/methodology/approach
First, the concept of generalised grey num...