Using the example of the steelmaking production of JSC EVRAZ United West Siberian Metallurgical Plant, the paper considers the task of synchronous calendar planning in the interval of several planned periods of operation of basic oxygen furnace (BOF), BOF shops, production as a whole, as well as ongoing repairs of BOF for steelmaking production (two BOF shops with two and three BOFs). Scheduled stops of the BOF for repair depend on the actual achieved duration of the lining campaign and production schedules of the units and are performed when the current duration of the BOF campaign reaches a given standard value. Thus, the current duration of the BOF campaign is described by a discrete, nonlinear quasi-periodic function that does not have a fixed period, but has some regularity. Technological limitations were forma­lized, determining the minimum and maximum values of the number of melts per day that each of the workshops can produce with one or two BOFs operating simultaneously. The authors formulated the conditions to avoid performing two “cold” repairs in one shop in one planned period and ensuring daily processing by BOF shops of all cast iron coming from the blast furnace shop. In the proposed mathematical formulation of the problem, it is required to find such schedules of BOF repairs and such calendar plans of their work that satisfy the formulated constraints and optimize the non-linear criterion. The proposed criterion is aimed at ensuring the constant readiness of the shops for implementation of the production program and design productivity. The task is formulated for the conditions of trouble-free operation and stable provision of the shops with liquid cast iron as the main component of the metal charge of BOF smelting.
Title: Planning BOF repair system in conditions of quasi-periodic operation of units
Description:
Using the example of the steelmaking production of JSC EVRAZ United West Siberian Metallurgical Plant, the paper considers the task of synchronous calendar planning in the interval of several planned periods of operation of basic oxygen furnace (BOF), BOF shops, production as a whole, as well as ongoing repairs of BOF for steelmaking production (two BOF shops with two and three BOFs).
Scheduled stops of the BOF for repair depend on the actual achieved duration of the lining campaign and production schedules of the units and are performed when the current duration of the BOF campaign reaches a given standard value.
Thus, the current duration of the BOF campaign is described by a discrete, nonlinear quasi-periodic function that does not have a fixed period, but has some regularity.
Technological limitations were forma­lized, determining the minimum and maximum values of the number of melts per day that each of the workshops can produce with one or two BOFs operating simultaneously.
The authors formulated the conditions to avoid performing two “cold” repairs in one shop in one planned period and ensuring daily processing by BOF shops of all cast iron coming from the blast furnace shop.
In the proposed mathematical formulation of the problem, it is required to find such schedules of BOF repairs and such calendar plans of their work that satisfy the formulated constraints and optimize the non-linear criterion.
The proposed criterion is aimed at ensuring the constant readiness of the shops for implementation of the production program and design productivity.
The task is formulated for the conditions of trouble-free operation and stable provision of the shops with liquid cast iron as the main component of the metal charge of BOF smelting.

Related Results

Synchronization transition with coexistence of attractors in coupled discontinuous system
Synchronization transition with coexistence of attractors in coupled discontinuous system
The studies of extended dynamics systems are relevant to the understanding of spatiotemporal patterns observed in diverse fields. One of the well-established models for such comple...
Securing heat source to lower hot metal ratio in basic oxygen steelmaking process
Securing heat source to lower hot metal ratio in basic oxygen steelmaking process
The most important factor affecting the mitigation of CO 2 emissions in the oxygen steelmaking process is the heat source of a basic oxygen furnace (BOF). W...
Bag-of-Frames: Improving Bag-of-Words for a better similarity measure
Bag-of-Frames: Improving Bag-of-Words for a better similarity measure
Abstract This paper introduces the Bag-of-Frames (BoF) model, a novel approach to textual document representation that extends and improves the classical Bag-of-Words (BoW)...
Microwave-assisted selective leaching behavior of calcium from Basic Oxygen Furnace (BOF) slag with ammonium chloride solution
Microwave-assisted selective leaching behavior of calcium from Basic Oxygen Furnace (BOF) slag with ammonium chloride solution
The Basic Oxygen Furnace (BOF) slag can be potentially used in the indirect aqueous CO2 sequestration process due to the fact that it contains large amounts of basic oxides. ...
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
Oral interaction is sometimes not articulated by its participants as perfect as they project. The unsuccessful instances of talk in exchange may cause serious communicative breakdo...
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Here in this paper, we provide characterizations of fuzzy quasi-ideal in terms of level and strong level subsets. Along with it, we provide expression for the generated fuzzy quasi...
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
Background: Several methods for fixing inguinal hernias have been documented. Anterior or posterior approaches,open or laparoscopic procedures, may be used for hernia repair. While...

Back to Top