Rotating Equipment Switchover Dashboard
View through CrossRef
Abstract
CONTENT
This Instruction outlines the procedures for testing spare pumps. The text includes: DefinitionResponsibilitySwitching IntervalsSwitching TimeSwitching ProcedureSwitchover Dashboard
DEFINITION
This procedure outlines switching between "Main Pump" (running pump) and "spare pump" (the one to be tested). All other type of equipment's (rotating and/or stationary) will be switchover based in the following:PM (Preventive Maintenance) program.Inspection ProgramTest and Inspection T&I program
STRATEGY OBJECTIVES
RESPONSIBILITY
Operation Superintendent:
Area Operation Foreman:
Reliability Engineer:
SWITCHING INTERVAL
Switching between spare pumps and main ones shall be done once every 4 to 6 weeks to ensure the equipment availability and reliability. It shall coincide with the monthly vibration survey. For the compressor lube oil system, the functional test is preferred to be scheduled before a planned compressor shutdown.
Discussions were held with the rotating equipment manufacturers, specialists and users to clarify all corrosion, electrical and mechanical concerns regarding the switching periods between alternate pieces of rotating equipment. The compilation of all of these discussions and concerns resulted in the following two basic guidelines which within themselves comprise the heart of the Rotating Equipment Operating Strategy.
A. MEDIUM VOLTAGE EQUIPMENT (Higher than 600 V up to 13.8 KV):
Equipment of this voltage type should be switched from the stand-by mode to the operational mode once per month.
Note: Excluding any stand-by equipment that is not required by Operations should be run a minimum of one continuous hour every month.
B. LOW VOLTAGE EQUIPMENT (Equal or Less than 600 V):
Equipment of this voltage type should be switched from the stand-by mode to the operational mode once every two weeks. This includes the switching between the main and auxiliary lube/seal oil pumps.
Note: Excluding any stand-by equipment that is not required by Operations should be run a minimum of thirty continuous minutes every two weeks.
SWITCHING Time
Switching between critical pumps shall be conducted during the normal working days in day time where the support organizations are available.
SWITCHING PROCEDURES
This RIM covers four different pump startup scenarios. Each one of these scenarios includes important checks and procedures that need to be followed to ensure a reliable pump start-up. Below you will find a detailed start-up procedure for each scenario. The procedure will be detailed but general, additional steps may be required for some particular process.
FOLLOW UP PROGRAM
Key Performance indicators (KPI's)
Switchover = (Total Equipment comply with switchover/Equipment Schedule Switchover) X 100%, Target 90%
Note:
Switchover the pump:
START-UP AND STOPPAGE FOR DEFERENT TYPE OF ROTATING EQUIMPMENT
Title: Rotating Equipment Switchover Dashboard
Description:
Abstract
CONTENT
This Instruction outlines the procedures for testing spare pumps.
The text includes: DefinitionResponsibilitySwitching IntervalsSwitching TimeSwitching ProcedureSwitchover Dashboard
DEFINITION
This procedure outlines switching between "Main Pump" (running pump) and "spare pump" (the one to be tested).
All other type of equipment's (rotating and/or stationary) will be switchover based in the following:PM (Preventive Maintenance) program.
Inspection ProgramTest and Inspection T&I program
STRATEGY OBJECTIVES
RESPONSIBILITY
Operation Superintendent:
Area Operation Foreman:
Reliability Engineer:
SWITCHING INTERVAL
Switching between spare pumps and main ones shall be done once every 4 to 6 weeks to ensure the equipment availability and reliability.
It shall coincide with the monthly vibration survey.
For the compressor lube oil system, the functional test is preferred to be scheduled before a planned compressor shutdown.
Discussions were held with the rotating equipment manufacturers, specialists and users to clarify all corrosion, electrical and mechanical concerns regarding the switching periods between alternate pieces of rotating equipment.
The compilation of all of these discussions and concerns resulted in the following two basic guidelines which within themselves comprise the heart of the Rotating Equipment Operating Strategy.
A.
MEDIUM VOLTAGE EQUIPMENT (Higher than 600 V up to 13.
8 KV):
Equipment of this voltage type should be switched from the stand-by mode to the operational mode once per month.
Note: Excluding any stand-by equipment that is not required by Operations should be run a minimum of one continuous hour every month.
B.
LOW VOLTAGE EQUIPMENT (Equal or Less than 600 V):
Equipment of this voltage type should be switched from the stand-by mode to the operational mode once every two weeks.
This includes the switching between the main and auxiliary lube/seal oil pumps.
Note: Excluding any stand-by equipment that is not required by Operations should be run a minimum of thirty continuous minutes every two weeks.
SWITCHING Time
Switching between critical pumps shall be conducted during the normal working days in day time where the support organizations are available.
SWITCHING PROCEDURES
This RIM covers four different pump startup scenarios.
Each one of these scenarios includes important checks and procedures that need to be followed to ensure a reliable pump start-up.
Below you will find a detailed start-up procedure for each scenario.
The procedure will be detailed but general, additional steps may be required for some particular process.
FOLLOW UP PROGRAM
Key Performance indicators (KPI's)
Switchover = (Total Equipment comply with switchover/Equipment Schedule Switchover) X 100%, Target 90%
Note:
Switchover the pump:
START-UP AND STOPPAGE FOR DEFERENT TYPE OF ROTATING EQUIMPMENT.
Related Results
Assessment of digital switchover compliance in select television stations in delta state, Nigeria
Assessment of digital switchover compliance in select television stations in delta state, Nigeria
The study examined the extent of compliance of digital switchover in Nigerian Television Authority, Asaba and Quest Television, Ughelli. It also examined the influence of manageria...
Digital switchover in Hungary: achievements and challenges
Digital switchover in Hungary: achievements and challenges
In Hungary, the run-up to digital switchover started in March 2007 with the adoption of a government strategy. Since then, the tendering process for the rights to use the frequenci...
Optimisation of Heating System Powered by Air Heat Pump and Gas Condensing Boiler Hybrid Unit
Optimisation of Heating System Powered by Air Heat Pump and Gas Condensing Boiler Hybrid Unit
Gas condensing boiler and air to water heat pump hybrid unit is an optimal way to introduce renewable energy resources in existing buildings. Two energy sources (gas & electric...
Implementing a technical safety net: A scalable automated quality assurance tool for oncology patient navigation.
Implementing a technical safety net: A scalable automated quality assurance tool for oncology patient navigation.
612
Background:
Dana-Farber Cancer Institute (DFCI) implemented its Community-Focused Patient Navigation (CFPN) program in October 202...
Stakeholders’ views on an institutional dashboard with metrics for responsible research
Stakeholders’ views on an institutional dashboard with metrics for responsible research
Abstract
Background
Concerns about research waste have fueled debate about incentivizing individual researchers and research in...
Aplikasi Dashboard Visualisasi Data Calon Mahasiswa Baru mengunakan Metabase
Aplikasi Dashboard Visualisasi Data Calon Mahasiswa Baru mengunakan Metabase
New student data Information systems can be used as a supporting tool to support decisions. Janabadra University is one of the universities in Yogyakarta, the information system fo...
Rayleigh-Sommerfeld scalar diffraction by rotating apertures
Rayleigh-Sommerfeld scalar diffraction by rotating apertures
Abstract
We have analytically explored the Rayleigh-Sommerfeld scalar diffraction for various rotating apertures such as rotating single-slit, rotating double-slit, ...
DASHBOARD EXECUTIVE BANTUAN SOSIAL PADA SEKRETARIAT JENDERAL DPR RI MBKM
DASHBOARD EXECUTIVE BANTUAN SOSIAL PADA SEKRETARIAT JENDERAL DPR RI MBKM
Kegiatan magang dilakukan di Sekretariat Jendral DPR RI. Sekretariat Jendral DPR RI adalah unsur penunjang DPR, yang berkedududukan sebagai Kesekretariatan Lembaga. Project yang di...