The national broadband network (NBN) is the largest public infrastructure project undertaken in Australia, and NBN Co is the government-owned company responsible for building the network. By using operations research, NBN Co expects to avoid more than $AUD1.7 billion in unnecessary construction and design costs on this $AUD36 billion project. At the beginning of this 10-year project, NBN Co divided the country into more than 3,000 fiber-serving-area modules (FSAMs), each covering approximately 2,500 premises, and will design and construct one FSAM each day. NBN Co contracted with Biarri Networks, an Australian commercial mathematics company, to optimize the design task. To accomplish this, Biarri created a fiber-optic network design (FOND) software product based on a network-flow mixed-integer programming engine. This engine minimizes the cost of materials and labor for each FSAM, subject to a variety of constraints, and provides a solution in less than five minutes. To date, more than 650 FSAM designs have been completed using FOND. This has saved NBN Co an estimated $AUD325 million in avoided construction cost, and the planning time per FSAM has decreased from 145 to 16 days.
Institute for Operations Research and the Management Sciences (INFORMS)
Title: Optimizing Network Designs for the World’s Largest Broadband Project
Description:
The national broadband network (NBN) is the largest public infrastructure project undertaken in Australia, and NBN Co is the government-owned company responsible for building the network.
By using operations research, NBN Co expects to avoid more than $AUD1.
7 billion in unnecessary construction and design costs on this $AUD36 billion project.
At the beginning of this 10-year project, NBN Co divided the country into more than 3,000 fiber-serving-area modules (FSAMs), each covering approximately 2,500 premises, and will design and construct one FSAM each day.
NBN Co contracted with Biarri Networks, an Australian commercial mathematics company, to optimize the design task.
To accomplish this, Biarri created a fiber-optic network design (FOND) software product based on a network-flow mixed-integer programming engine.
This engine minimizes the cost of materials and labor for each FSAM, subject to a variety of constraints, and provides a solution in less than five minutes.
To date, more than 650 FSAM designs have been completed using FOND.
This has saved NBN Co an estimated $AUD325 million in avoided construction cost, and the planning time per FSAM has decreased from 145 to 16 days.
Related Results
EVALUASI DAMPAK PROGRAM BROADBAND LEARNING CENTER DI TAMAN PRESTASI SURABAYA
EVALUASI DAMPAK PROGRAM BROADBAND LEARNING CENTER DI TAMAN PRESTASI SURABAYA
Broadband Learning Center adalah program pelatihan komputer gratis yang disediakan oleh Pemerintah Kota Surabaya yang bertujuan untuk menjawab permasalahan di Surabaya seperti masy...
Broadband Access and Health Outcomes in FCC Priority Counties: A Longitudinal Analysis
Broadband Access and Health Outcomes in FCC Priority Counties: A Longitudinal Analysis
Background: The relationship between broadband access and health outcomes is an emerging field of interest within public health research. In an increasingly digital world, it is im...
The Geography of Cyberspace
The Geography of Cyberspace
The Virtual and the Physical
The structure of virtual space is a product of the Internet’s geography and technology. Debates around the nature of the virtual — culture, s...
Current Status and Future Projections of Broadband Internet:Functional and Technical Challenges, Individual and Social Impacts, Solutions and Strategies, and Emerging Technologies
Current Status and Future Projections of Broadband Internet:Functional and Technical Challenges, Individual and Social Impacts, Solutions and Strategies, and Emerging Technologies
The broadband Internet has revolutionized various aspects of human life and has had a profound impact on the world. More than 60% of individual activities and social interactions, ...
Access Denied
Access Denied
Introduction
As social-distancing mandates in response to COVID-19 restricted in-person data collection methods such as participant observation and interviews, researchers turned t...
Prediction of Urban Air Mobility Multirotor VTOL Broadband Noise Using UCD-QuietFly
Prediction of Urban Air Mobility Multirotor VTOL Broadband Noise Using UCD-QuietFly
This paper investigates broadband noise of multirotor urban air mobility (UAM) vertical take-off and landing (VTOL) vehicles. Based on an earlier single-rotor trailing-edge noise p...
Broadband in Kansas: The Challenges of Digital Access and Affordability
Broadband in Kansas: The Challenges of Digital Access and Affordability
The Institute for Policy & Social Research (IPSR) at the University of Kansas received funding from the Economic Development Administration at the U.S. Department of Commerce u...