Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Coiled-Tubing Gas Lift System Doubled Oil Production from Al-Wafa Field

View through CrossRef
Abstract Recompleting the wells with an artificial lift system requires a large capital investment in addition to rig intervention, a capital which was not made available due to worsening security condition in Libya in the period between 2014 − 2017, therefore, rig-less gas lift system via Coiled Tubing was chosen as the most efficient, reliable and cost-effective technique to revive oil production from 12 dead wells. The results of this pilot project were very satisfactory. The technique involves running coiled tubing inside the production tubing of a dead oil well, the coiled tubing is then hung over an additional special tubing hanger, made specifically for this project, fixed on the Xmas Tree. The gas is injected down continuously through a single point at the end of coiled tubing which is mixed with the oil in the production tubing annulus and helps lifting the liquid to the surface. Since compression system was not made available, due to cost cutting procedures implemented by MOG, the injection rate and injection pressure were supplied through a 2″ pipe connected to a gas well which had high wellhead pressure. Since the wells had been dead for a couple of years, there was a high uncertainty in the design due to the lack of fresh data, therefore, N2 lifting with downhole slickline gauges and surface testing were utilized to obtain reliable and fresh data for the final design. Since, the Coiled Tubing Gas Lift System CTGL technique was implemented in Libya for the first time, two wells among 12 dead wells only were selected for the Pilot project. The results of the two wells were satisfactory. Oil production from the first two wells increased significantly from 0 BOPD to 4500 BOPD, which increased the overall total field oil production by 100% from 4500 BOPD to 11,000 BOPD. Since the reservoir communication is extremely high, nearby wells’ production was positively impacted as well, and overall field production increased from 4500 BOPD to nearly 11000 BOPD in two months. The novelty of the technique comes from the utilization of the wellhead pressure of nearby gas wells as a source of injection pressure and injection rate which made reviving dead wells possible without investing in compression systems, seen as uneconomic for a pilot project.
Title: Coiled-Tubing Gas Lift System Doubled Oil Production from Al-Wafa Field
Description:
Abstract Recompleting the wells with an artificial lift system requires a large capital investment in addition to rig intervention, a capital which was not made available due to worsening security condition in Libya in the period between 2014 − 2017, therefore, rig-less gas lift system via Coiled Tubing was chosen as the most efficient, reliable and cost-effective technique to revive oil production from 12 dead wells.
The results of this pilot project were very satisfactory.
The technique involves running coiled tubing inside the production tubing of a dead oil well, the coiled tubing is then hung over an additional special tubing hanger, made specifically for this project, fixed on the Xmas Tree.
The gas is injected down continuously through a single point at the end of coiled tubing which is mixed with the oil in the production tubing annulus and helps lifting the liquid to the surface.
Since compression system was not made available, due to cost cutting procedures implemented by MOG, the injection rate and injection pressure were supplied through a 2″ pipe connected to a gas well which had high wellhead pressure.
Since the wells had been dead for a couple of years, there was a high uncertainty in the design due to the lack of fresh data, therefore, N2 lifting with downhole slickline gauges and surface testing were utilized to obtain reliable and fresh data for the final design.
Since, the Coiled Tubing Gas Lift System CTGL technique was implemented in Libya for the first time, two wells among 12 dead wells only were selected for the Pilot project.
The results of the two wells were satisfactory.
Oil production from the first two wells increased significantly from 0 BOPD to 4500 BOPD, which increased the overall total field oil production by 100% from 4500 BOPD to 11,000 BOPD.
Since the reservoir communication is extremely high, nearby wells’ production was positively impacted as well, and overall field production increased from 4500 BOPD to nearly 11000 BOPD in two months.
The novelty of the technique comes from the utilization of the wellhead pressure of nearby gas wells as a source of injection pressure and injection rate which made reviving dead wells possible without investing in compression systems, seen as uneconomic for a pilot project.

Related Results

Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Coiled Tubing Working Life Prediction
Coiled Tubing Working Life Prediction
ABSTRACT Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coi...

Back to Top