Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

MPD Operation Solved Drilling Challenges in Sour HPHT Asphalt Formation in Y filed

View through CrossRef
Abstract In Y Field, three wells were temporarily abandoned, which were based on conventional technology while drilling through this sour active HPHT asphalt formation (Kazh). MPD Operation & technology were introduced and finally solved the problem and successfully delivered the said three wells in time. Conventional MPD was focusing on Constant bottom-hole pressure (CBHP), which is widely used in narrow operation window while drilling. During drilling those three wells, different concept were set to control asphalt invasion and hole stability, which was referred as “dynamic bottom hole pressure difference while drilling” by means of MPD operations. The paper addressed feasibility studies to adopt MPD in active asphalt formation in Y Field prior to the real operation; “fit-for purpose” MPD operation design & operations while drilling through the first well in Y field; MPD equipment and parameters modifications after acquired experience from the first well; associated necessary knowledge and technologies to successfully drilled through abovementioned asphalt formation, Running Casing, Cement the same were also mentioned inside the paper. In order to completely introduce this different utilization in Y Filed, another case of drilling through formation Kazh (Asphalt formation in Y Field) with MPD under mud cap when hole is in total loss, is also introduced in this paper. In conclusion, the paper indicated that knowing the character of Kazh formation stood the first position before introduce any new technology. While distribution of asphalt was not clear, a dedicated size of casing to seal off other formations in the original same open hole (e.g.: well F21) is still the option. If none of the above can be obtained, to analyze/investigate invasion speed of asphalt under different assumptions & conditions, utilizing MPD with controlled flow rate to selected asphalt shall be one of the best options, meanwhile, drilling fluid & tools should also be updated to adapt to this option. In case of failure of controlled flowing rate efforts, drilling asphalt with MPD and Mud Cup in order to quickly drill through will be the last solution to asphalt formation in Y field.
Title: MPD Operation Solved Drilling Challenges in Sour HPHT Asphalt Formation in Y filed
Description:
Abstract In Y Field, three wells were temporarily abandoned, which were based on conventional technology while drilling through this sour active HPHT asphalt formation (Kazh).
MPD Operation & technology were introduced and finally solved the problem and successfully delivered the said three wells in time.
Conventional MPD was focusing on Constant bottom-hole pressure (CBHP), which is widely used in narrow operation window while drilling.
During drilling those three wells, different concept were set to control asphalt invasion and hole stability, which was referred as “dynamic bottom hole pressure difference while drilling” by means of MPD operations.
The paper addressed feasibility studies to adopt MPD in active asphalt formation in Y Field prior to the real operation; “fit-for purpose” MPD operation design & operations while drilling through the first well in Y field; MPD equipment and parameters modifications after acquired experience from the first well; associated necessary knowledge and technologies to successfully drilled through abovementioned asphalt formation, Running Casing, Cement the same were also mentioned inside the paper.
In order to completely introduce this different utilization in Y Filed, another case of drilling through formation Kazh (Asphalt formation in Y Field) with MPD under mud cap when hole is in total loss, is also introduced in this paper.
In conclusion, the paper indicated that knowing the character of Kazh formation stood the first position before introduce any new technology.
While distribution of asphalt was not clear, a dedicated size of casing to seal off other formations in the original same open hole (e.
g.
: well F21) is still the option.
If none of the above can be obtained, to analyze/investigate invasion speed of asphalt under different assumptions & conditions, utilizing MPD with controlled flow rate to selected asphalt shall be one of the best options, meanwhile, drilling fluid & tools should also be updated to adapt to this option.
In case of failure of controlled flowing rate efforts, drilling asphalt with MPD and Mud Cup in order to quickly drill through will be the last solution to asphalt formation in Y field.

Related Results

Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Contractor Ownership of MPD Systems to Increase Availability and Use of MPD Methods
Contractor Ownership of MPD Systems to Increase Availability and Use of MPD Methods
Abstract Objectives/Scope The goal of this paper is to provide a detailed analysis of factors affecting the permanent integratio...
A Novel Intelligent Managed Pressure Drilling System Based on Multi-Device Collaborative Control and Its Application
A Novel Intelligent Managed Pressure Drilling System Based on Multi-Device Collaborative Control and Its Application
Abstract With the rapid development of automation and intelligence technology in petroleum engineering field, automated drilling equipment is gradually being popu...
Conceptual design report of the MPD Cosmic Ray Detector (MCORD)
Conceptual design report of the MPD Cosmic Ray Detector (MCORD)
Abstract This report presents a concept of constructing a detector dedicated for detection of muons observed during measurements carried out at the MPD (Multi-Pu...
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
Abstract The Bureau of Safety and Environmental Enforcement (BSEE) first published High Pressure/High Temperature (HPHT) regulations at 30 CFR 250.807 in 2010. Addit...
MPD Candidate Identification: To MPD or Not To MPD
MPD Candidate Identification: To MPD or Not To MPD
AbstractThe entire range of Managed Pressure Drilling (MPD) applications (Traditional, Advanced, and Expanded) has continued to progress in the last few years, thanks to technologi...
The Development of a New Thermoplastic Elastomer (TPE)-Modified Asphalt
The Development of a New Thermoplastic Elastomer (TPE)-Modified Asphalt
The use of (recycled) plastics and (waste) vulcanized rubber powder is the main polymer of raw materials, and composite organic additives are selected to fully combine with asphalt...
Rheological and Rutting Characterization of Asphalt Mixes with Modified Binders
Rheological and Rutting Characterization of Asphalt Mixes with Modified Binders
Abstract This paper presents the results of investigations on the rheological properties of modified asphalt binders and their influence on the performance of asphal...

Back to Top