Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Multiproject Resources Allocation Model under Fuzzy Random Environment and Its Application to Industrial Equipment Installation Engineering

View through CrossRef
This paper focuses on a multiproject resource allocation problem in a bilevel organization. To solve this problem, a bilevel multiproject resource allocation model under a fuzzy random environment is proposed. Two levels of decision makers are considered in the model. On the upper level, the company manager aims to allocate the company's resources to multiple projects to achieve the lowest cost, which include resource costs and a tardiness penalty. On the lower level, each project manager attempts to schedule their resource-constrained project, with minimization of project duration as the main objective. In contrast to prior studies, uncertainty in resource allocation has been explicitly considered. Specifically, our research uses fuzzy random variables to model uncertain activity durations and resource costs. To search for the optimal solution of the bilevel model, a hybrid algorithm made up of an adaptive particle swarm optimization, an adaptive hybrid genetic algorithm, and a fuzzy random simulation algorithm is also proposed. Finally, the efficiency of the proposed model and algorithm is evaluated through a practical case from an industrial equipment installation company. The results show that the proposed model is efficient in dealing with practical resource allocation problems in a bilevel organization.
Title: Multiproject Resources Allocation Model under Fuzzy Random Environment and Its Application to Industrial Equipment Installation Engineering
Description:
This paper focuses on a multiproject resource allocation problem in a bilevel organization.
To solve this problem, a bilevel multiproject resource allocation model under a fuzzy random environment is proposed.
Two levels of decision makers are considered in the model.
On the upper level, the company manager aims to allocate the company's resources to multiple projects to achieve the lowest cost, which include resource costs and a tardiness penalty.
On the lower level, each project manager attempts to schedule their resource-constrained project, with minimization of project duration as the main objective.
In contrast to prior studies, uncertainty in resource allocation has been explicitly considered.
Specifically, our research uses fuzzy random variables to model uncertain activity durations and resource costs.
To search for the optimal solution of the bilevel model, a hybrid algorithm made up of an adaptive particle swarm optimization, an adaptive hybrid genetic algorithm, and a fuzzy random simulation algorithm is also proposed.
Finally, the efficiency of the proposed model and algorithm is evaluated through a practical case from an industrial equipment installation company.
The results show that the proposed model is efficient in dealing with practical resource allocation problems in a bilevel organization.

Related Results

Konstruksi Sistem Inferensi Fuzzy Menggunakan Subtractive Fuzzy C-Means pada Data Parkinson
Konstruksi Sistem Inferensi Fuzzy Menggunakan Subtractive Fuzzy C-Means pada Data Parkinson
Abstract. Fuzzy Inference System requires several stages to get the output, 1) formation of fuzzy sets, 2) formation of rules, 3) application of implication functions, 4) compositi...
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
Background Several scholars defined the concepts of fuzzy soft set theory and their application on decision-making problem. Based on this concept, researchers defined the generalis...
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Here in this paper, we provide characterizations of fuzzy quasi-ideal in terms of level and strong level subsets. Along with it, we provide expression for the generated fuzzy quasi...
Fuzzy Chaotic Neural Networks
Fuzzy Chaotic Neural Networks
An understanding of the human brain’s local function has improved in recent years. But the cognition of human brain’s working process as a whole is still obscure. Both fuzzy logic ...
Fuzzy Semantic Models of Fuzzy Concepts in Fuzzy Systems
Fuzzy Semantic Models of Fuzzy Concepts in Fuzzy Systems
The fuzzy properties of language semantics are a central problem towards machine-enabled natural language processing in cognitive linguistics, fuzzy systems, and computational ling...
FUZZY RINGS AND ITS PROPERTIES
FUZZY RINGS AND ITS PROPERTIES
Abstract One of algebraic structure that involves a binary operation is a group that is defined  an un empty set (classical) with an associative binary operation, it has identity e...
Study on the characteristics and synergistic effects of industrial complex networks – empirical evidence from Chinese manufacturing
Study on the characteristics and synergistic effects of industrial complex networks – empirical evidence from Chinese manufacturing
PurposeThe manufacturing industry and the producer service industry have a high degree of industrial correlation, and their integration will cause changes in the complex industrial...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...

Back to Top