Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

THE CHALLENGES OF CONSTRUCTION WASTE MANAGEMENT IN KUALA LUMPUR

View through CrossRef
Rapid growth in construction activities in Kuala Lumpur resulted in increasing of construction waste problems. Construction waste gives a negative impact to the environment, cost, time, productivity and social of the country. This paper studies the challenges of construction waste management faced by the contractors undertake projects in Kuala Lumpur. Eighty five (85) numbers of questionnaires were distributed to various groups of respondents which include main contractors, registered contractor for collection of waste, Kuala Lumpur City Hall (DBKL) officers and Solid Waste Corporation (SWCorp) officers.  Spearman’s rank correlation coefficient analysis, mean ranking analysis, Kruskal-Wallis test, and factor analysis are among the analysis used in this study. In addition correlation test were also conducted to establish the correlation between the factors. The result shows that the factor influenced in successful implementation of Construction waste management (CWM) for DBKL projects are internal factor, management factors, local authority factor and law regulation. The findings also show that the barrier in implementing CWM in DBKL projects is due to the lack of authority to monitor the management of construction waste on site.  The findings of this study highlight the scenario of the current CWM for projects in Kuala Lumpur and thus, provide the recommendation in improving the CWM in Kuala Lumpur.
Title: THE CHALLENGES OF CONSTRUCTION WASTE MANAGEMENT IN KUALA LUMPUR
Description:
Rapid growth in construction activities in Kuala Lumpur resulted in increasing of construction waste problems.
Construction waste gives a negative impact to the environment, cost, time, productivity and social of the country.
This paper studies the challenges of construction waste management faced by the contractors undertake projects in Kuala Lumpur.
Eighty five (85) numbers of questionnaires were distributed to various groups of respondents which include main contractors, registered contractor for collection of waste, Kuala Lumpur City Hall (DBKL) officers and Solid Waste Corporation (SWCorp) officers.
  Spearman’s rank correlation coefficient analysis, mean ranking analysis, Kruskal-Wallis test, and factor analysis are among the analysis used in this study.
In addition correlation test were also conducted to establish the correlation between the factors.
The result shows that the factor influenced in successful implementation of Construction waste management (CWM) for DBKL projects are internal factor, management factors, local authority factor and law regulation.
The findings also show that the barrier in implementing CWM in DBKL projects is due to the lack of authority to monitor the management of construction waste on site.
  The findings of this study highlight the scenario of the current CWM for projects in Kuala Lumpur and thus, provide the recommendation in improving the CWM in Kuala Lumpur.

Related Results

Seditious Spaces
Seditious Spaces
The title ‘Seditious Spaces’ is derived from one aspect of Britain’s colonial legacy in Malaysia (formerly Malaya): the Sedition Act 1948. While colonial rule may seem like it was ...
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
In this era of startling developments in the medical field there remains a serious worry about the  hazardous  potential  of  various  by  products  which  if  not  properly  addre...
High Pressure Pump, Eliminasi Risiko K3 Trucking System pada Pengangkutan Lumpur di Pertambangan Batubara
High Pressure Pump, Eliminasi Risiko K3 Trucking System pada Pengangkutan Lumpur di Pertambangan Batubara
Penanganan lumpur di titik terendah tambang batubara merupakan salah satu tugas yang berisiko dalam operasi pertambangan. Penggunaan truk sebagai alat pengangkutan lumpur di area t...
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
Textile waste is one of the 2nd largest types of waste in the world. The increasing amount of textile waste will have an impact on the environment. There has not been much developm...
EVALUASI SISTEM PENGENDALIAN MANAJEMEN PADA PELAYANAN PERSAMPAHAN PEMERINTAH KABUPATEN TEMANGGUNG
EVALUASI SISTEM PENGENDALIAN MANAJEMEN PADA PELAYANAN PERSAMPAHAN PEMERINTAH KABUPATEN TEMANGGUNG
Garbage is a problem that is still homework for most areas, starting from the household scale, village/kelurahan, district, and even national scale. A management control system in ...
Construction Waste Estimation Analysis in Residential Projects of Malaysia
Construction Waste Estimation Analysis in Residential Projects of Malaysia
Construction and demolition (C&D) waste account for an oversized share of all solid waste generated worldwide. Statistical data confirm that, globally, 10-30% of waste originat...
The Urban Geomorphology of Kuala Lumpur
The Urban Geomorphology of Kuala Lumpur
The city of Kuala Lumpur, lying at the junction of the hills of the Main Range (Banjaran Titiwangsa) of Peninsular Malaysia and the coastal plain, has many of the environmental pro...

Back to Top