ABSTRACT
The use of existing tankers as a permanently moored floating storage offloading (FSO) or floating production storage and offloading (FPSO) has been wide spread in theoil industry ever since tankers were used for storage. However, the application of an existing tanker for North Sea FPSO use meeting the stringent demands of the regulatory bodies and the harsh environment of the North Sea has withheld operators from using existing tankers in the North Sea. The acceptance of FPSO technology in the North Sea and the proven ability to moor a tanker with apassive mooring system in a harsh environment has opened the avenue to use existing tankers for use as an FPSO in the North Sea. This is also driven by the search for cost effective solutions for field development plans in order to make marginal fields economically exploitable. ThePOtential reuse of an FPSO on a different location also makes the depreciation period of the FPSO vessel life related instead of field life related.
Many issues related to the use of an FPSO in the North Sea are currently subject of papers at various forums.
This paper, however, only addresses three crucial areas:the criteria for selection of an existing tanker;the use of a passive mooring systemthe fatigue assessment and required modifications.
The paper is based on experiences gained during the engineering, design and construction phase of the ULSGE GORM, the FPSO, which Blue water will initially use for Amerada Hess Limited's Fife Field on the UK continentalshelf and confirms that the conversion of a suitable tanker to North Sea FPSO Use is a technically flexible and aneconomically attractive solution. Figures at end of paper
SELECTION CRITERIA OF AN EXISTING TANKER
1.1Introduction
This section addresses three issues namely:criteria for selection of a suitable shipusability of existing machinery and systemsupgrading of existing systems.
The advantages of using an existing tanker versus a new built tanker lie mainly in the area of availability of a suitable ship and the associated reduction in project execution time. Furthermore, less capital expenditure is required to acquire the base vessel and also the full data of the ship are available from very early in the project. The disadvantages mainly are found in a less long remaining life time when compared to a new built vessel, acceptance of older technology and some equipment becoming redundant or superfluous.
1.2Tanker Selection Criteria
Initially the principle characteristics to be determined are based on expected fields of application for the FPSO. The required characteristics basically regard only the hull with the prime criteria being the age of the vessel and the anticipated flow rate of the field(s). The estimated or desired shuttle tanker capacity and frequency determines the required storage capacity while the minimum freeboard remaining at that capacity will define overall capacity as shown in figure 1. The basic tank lay out required is also of importance as this is governed by the percentage produced water during field life.
Title: Conversion of Existing Tanker to North Sea FPSO Use
Description:
ABSTRACT
The use of existing tankers as a permanently moored floating storage offloading (FSO) or floating production storage and offloading (FPSO) has been wide spread in theoil industry ever since tankers were used for storage.
However, the application of an existing tanker for North Sea FPSO use meeting the stringent demands of the regulatory bodies and the harsh environment of the North Sea has withheld operators from using existing tankers in the North Sea.
The acceptance of FPSO technology in the North Sea and the proven ability to moor a tanker with apassive mooring system in a harsh environment has opened the avenue to use existing tankers for use as an FPSO in the North Sea.
This is also driven by the search for cost effective solutions for field development plans in order to make marginal fields economically exploitable.
ThePOtential reuse of an FPSO on a different location also makes the depreciation period of the FPSO vessel life related instead of field life related.
Many issues related to the use of an FPSO in the North Sea are currently subject of papers at various forums.
This paper, however, only addresses three crucial areas:the criteria for selection of an existing tanker;the use of a passive mooring systemthe fatigue assessment and required modifications.
The paper is based on experiences gained during the engineering, design and construction phase of the ULSGE GORM, the FPSO, which Blue water will initially use for Amerada Hess Limited's Fife Field on the UK continentalshelf and confirms that the conversion of a suitable tanker to North Sea FPSO Use is a technically flexible and aneconomically attractive solution.
Figures at end of paper
SELECTION CRITERIA OF AN EXISTING TANKER
1.
1Introduction
This section addresses three issues namely:criteria for selection of a suitable shipusability of existing machinery and systemsupgrading of existing systems.
The advantages of using an existing tanker versus a new built tanker lie mainly in the area of availability of a suitable ship and the associated reduction in project execution time.
Furthermore, less capital expenditure is required to acquire the base vessel and also the full data of the ship are available from very early in the project.
The disadvantages mainly are found in a less long remaining life time when compared to a new built vessel, acceptance of older technology and some equipment becoming redundant or superfluous.
1.
2Tanker Selection Criteria
Initially the principle characteristics to be determined are based on expected fields of application for the FPSO.
The required characteristics basically regard only the hull with the prime criteria being the age of the vessel and the anticipated flow rate of the field(s).
The estimated or desired shuttle tanker capacity and frequency determines the required storage capacity while the minimum freeboard remaining at that capacity will define overall capacity as shown in figure 1.
The basic tank lay out required is also of importance as this is governed by the percentage produced water during field life.
Related Results
Competitive CVAR-FPSO concepts with Dry trees in ultra-deepwater; Weathervaning CVAR-FPSO for Brazil and Indonesia vs. Non-weathervaning for West Africa
Competitive CVAR-FPSO concepts with Dry trees in ultra-deepwater; Weathervaning CVAR-FPSO for Brazil and Indonesia vs. Non-weathervaning for West Africa
Abstract
A new FPSO concept termed CVAR-FPSO is under development by a JNOC headed Joint Industry Project (JIP). The concept, using Compliant Vertical Access Rise...
FPSO's Today: What is the Optimum Concept?
FPSO's Today: What is the Optimum Concept?
ABSTRACT
FPSO technology over the past years has rapidly evolved from tanker based units with classical mooring systems to purpose-shaped new built vessels equipp...
FPSO EIS Results and Record of Decision
FPSO EIS Results and Record of Decision
Abstract
The United States Department of the Interior (DOI), Minerals Management Service (MMS) prepared an environmental impact statement (EIS)1 to evaluate poten...
Design and Conversion of FPSO Mystras
Design and Conversion of FPSO Mystras
Abstract
A recently completed FPSO conversion project shows some novel features in FPSO design. An existing trading tanker was selected for conversion into a 48,0...
The Challenges and Opportunities of FPSO Relocations
The Challenges and Opportunities of FPSO Relocations
Abstract
The first FPSO relocation project was completed 18 years ago (SBM's FPSO II), and since that time there has been a steady rise in the number and complexi...
Deepstar Study on Predicting FPSO Responses - Model Tests VS Numerical Analysis
Deepstar Study on Predicting FPSO Responses - Model Tests VS Numerical Analysis
1. ABSTRACT
This paper presents the correlation study of FPSO model tests and numerical analyses sponsored by the DeepStar program. The numerical analysis results...
The Sanha LPG FPSO
The Sanha LPG FPSO
Abstract
The FPSO industry will soon have the first LPG FPSO in operation. The SANHA LPG FPSO is the first gas related FPSO. With the installation of the LPG FPSO...
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Abstract
Floating Production, Storage, and Offloading (FPSO) systems represent an untested technology in the U.S. Gulf of Mexico (GOM) Outer Continental Shelf. Th...