Javascript must be enabled to continue!
Application of comprehensive reinforcement technology in high-rise building
View through CrossRef
In the structural reinforcement of a high-rise residential building in Changzhou city, Jiangsu province, China, the technology of prestressed steel bar strengthening shear wall, which was initiated in China, was applied. Combined with the engineering quality inspection report, the project characteristics and the requirements of the construction party, various methods, such as increasing cross-section reinforcement method and staged replacement concrete reinforcement method, were comprehensively used to treat and reinforce the structures with different quality problems and different parts. In general, the stress and strain of the newly added part always lags behind the stress and strain of the original structure. This will cause the stress of the original structure is too high and the deformation is large, while the stress of the new part is still at a low level, which cannot fully play its role and its due reinforcement effect. Prestressed steel bar reinforced shear wall technology, through the prestressed steel bar on the prestressed steel bar, which is a good solution to this problem, avoid the phenomenon of stress lag, and ultimately not only shorten the construction period of reinforcement, but also ensure the quality of reinforcement and user use area, successfully passed the reinforcement special acceptance. The monitoring data also proved that the reinforcement measures adopted are safe, reliable and economical. This paper can provide reference for the effective development of similar reinforcement projects.
Title: Application of comprehensive reinforcement technology in high-rise building
Description:
In the structural reinforcement of a high-rise residential building in Changzhou city, Jiangsu province, China, the technology of prestressed steel bar strengthening shear wall, which was initiated in China, was applied.
Combined with the engineering quality inspection report, the project characteristics and the requirements of the construction party, various methods, such as increasing cross-section reinforcement method and staged replacement concrete reinforcement method, were comprehensively used to treat and reinforce the structures with different quality problems and different parts.
In general, the stress and strain of the newly added part always lags behind the stress and strain of the original structure.
This will cause the stress of the original structure is too high and the deformation is large, while the stress of the new part is still at a low level, which cannot fully play its role and its due reinforcement effect.
Prestressed steel bar reinforced shear wall technology, through the prestressed steel bar on the prestressed steel bar, which is a good solution to this problem, avoid the phenomenon of stress lag, and ultimately not only shorten the construction period of reinforcement, but also ensure the quality of reinforcement and user use area, successfully passed the reinforcement special acceptance.
The monitoring data also proved that the reinforcement measures adopted are safe, reliable and economical.
This paper can provide reference for the effective development of similar reinforcement projects.
Related Results
The Effect of Compression Reinforcement on the Shear Behavior of Concrete Beams with Hybrid Reinforcement
The Effect of Compression Reinforcement on the Shear Behavior of Concrete Beams with Hybrid Reinforcement
Abstract
This study examines the impact of steel compression reinforcement on the shear behavior of concrete beams reinforced with glass fiber reinforced polymer (GFRP) bar...
Study on Scheme Optimization of bridge reinforcement increasing ratio
Study on Scheme Optimization of bridge reinforcement increasing ratio
Abstract
The bridge reinforcement methods, each method has its advantages and disadvantages. The load-bearing capacity of bridge members is controlled by the ultimat...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
PERENCANAAN HOTEL BERBINTANG 6 LANTAI DI KABUPATEN CIANJUR
PERENCANAAN HOTEL BERBINTANG 6 LANTAI DI KABUPATEN CIANJUR
ABSTRACTCianjur is a city in Indonesia that has a tourist destination. This causes many people from outside the city to come for a vacation in Cianjur district. The increasing popu...
Numerical analysis of field geosynthetic-reinforced retaining walls with secondary reinforcement
Numerical analysis of field geosynthetic-reinforced retaining walls with secondary reinforcement
Geosynthetic-reinforced retaining (GRR) walls typically have vertical reinforcement spacing of 0·6 m, and this relatively large spacing has been known to cause comparatively high c...
Mitigation Practices for Frequent Accidents in High Rise Building Construction
Mitigation Practices for Frequent Accidents in High Rise Building Construction
High-rise building construction accidents are observed within the construction industry in Sri Lanka. These accidents represent a significant loss for the construction industry in ...
PKM. PEMBERIAN REINFORCEMENT DALAM PEMBELAJARAN DAN PERKEMBANGAN MORAL ANAK DI PAUD III SARASWATI DENPASAR
PKM. PEMBERIAN REINFORCEMENT DALAM PEMBELAJARAN DAN PERKEMBANGAN MORAL ANAK DI PAUD III SARASWATI DENPASAR
This PKM is motivated by the absence of a real solution regarding providing reinforcement at PAUD III Saraswati Denpasar school. This service aims to provide a solution for how to ...
Livability of High-Rise Districts - Case Study of West Bay in Doha
Livability of High-Rise Districts - Case Study of West Bay in Doha
Doha, the capital of the state of Qatar, is a small Gulf city that grew as a port settlement on pearling and fishing activities. Since the mid-seventies, Doha has begun the process...

