Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Horizontal Multistage Acid-Fracturing Formulates Development Strategy in Tight Tuba Carbonate Reservoir, North Kuwait

View through CrossRef
Abstract Tuba is tight carbonate reservoir and one of largest Upcoming Reservoirs in North Kuwait Sabriyah field and subdivided to three main reservoir units (upper, middle and lower). Tuba, though discovered in the 60's, is still relatively under-exploited presently with only ±10 active oil producer wells with very low total production rate compared to other major reservoirs in same field. High reservoir heterogeneity, tightness, and poor fluid properties necessitate the application of fracturing stimulation technology to maximize Conductivity and hence recovery enhancement. Recent technologies in multistage acid Fracturing executed successfully covering multiple layers as first time ever in one of existing two Tuba horizontal wells. The well under study is highly deviated, completed as barefoot in the Upper Tuba reservoir, intersecting multiple sub-layers. Following the positive results of acid fracturing treatments in offset Tuba's vertical wells, the candidate well was selected for first multistage acid fracturing in horizontal wells, to setup the reservoir development plan ensuring high production potential with most cost-effective drilling and completion strategies. Rig-less 5-Stages Acid Fracture treatment was executed in flawless operation. Many technical and operational challenges were faced (Geo-mechanics, stages selection and design, cementing 7in liner) and properly handled within integrated teams with lessons learned are to be considered in next designs and executions. Initial post multistage acid Frack short term production showed productivity improvement by approximately 5 folds of pre-stimulation production. The well showed high decline in production rate within the first one-year production post fracturing stimulation. However, analysis showed that the decline mainly was caused by reservoir depletion rather than fracture conductivity deterioration. The well is under close monitoring for stabilization (rate and pressure). Horizontal PLT is planned to evaluate inflow profile from individual layers to improve next designs. Despite the close results yilded from the multistage acid fracturing in two horizontal wells compared to the results from 7 vertical wells, it is still early to evaluate stimulation potential of horizontal against vertical wells. It needs more production history and more wells to evaluate long term sustainability. Water-flooding is planned to support reservoir development and enhancing stimulation sustainability and by turn recovery factory. First pilot water flooding injector well was commissioned in early 2018, but comprehensive waterflooding analysis is not finalized yet. The initial positive results of first multistage acid fracturing in Tuba reservoir had key contribution to setup Development strategy for the entire TUBA reservoir to expand drilling horizontal wells and complete it with initial multistage fract (MSF) stimulation to maximize reservoir exposure and enhance reservoior productivity that will contribute significantly to the NK production target. Two more horizontal wells were drilled and completed with MSF in late 2018 with initial encouraging enhanced productivity results during cleaning and lifting but were not put yet on production for more comprehensive analysis. ation to improve initial productivity.
Title: Horizontal Multistage Acid-Fracturing Formulates Development Strategy in Tight Tuba Carbonate Reservoir, North Kuwait
Description:
Abstract Tuba is tight carbonate reservoir and one of largest Upcoming Reservoirs in North Kuwait Sabriyah field and subdivided to three main reservoir units (upper, middle and lower).
Tuba, though discovered in the 60's, is still relatively under-exploited presently with only ±10 active oil producer wells with very low total production rate compared to other major reservoirs in same field.
High reservoir heterogeneity, tightness, and poor fluid properties necessitate the application of fracturing stimulation technology to maximize Conductivity and hence recovery enhancement.
Recent technologies in multistage acid Fracturing executed successfully covering multiple layers as first time ever in one of existing two Tuba horizontal wells.
The well under study is highly deviated, completed as barefoot in the Upper Tuba reservoir, intersecting multiple sub-layers.
Following the positive results of acid fracturing treatments in offset Tuba's vertical wells, the candidate well was selected for first multistage acid fracturing in horizontal wells, to setup the reservoir development plan ensuring high production potential with most cost-effective drilling and completion strategies.
Rig-less 5-Stages Acid Fracture treatment was executed in flawless operation.
Many technical and operational challenges were faced (Geo-mechanics, stages selection and design, cementing 7in liner) and properly handled within integrated teams with lessons learned are to be considered in next designs and executions.
Initial post multistage acid Frack short term production showed productivity improvement by approximately 5 folds of pre-stimulation production.
The well showed high decline in production rate within the first one-year production post fracturing stimulation.
However, analysis showed that the decline mainly was caused by reservoir depletion rather than fracture conductivity deterioration.
The well is under close monitoring for stabilization (rate and pressure).
Horizontal PLT is planned to evaluate inflow profile from individual layers to improve next designs.
Despite the close results yilded from the multistage acid fracturing in two horizontal wells compared to the results from 7 vertical wells, it is still early to evaluate stimulation potential of horizontal against vertical wells.
It needs more production history and more wells to evaluate long term sustainability.
Water-flooding is planned to support reservoir development and enhancing stimulation sustainability and by turn recovery factory.
First pilot water flooding injector well was commissioned in early 2018, but comprehensive waterflooding analysis is not finalized yet.
The initial positive results of first multistage acid fracturing in Tuba reservoir had key contribution to setup Development strategy for the entire TUBA reservoir to expand drilling horizontal wells and complete it with initial multistage fract (MSF) stimulation to maximize reservoir exposure and enhance reservoior productivity that will contribute significantly to the NK production target.
Two more horizontal wells were drilled and completed with MSF in late 2018 with initial encouraging enhanced productivity results during cleaning and lifting but were not put yet on production for more comprehensive analysis.
ation to improve initial productivity.

Related Results

Sequential Propagation of Multiple Fractures in Horizontal Wells
Sequential Propagation of Multiple Fractures in Horizontal Wells
ABSTRACT: Simultaneous fracturing and zipper fracturing of horizontal wells has rapidly evolved to the development of unconventional oil and gas. The fracture int...
Acid Fracturing Technique for Carbonate Reservoirs Using Nitric Acid Powder
Acid Fracturing Technique for Carbonate Reservoirs Using Nitric Acid Powder
Abstract The length of the etched fracture is rather limited utilizing traditional acid fracturing techniques, especially in a high-temperature carbonate reservoi...
Acid-Fracturing Unlocked the Production Potential of Tight Tuba Carbonate Reservoir, North Kuwait
Acid-Fracturing Unlocked the Production Potential of Tight Tuba Carbonate Reservoir, North Kuwait
Abstract This paper will demonstrate how the acid fracturing stimulation using different technologies in multidisciplinary team integration helped un-locking the pro...
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
ABSTRACT: At present, unconventional reservoirs require horizontal drilling and large-scale hydraulic fracturing technology to increase artificial fracture networ...
Fracturing Carbonate Reservoirs: Acidising Fracturing or Fracturing with Proppants?
Fracturing Carbonate Reservoirs: Acidising Fracturing or Fracturing with Proppants?
Abstract Carbonate reservoir with low permeability is developed using fracturing technology to effectively stimulate the reservoir for a higher productivity. However...
The Fractures Optimization Method with the Threshold Pressure of Multistage Fracturing in Tight Oil Reservoir
The Fractures Optimization Method with the Threshold Pressure of Multistage Fracturing in Tight Oil Reservoir
Abstract As permeability of tight oil reservoir is generally less than 0.1md, diameters of pore throats are primarily at the micrometer- and nanometer-scale. Differe...

Back to Top