Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Hot Gas Filtration Meeting Turbine Requirements for Particulate Matter

View through CrossRef
The Power Systems Development Facility (PSDF) is an engineering scale demonstration of advanced coal-fired power systems and high-temperature, high-pressure gas filtration systems. The PSDF was designed at sufficient scale so that advanced power systems and components can be tested in an integrated fashion to provide data for commercial scale-up. The PSDF is funded by the U.S. Department of Energy, the Electric Power Research Institute, Southern Company Services, Kellogg Brown & Root, Inc. (KBR), Siemens-Westinghouse, and Peabody Energy. Gasification at the PSDF is based on KBR’s Transport Gasifier, which is an advanced circulating fluidized-bed gasifier. Hot gas filtration is a critical process in the gasification system to clean up the particulate matter before the synthesis gas (syngas) is fed to the turbine. A Siemens-Westinghouse particulate control device (PCD) is used for syngas cleanup. The PCD contains 91 candle-style filter elements. More than twenty types of filter elements, categorized as monolithic ceramic, composite ceramic, sintered-metal powder, and sintered-metal fiber, have been tested in the gasification environment at the PSDF. Up to January 2005, the longest exposure time for individual filters has been 5783 hours. The particulate loading in the clean syngas during most stable operating periods has been demonstrated to be consistently below 0.1 ppmw, which is the lower detection limit of Southern Research Institute’s sampling system. Safeguard devices (failsafes) have also been tested and developed at the PSDF. Failsafes are used to block the particulate leaking through the PCD in the case of filter element failure to eliminate damage to the turbine. Demonstration of reliable failsafes is a critical factor to the hot gas filtration technology. Several types of currently available failsafes and PSDF-developed failsafes have been tested in the PCD with gasification ash injection to simulate filter element leakage. A typical failsafe was also tested in a device equipped with a quick-open mechanism to simulate a complete filter failure during a test run operation. The testing showed promising results for certain types of failsafes. Further failsafe testing and better understanding of turbine requirements for particulate loading are needed to evaluate the PCD performance and increase readiness towards commercialization of the technology.
Title: Hot Gas Filtration Meeting Turbine Requirements for Particulate Matter
Description:
The Power Systems Development Facility (PSDF) is an engineering scale demonstration of advanced coal-fired power systems and high-temperature, high-pressure gas filtration systems.
The PSDF was designed at sufficient scale so that advanced power systems and components can be tested in an integrated fashion to provide data for commercial scale-up.
The PSDF is funded by the U.
S.
Department of Energy, the Electric Power Research Institute, Southern Company Services, Kellogg Brown & Root, Inc.
(KBR), Siemens-Westinghouse, and Peabody Energy.
Gasification at the PSDF is based on KBR’s Transport Gasifier, which is an advanced circulating fluidized-bed gasifier.
Hot gas filtration is a critical process in the gasification system to clean up the particulate matter before the synthesis gas (syngas) is fed to the turbine.
A Siemens-Westinghouse particulate control device (PCD) is used for syngas cleanup.
The PCD contains 91 candle-style filter elements.
More than twenty types of filter elements, categorized as monolithic ceramic, composite ceramic, sintered-metal powder, and sintered-metal fiber, have been tested in the gasification environment at the PSDF.
Up to January 2005, the longest exposure time for individual filters has been 5783 hours.
The particulate loading in the clean syngas during most stable operating periods has been demonstrated to be consistently below 0.
1 ppmw, which is the lower detection limit of Southern Research Institute’s sampling system.
Safeguard devices (failsafes) have also been tested and developed at the PSDF.
Failsafes are used to block the particulate leaking through the PCD in the case of filter element failure to eliminate damage to the turbine.
Demonstration of reliable failsafes is a critical factor to the hot gas filtration technology.
Several types of currently available failsafes and PSDF-developed failsafes have been tested in the PCD with gasification ash injection to simulate filter element leakage.
A typical failsafe was also tested in a device equipped with a quick-open mechanism to simulate a complete filter failure during a test run operation.
The testing showed promising results for certain types of failsafes.
Further failsafe testing and better understanding of turbine requirements for particulate loading are needed to evaluate the PCD performance and increase readiness towards commercialization of the technology.

Related Results

Research on the Physicochemical Properties of Fine Particulate Matter in Changchun, Northeast China
Research on the Physicochemical Properties of Fine Particulate Matter in Changchun, Northeast China
Abstract Objective: Air particulate matter concentrations in Changchun City, Jilin Province, may change around the autumn heating day. The aim of this study was to p...
Comprehensive Calculation And Performance Analysis Of Gas Turbine Reversible Power Turbine
Comprehensive Calculation And Performance Analysis Of Gas Turbine Reversible Power Turbine
Gas turbine technology trends to be maturing now, but the problem of which not being able to reverse directly remains resolve. In the field of marine, most ships reverse by adjusta...
Development of a Maintenance Program for Major Gas Turbine Hot Gas Path Parts
Development of a Maintenance Program for Major Gas Turbine Hot Gas Path Parts
The thermal efficiency of gas turbine combined cycle power generation plants increase significantly in accordance with turbine inlet temperature. Gas turbine combined cycle power p...
Air Filtration - The Dark Horse of Gas Turbine Performance
Air Filtration - The Dark Horse of Gas Turbine Performance
Abstract Objectives/Scope Enhancements the performance of Rotating Equipment in term of cost optimization by extending the MTBI ...
On-Design and Off-Design Performance Analysis of a Gas Turbine Combined Cycle Using the Exergy Method
On-Design and Off-Design Performance Analysis of a Gas Turbine Combined Cycle Using the Exergy Method
The present paper describes an on-design and an off-design performance study of gas turbine combined cycle based power plants. The exergy analysis has been carried out along with t...
Filtration, 1. Fundamentals
Filtration, 1. Fundamentals
Abstract The article contains sections titled: ...
Hybrid Offshore Power Generation
Hybrid Offshore Power Generation
Abstract Amid 2020 challenging business environments due to COVID-19 pandemic and strong global push towards transition to cleaner energy, PETRONAS has declared its'...
Comparisons of Pore Structure for Unconventional Tight Gas, Coalbed Methane and Shale Gas Reservoirs
Comparisons of Pore Structure for Unconventional Tight Gas, Coalbed Methane and Shale Gas Reservoirs
Extended abstract Tight sands gas, coalbed methane and shale gas are three kinds of typical unconventional natural gas. With the decrease of conventional oil and gas...

Back to Top