Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Models for predicting quality of building projects

View through CrossRef
PurposeThe objectives of this paper are to: find out whether design‐bid‐build (DBB) or design‐build (DB) procurement method gives better quality building; identify variables that significantly affect quality scores of DBB and DB projects; and construct models to predict quality scores of DB and DBB projects.Design/methodology/approachThe research design was based on a structured questionnaire and data on quality performance and factors that may affect quality of a building project were collected by postal survey and face‐to‐face interviews.FindingsThere was no significant difference between the quality scores of DB and DBB projects. To ensure that buildings procured through DBB have high quality, owners should adopt the following practices: engage experienced consultants; short‐list bidders and select contractors based on a combination of price and ability. To obtain high quality DB buildings, owners should engage architects to prepare the scheme design and not to set the budget too early. For both types of projects, owners should allow contractors to propose changes to the contract with a view to improving its quality.Research limitations/implicationsAs there is no significant difference in quality of DBB and DB projects, the argument that DB projects produce lower quality buildings is demolished.Practical implicationsThe practical implication is that owners play an important part in ensuring that they obtain buildings of high quality.Originality/valueBuilding owners and consultants can use the two models to predict quality scores of DBB and DB projects and take specific actions to improve the quality of their projects if necessary.
Title: Models for predicting quality of building projects
Description:
PurposeThe objectives of this paper are to: find out whether design‐bid‐build (DBB) or design‐build (DB) procurement method gives better quality building; identify variables that significantly affect quality scores of DBB and DB projects; and construct models to predict quality scores of DB and DBB projects.
Design/methodology/approachThe research design was based on a structured questionnaire and data on quality performance and factors that may affect quality of a building project were collected by postal survey and face‐to‐face interviews.
FindingsThere was no significant difference between the quality scores of DB and DBB projects.
To ensure that buildings procured through DBB have high quality, owners should adopt the following practices: engage experienced consultants; short‐list bidders and select contractors based on a combination of price and ability.
To obtain high quality DB buildings, owners should engage architects to prepare the scheme design and not to set the budget too early.
For both types of projects, owners should allow contractors to propose changes to the contract with a view to improving its quality.
Research limitations/implicationsAs there is no significant difference in quality of DBB and DB projects, the argument that DB projects produce lower quality buildings is demolished.
Practical implicationsThe practical implication is that owners play an important part in ensuring that they obtain buildings of high quality.
Originality/valueBuilding owners and consultants can use the two models to predict quality scores of DBB and DB projects and take specific actions to improve the quality of their projects if necessary.

Related Results

Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Objective: To determine the frequency of common chromosomal aberrations in local population idiopathic determine the frequency of common chromosomal aberrations in local population...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Performative Microforests
Performative Microforests
The design of office buildings can substantially improve the building, social, and ecological performance of office building projects. However, existing research on improving the p...
Architecture and adaptation
Architecture and adaptation
«The architectural work transcends the architect, goes beyond the moment in which its construction takes place, and therefore can be contemplated under the changing lights of histo...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Selection of Injectable Drug Product Composition using Machine Learning Models (Preprint)
Selection of Injectable Drug Product Composition using Machine Learning Models (Preprint)
BACKGROUND As of July 2020, a Web of Science search of “machine learning (ML)” nested within the search of “pharmacokinetics or pharmacodynamics” yielded over 100...
ANALYSIS AND PRIORITIZING RISK MINIMIZING TECHNIQUES OF IT PROJECTS
ANALYSIS AND PRIORITIZING RISK MINIMIZING TECHNIQUES OF IT PROJECTS
This article is devoted to the risk analysis of IT projects. The article defines the risks of IT projects, classifies the key risks of IT projects and identifies the main sources o...

Back to Top