Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Integrity Management of Hydrocarbon Riser Caisson System

View through CrossRef
Abstract The major design consideration for the hydrocarbon caisson is to protect the risers against external impact from supply vessels, intervention vessels etc. It also protects the riser from hydrodynamic loading and corrosion but in contrary makes the inspection of the riser external and caisson internal wall difficult. A hydrocarbon riser caisson represents a safety critical item of an offshore platform installation. The major threat of loss of riser caisson integrity cannot be over emphasised. Loss of containment could be as a result of corrosion of the riser external and the caisson internal if the caisson annulus is not well managed. The corrosion process will gradually reduce the wall thickness of the riser until failure resulting from pressure build-up of hydrocarbon within the caisson annulus. The likelihood of caisson failure is increased if the caisson itself has suffered from internal or external corrosion. This paper will describe the processes involved in managing the integrity of riser caissons/j-tubes as highlighted by the failure of a gas lift riser located within a hydrocarbon caisson. A study of the associated riser Caissons is presented highlighting the basic approach taken for the integrity review/re-assessment of all the remaining hydrocarbon riser caisson facilities within the North Sea field complex. The integrity review process applied, involved the detailed review of the general arrangement of the system, the design intent, the current integrity management status and the integrity management requirements for the riser caissons. A risk based inspection approach could then be used to generate an integrity management plan based on the current integrity management strategy developed. In this way further loss of hydrocarbon containment issues, with their associated risk and cost within the field complex, could be prevented.
Title: Integrity Management of Hydrocarbon Riser Caisson System
Description:
Abstract The major design consideration for the hydrocarbon caisson is to protect the risers against external impact from supply vessels, intervention vessels etc.
It also protects the riser from hydrodynamic loading and corrosion but in contrary makes the inspection of the riser external and caisson internal wall difficult.
A hydrocarbon riser caisson represents a safety critical item of an offshore platform installation.
The major threat of loss of riser caisson integrity cannot be over emphasised.
Loss of containment could be as a result of corrosion of the riser external and the caisson internal if the caisson annulus is not well managed.
The corrosion process will gradually reduce the wall thickness of the riser until failure resulting from pressure build-up of hydrocarbon within the caisson annulus.
The likelihood of caisson failure is increased if the caisson itself has suffered from internal or external corrosion.
This paper will describe the processes involved in managing the integrity of riser caissons/j-tubes as highlighted by the failure of a gas lift riser located within a hydrocarbon caisson.
A study of the associated riser Caissons is presented highlighting the basic approach taken for the integrity review/re-assessment of all the remaining hydrocarbon riser caisson facilities within the North Sea field complex.
The integrity review process applied, involved the detailed review of the general arrangement of the system, the design intent, the current integrity management status and the integrity management requirements for the riser caissons.
A risk based inspection approach could then be used to generate an integrity management plan based on the current integrity management strategy developed.
In this way further loss of hydrocarbon containment issues, with their associated risk and cost within the field complex, could be prevented.

Related Results

Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Abstract As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitatio...
The Dorada Field Production Risers
The Dorada Field Production Risers
Abstract The Dorada Field floating production system, located offshore Spain in 310 ft of water in the Mediterranean Sea, utilizes three individual production ris...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
ABSTRACT This paper presents a feasibility study for design of a spar with Top-Tensioned Production Risers (TTRs) in 10,000 ft water depth. The study was sponsore...
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
Abstract In the May of 2006, the three flexible risers of the FPSO " Nanhai Shengli?? at the Liuhua oil field in South China Sea were broken and dropped into seab...

Back to Top