Integrity Management of Hydrocarbon Riser Caisson System
View through CrossRef
Abstract
The major design consideration for the hydrocarbon caisson is to protect the risers against external impact from supply vessels, intervention vessels etc. It also protects the riser from hydrodynamic loading and corrosion but in contrary makes the inspection of the riser external and caisson internal wall difficult.
A hydrocarbon riser caisson represents a safety critical item of an offshore platform installation. The major threat of loss of riser caisson integrity cannot be over emphasised. Loss of containment could be as a result of corrosion of the riser external and the caisson internal if the caisson annulus is not well managed. The corrosion process will gradually reduce the wall thickness of the riser until failure resulting from pressure build-up of hydrocarbon within the caisson annulus. The likelihood of caisson failure is increased if the caisson itself has suffered from internal or external corrosion.
This paper will describe the processes involved in managing the integrity of riser caissons/j-tubes as highlighted by the failure of a gas lift riser located within a hydrocarbon caisson. A study of the associated riser Caissons is presented highlighting the basic approach taken for the integrity review/re-assessment of all the remaining hydrocarbon riser caisson facilities within the North Sea field complex. The integrity review process applied, involved the detailed review of the general arrangement of the system, the design intent, the current integrity management status and the integrity management requirements for the riser caissons.
A risk based inspection approach could then be used to generate an integrity management plan based on the current integrity management strategy developed. In this way further loss of hydrocarbon containment issues, with their associated risk and cost within the field complex, could be prevented.
Title: Integrity Management of Hydrocarbon Riser Caisson System
Description:
Abstract
The major design consideration for the hydrocarbon caisson is to protect the risers against external impact from supply vessels, intervention vessels etc.
It also protects the riser from hydrodynamic loading and corrosion but in contrary makes the inspection of the riser external and caisson internal wall difficult.
A hydrocarbon riser caisson represents a safety critical item of an offshore platform installation.
The major threat of loss of riser caisson integrity cannot be over emphasised.
Loss of containment could be as a result of corrosion of the riser external and the caisson internal if the caisson annulus is not well managed.
The corrosion process will gradually reduce the wall thickness of the riser until failure resulting from pressure build-up of hydrocarbon within the caisson annulus.
The likelihood of caisson failure is increased if the caisson itself has suffered from internal or external corrosion.
This paper will describe the processes involved in managing the integrity of riser caissons/j-tubes as highlighted by the failure of a gas lift riser located within a hydrocarbon caisson.
A study of the associated riser Caissons is presented highlighting the basic approach taken for the integrity review/re-assessment of all the remaining hydrocarbon riser caisson facilities within the North Sea field complex.
The integrity review process applied, involved the detailed review of the general arrangement of the system, the design intent, the current integrity management status and the integrity management requirements for the riser caissons.
A risk based inspection approach could then be used to generate an integrity management plan based on the current integrity management strategy developed.
In this way further loss of hydrocarbon containment issues, with their associated risk and cost within the field complex, could be prevented.
Related Results
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract
Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Abstract
The world's demand for metal is rising and new solutions must be explored to meet the needs associated with population growth, urbanization, decarbonized en...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT
Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract
The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
Abstract
As part of the Norwegian Deepwater Programme (NDP) a state of the art review was carried out by DNV to gather information on the various riser monitoring...
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Abstract
Although the possibility of a riser dropping off from its top hang-off point during installation or in service is minimal, such incident can pose significan...
Multiple Riser System for Shallow Water
Multiple Riser System for Shallow Water
Abstract
Shallow water and high wave induced ship motions create a challenging and harsh environment for flexible risers and umbilicals. Two new riser systems are...
Research on Ground Deformation Induced by Large Caisson Construction at the Zhuchong Pumping Station in Xinyang, China
Research on Ground Deformation Induced by Large Caisson Construction at the Zhuchong Pumping Station in Xinyang, China
Abstract
To explore the sidewall friction mechanism between sidewall of caisson and strata, thereby controlling the sinking of caisson project and induced surrounding subsi...