Possible Missing Link in CO2 Corrosion Prediction

View through CrossRef
Abstract CO2 corrosion prediction models predict a general corrosion rate, but field failures are due to localised CO2 corrosion. That is why predicted corrosion rates are correlated to a corrosivity level. These models generally consider that the corrosion rate remains, after the initiation period, unchanged as long as operating and/or production parameters remain unchanged. However, 25 years of field experience and also some recent research results confirmed that after an initial phase of high corrosion rates, the CO2 corrosion rates may significantly decrease with time forming flat-bottom large corrosion features (mesa corrosion) and stabilise. Depending on the corrosivity level the time needed for the stabilisation would be up to about 12 months. To be noted that the stabilization has been known since 2003-2004. It was first used in 2005 for the development of two gas fields with success. In 2008, it was used for the prediction of the remaining life of gas pipelines transporting very corrosive wet gas. The use of costly CRA / cladded pipes was avoided. Gunaltun Y. and call. made the first publication about the importance of the stabilization on the remaining pipeline service life in 2009. Then, possible mechanisms of stabilization were published by Gunaltun Y. in 2012 and Gunaltun Y. and call. 2013. In the present paper the field experience, the research results and the mechanisms leading to stabilisation are discussed in detail and summarised. The main driving force is the galvanic action between anodic and cathodic zones. The clustering of corrosion features completes the process of stabilisation. Re-initiation of corrosion, after stabilisation, has not been observed neither in the laboratory nor in field. The reasons why stabilisation is a non-reversible process are also explained in detail. The conclusions are integrated in the general understanding of CO2 corrosion mechanism. Then a new method is proposed to complete the corrosion prediction approaches used by the industry. Even though some research is still needed to validate the impact of some parameters involved in the stabilisation process, the stabilisation concept is now mature enough for including it in the prediction models. It is very likely that stabilisation is one of the missing links in CO2 corrosion prediction chain.
Title: Possible Missing Link in CO2 Corrosion Prediction
Description:
Abstract CO2 corrosion prediction models predict a general corrosion rate, but field failures are due to localised CO2 corrosion.
That is why predicted corrosion rates are correlated to a corrosivity level.
These models generally consider that the corrosion rate remains, after the initiation period, unchanged as long as operating and/or production parameters remain unchanged.
However, 25 years of field experience and also some recent research results confirmed that after an initial phase of high corrosion rates, the CO2 corrosion rates may significantly decrease with time forming flat-bottom large corrosion features (mesa corrosion) and stabilise.
Depending on the corrosivity level the time needed for the stabilisation would be up to about 12 months.
To be noted that the stabilization has been known since 2003-2004.
It was first used in 2005 for the development of two gas fields with success.
In 2008, it was used for the prediction of the remaining life of gas pipelines transporting very corrosive wet gas.
The use of costly CRA / cladded pipes was avoided.
Gunaltun Y.
and call.
made the first publication about the importance of the stabilization on the remaining pipeline service life in 2009.
Then, possible mechanisms of stabilization were published by Gunaltun Y.
in 2012 and Gunaltun Y.
and call.
2013.
In the present paper the field experience, the research results and the mechanisms leading to stabilisation are discussed in detail and summarised.
The main driving force is the galvanic action between anodic and cathodic zones.
The clustering of corrosion features completes the process of stabilisation.
Re-initiation of corrosion, after stabilisation, has not been observed neither in the laboratory nor in field.
The reasons why stabilisation is a non-reversible process are also explained in detail.
The conclusions are integrated in the general understanding of CO2 corrosion mechanism.
Then a new method is proposed to complete the corrosion prediction approaches used by the industry.
Even though some research is still needed to validate the impact of some parameters involved in the stabilisation process, the stabilisation concept is now mature enough for including it in the prediction models.
It is very likely that stabilisation is one of the missing links in CO2 corrosion prediction chain.

Related Results

Design And Operation Of The Levelland Unit CO2 Injection Facility
Design And Operation Of The Levelland Unit CO2 Injection Facility
Abstract The Levelland CO2 Facility provides CO2 storageand handling capacity for the five CO2 injection pilots located in the Levelland Unit. Facilities pilots l...
Rapid Large-scale Trapping of CO2 via Dissolution in US Natural CO2 Reservoirs
Rapid Large-scale Trapping of CO2 via Dissolution in US Natural CO2 Reservoirs
Naturally occurring CO2 reservoirs across the USA are critical natural analogues of long-term CO2 storage in the subsurface over geological timescales and provide valuable insights...
Spectral Analysis Of CO2 Corrosion Product Scales On 13Cr Tubing Steel
Spectral Analysis Of CO2 Corrosion Product Scales On 13Cr Tubing Steel
Abstract CO2 corrosion product scales formed on 13Cr tubing steel in autoclave and in the simulated corrosion environment of oil field are investigated in the pap...
/r/philosophy 2016-2017 AMA Series Recap + Survey!
/r/philosophy 2016-2017 AMA Series Recap + Survey!
This past academic year the moderators of /r/philosophy organised an ongoing AMA series with 18 different philosophers working on a variety of different topics, from metaphysics to...
Corrosion Of Copper-Base Alloys In A Geothermal Brine
Corrosion Of Copper-Base Alloys In A Geothermal Brine
Abstract The geothermal environment and the experimental procedures and schedules for corrosion tests of copper-base procedures and schedules for corrosion tests ...
Impact of CCUS Impurities on Dense Phase CO2 Pipeline Surface Engineering Design
Impact of CCUS Impurities on Dense Phase CO2 Pipeline Surface Engineering Design
Abstract Numerous CO2 injection pipeline applications have been developed and implemented in the past decades in the UAE and all around the globe. Transporting the C...
Evaluation of Kaolinite and activated carbon performance for CO2 capture
Evaluation of Kaolinite and activated carbon performance for CO2 capture
Global climate change is one of the major threats facing the world today and can be due to increased atmospheric concentrations of greenhouse gases (GHGs), such as carbon dioxide (...
Study on Corrosion Law and Corrosion Life Prediction of Tubular String in CO2 Huff and Puff Well
Study on Corrosion Law and Corrosion Life Prediction of Tubular String in CO2 Huff and Puff Well
Abstract Taking into account the process characteristics of CO2 injection wells, which involve low-temperature injection, long-term sealing, rapid depressurizatio...