Troika Hardpipe Jumper System

View through CrossRef
Abstract The well, flowline, and midline hardpipe jumpers utilized for the Troika subsea production system represent a significant and challenging engineering and construction effort. The system was designed using a horizontal connection method, which is common to all three jumper types. Each of the two 10–3/4 in. OD flowline jumpers that connect the flowlines to the cluster manifold system incorporates a load-limiting joint. Additionally, the flowline and midline jumpers have to allow for significant thermal elongation of the flowlines. The 5-9/16 in. OD well jumpers used to connect the subsea trees to the manifold include not only a production conduit, but hydraulic and chemical injection lines. The production pipe is also insulated. The effect of vortex-induced vibration (VIV), insulation design, flexibility, and rig installation of the jumpers will also be discussed. Introduction The Troika subsea production system is a cluster-type development in 2,700 ft of water in Green Canyon Block 200 in the Gulf of Mexico.1 The manifold is tied-back to and controlled from Shell's Bullwinkle platform, which is approximately 14 miles to the northwest. The two are tied together by means of two 10-3/4 in. OD flowlines and separate hydraulic and electrical umbilicals (Fig. 1). The two flowlines, were installed as a four-part towed bundle.2 Each section is approximately seven miles long. The four flowline sections were connected approximately at the midway point with the midline jumpers. The decision was made to utilize the GC-200 #1 delineation well previously drilled by Marathon, so the template/manifold would have to be located so as to allow completion and connection of that well to one of the system's eight slots. Since the GC-200 #1 well did not encounter any shallow water flow problems, it was felt that locating the remainder of the Troika wells in close proximity to that well would maximize the probability of the same results. Well spacing was driven primarily by the desire to eliminate gyroscopic surveys of the shallow portions of the wells, thus creating the need to separate the wells and template piles enough to prevent magnetic interference. A minimum separation of fifty-five feet was needed, so the proposed well locations were set at a separation of 60 ft ± 2.5 ft. Additionally, the well locations were chosen so as to provide a clear area adjacent to the flowline end of the template/manifold for jumper connections to the flowlines, and to minimize the possibility of impacting a well if a flowline were to be snagged and pulled loose. These same considerations were given to the area adjacent to the pigging loop end of the template/manifold due to the possibility that the Troika system would be expanded into another area. This possibility was, however, given less weight in that a more restricted access corridor was preserved for the pigging loop end than for the flowline end. Common components of all three jumper types are the hub termination assembly, the hub support alignment structure (HSAS) and the jumper pipe itself (Fig. 2). The hub termination assembly contains the hub used to seal the various conduits and is manufactured from a solid forging. The well jumpers were designed using stainless steel since they were on the upstream side of the manifold corrosion inhibitor injection points.
Title: Troika Hardpipe Jumper System
Description:
Abstract The well, flowline, and midline hardpipe jumpers utilized for the Troika subsea production system represent a significant and challenging engineering and construction effort.
The system was designed using a horizontal connection method, which is common to all three jumper types.
Each of the two 10–3/4 in.
OD flowline jumpers that connect the flowlines to the cluster manifold system incorporates a load-limiting joint.
Additionally, the flowline and midline jumpers have to allow for significant thermal elongation of the flowlines.
The 5-9/16 in.
OD well jumpers used to connect the subsea trees to the manifold include not only a production conduit, but hydraulic and chemical injection lines.
The production pipe is also insulated.
The effect of vortex-induced vibration (VIV), insulation design, flexibility, and rig installation of the jumpers will also be discussed.
Introduction The Troika subsea production system is a cluster-type development in 2,700 ft of water in Green Canyon Block 200 in the Gulf of Mexico.
1 The manifold is tied-back to and controlled from Shell's Bullwinkle platform, which is approximately 14 miles to the northwest.
The two are tied together by means of two 10-3/4 in.
OD flowlines and separate hydraulic and electrical umbilicals (Fig.
1).
The two flowlines, were installed as a four-part towed bundle.
2 Each section is approximately seven miles long.
The four flowline sections were connected approximately at the midway point with the midline jumpers.
The decision was made to utilize the GC-200 #1 delineation well previously drilled by Marathon, so the template/manifold would have to be located so as to allow completion and connection of that well to one of the system's eight slots.
Since the GC-200 #1 well did not encounter any shallow water flow problems, it was felt that locating the remainder of the Troika wells in close proximity to that well would maximize the probability of the same results.
Well spacing was driven primarily by the desire to eliminate gyroscopic surveys of the shallow portions of the wells, thus creating the need to separate the wells and template piles enough to prevent magnetic interference.
A minimum separation of fifty-five feet was needed, so the proposed well locations were set at a separation of 60 ft ± 2.
5 ft.
Additionally, the well locations were chosen so as to provide a clear area adjacent to the flowline end of the template/manifold for jumper connections to the flowlines, and to minimize the possibility of impacting a well if a flowline were to be snagged and pulled loose.
These same considerations were given to the area adjacent to the pigging loop end of the template/manifold due to the possibility that the Troika system would be expanded into another area.
This possibility was, however, given less weight in that a more restricted access corridor was preserved for the pigging loop end than for the flowline end.
Common components of all three jumper types are the hub termination assembly, the hub support alignment structure (HSAS) and the jumper pipe itself (Fig.
2).
The hub termination assembly contains the hub used to seal the various conduits and is manufactured from a solid forging.
The well jumpers were designed using stainless steel since they were on the upstream side of the manifold corrosion inhibitor injection points.

Related Results

Troika Subsea Production System - An Overview
Troika Subsea Production System - An Overview
Abstract The Troika Subsea Production System is located in the Green Canyon Area of the Gulf of Mexico, 150 miles offshore and in 2700 feet of water. Featuring an...
Numerical Simulation of Pulsating Slurry Flow in a Jumper for Subsea Mining
Numerical Simulation of Pulsating Slurry Flow in a Jumper for Subsea Mining
Abstract For the design and operation of a subsea mining system, it is important to predict pressure loss due to the hydraulic transport of solid particles in the li...
Study on Large Particle Slurry Transport in Jumper for Subsea Mining
Study on Large Particle Slurry Transport in Jumper for Subsea Mining
Abstract For design and operation of subsea mining system, it is important to predict pressure loss due to the hydraulic transport of solid particles in the flexible...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
DESIGN OF PANCASILA IN TROIKA TRAINS
DESIGN OF PANCASILA IN TROIKA TRAINS
Various kinds of cases that occur in this country are caused by the lack of practice of Pancasila which is the basis of this country, ranging from various kinds of problems that oc...
Stress State in a Shaft Jumper due to Pressure at the Shock Wave Front
Stress State in a Shaft Jumper due to Pressure at the Shock Wave Front
The development of coal deposits is accompanied by the release of methane from the destroyed coal and the formation of dust-gas-air mixtures predisposed to chemical reaction, manif...
Numerical Simulation of a Jumper Conveying Slurry for Deep-Sea Mining
Numerical Simulation of a Jumper Conveying Slurry for Deep-Sea Mining
Abstract One key technology for Deep-Sea Mining is the riser system. The riser is already a field-proven technology in the Petroleum Industry. However, several diffe...

Back to Top