Evaluasi Produksi Crushing Plant Batu Andesit di PT. XYZ Pamoyanan Purwakarta
View through CrossRef
Abstract. Analysis of the performance of PT. XYZ's crushing plant on tool productivity based on parameters obtained in the field aims to find out how the tool works against the targets set by the company for later improvements so that the targets set by the company can be achieved. Several problems that occur in the crushing plant during the production process have a direct impact on the productivity of the crushing plant, a very fatal production impact is the production target that is not achieved where the current crushing plant production is 1,576.84 tons/day while the target set by the company is 1,650 tons/day. In the primary crushing stage, the results obtained are MA = 82.10%, PA = 83.72%, UA = 89.17%, EU = 74.65% and PRI = 88%. In the secondary crushing stage, MA = 86.05%, PA = 87.44%, UA = 88.56%, EU = 77.44% and PRI = 87%. Furthermore, in the secondary crushing stage 2, the results obtained are MA = 84.06%, PA = 85.58%, UA = 88.86%, EU = 76.05% and PRI = 73%. Correlation of data was performed using Simple Linear Regression and Mann-Whitney, the parameter used was the inhibition time with production. This correlation variable aims to see if the data is normally distributed or not and also to see the relationship between the constraints of time and production.
Abstrak. Analisis kinerja crushing plant PT. XYZ terhadap produktivitas alat berdasarkan parameter-parameter yang didapat di lapangan bertujuan untuk mengetahui pencapaian kinerja alat terhadap target yang ditentukan oleh perusahaan untuk nantinya akan dilakukan perbaikan-perbaikan sehingga target yang ditetapkan oleh perusahaan bisa tercapai. Beberapa masalah yang terjadi di crushing plant saat proses produksi berlangsung berdampak langsung terhadap produktivitas crushing plant tersebut, dampak yang sangat fatal adalah target produksi yang tidak tercapai dimana produksi crushing plant saat ini sebesar 1.576,84 ton/hari sedangkan target produksi yang telah ditetapkan oleh perusahaan adalah 1.650 ton/hari. Pada tahap primary crushing diperoleh hasil MA = 82,10%, PA = 83,72%, UA = 89,17%, EU = 74,65% dan PRI = 88%. Pada tahap secondary crushing dihasilkan MA = 86,05%, PA = 87,44%, UA= 88,56%, EU = 77,44% dan PRI = 87%. Selanjutnya pada tahap secondary crushing 2 diperoleh hasil MA = 84,06%, PA = 85,58%, UA = 88,86%, EU = 76,05% dan PRI = 73%. Dilakukan korelasi data menggunakan Regresi Linier Sederhana dan Mann-Whitney, parameter yang digunakan adalah waktu hambatan dengan produksi. Korelasi variabel ini bertujuan untuk melihat data tersebut berdistribusi normal atau tidak dan juga untuk melihat hubungan dari waktu hambatan dengan produksi.
Universitas Islam Bandung (Unisba)
Title: Evaluasi Produksi Crushing Plant Batu Andesit di PT. XYZ Pamoyanan Purwakarta
Description:
Abstract.
Analysis of the performance of PT.
XYZ's crushing plant on tool productivity based on parameters obtained in the field aims to find out how the tool works against the targets set by the company for later improvements so that the targets set by the company can be achieved.
Several problems that occur in the crushing plant during the production process have a direct impact on the productivity of the crushing plant, a very fatal production impact is the production target that is not achieved where the current crushing plant production is 1,576.
84 tons/day while the target set by the company is 1,650 tons/day.
In the primary crushing stage, the results obtained are MA = 82.
10%, PA = 83.
72%, UA = 89.
17%, EU = 74.
65% and PRI = 88%.
In the secondary crushing stage, MA = 86.
05%, PA = 87.
44%, UA = 88.
56%, EU = 77.
44% and PRI = 87%.
Furthermore, in the secondary crushing stage 2, the results obtained are MA = 84.
06%, PA = 85.
58%, UA = 88.
86%, EU = 76.
05% and PRI = 73%.
Correlation of data was performed using Simple Linear Regression and Mann-Whitney, the parameter used was the inhibition time with production.
This correlation variable aims to see if the data is normally distributed or not and also to see the relationship between the constraints of time and production.
Abstrak.
Analisis kinerja crushing plant PT.
XYZ terhadap produktivitas alat berdasarkan parameter-parameter yang didapat di lapangan bertujuan untuk mengetahui pencapaian kinerja alat terhadap target yang ditentukan oleh perusahaan untuk nantinya akan dilakukan perbaikan-perbaikan sehingga target yang ditetapkan oleh perusahaan bisa tercapai.
Beberapa masalah yang terjadi di crushing plant saat proses produksi berlangsung berdampak langsung terhadap produktivitas crushing plant tersebut, dampak yang sangat fatal adalah target produksi yang tidak tercapai dimana produksi crushing plant saat ini sebesar 1.
576,84 ton/hari sedangkan target produksi yang telah ditetapkan oleh perusahaan adalah 1.
650 ton/hari.
Pada tahap primary crushing diperoleh hasil MA = 82,10%, PA = 83,72%, UA = 89,17%, EU = 74,65% dan PRI = 88%.
Pada tahap secondary crushing dihasilkan MA = 86,05%, PA = 87,44%, UA= 88,56%, EU = 77,44% dan PRI = 87%.
Selanjutnya pada tahap secondary crushing 2 diperoleh hasil MA = 84,06%, PA = 85,58%, UA = 88,86%, EU = 76,05% dan PRI = 73%.
Dilakukan korelasi data menggunakan Regresi Linier Sederhana dan Mann-Whitney, parameter yang digunakan adalah waktu hambatan dengan produksi.
Korelasi variabel ini bertujuan untuk melihat data tersebut berdistribusi normal atau tidak dan juga untuk melihat hubungan dari waktu hambatan dengan produksi.
Related Results
Analisis Kinerja Crushing Plant untuk Mencapai Target Produksi 26.000 Ton per Bulan pada PT Silva Andia Utama Desa Giri Asih, Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat
Analisis Kinerja Crushing Plant untuk Mencapai Target Produksi 26.000 Ton per Bulan pada PT Silva Andia Utama Desa Giri Asih, Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat
Abstract. With the increasing intensity of development in Indonesia, especially in West Java, the need for andesite material is also increasing, therefore andesite mining companies...
Rencana Teknis Desain Crushing Plant Sirtu di CV XYZ Garut
Rencana Teknis Desain Crushing Plant Sirtu di CV XYZ Garut
Abstract. CV. XYZ is a company engaged in the mining sector with gravel and sand commodities. The company is located in Margaluyu Village, Leles District, Garut Regency, West Java ...
Development of Novel Pyrimidine Nucleosides as Potential Anticancer Agents: Synthesis, Characterization, and Invitro Evaluation against pancreatic cancer
Development of Novel Pyrimidine Nucleosides as Potential Anticancer Agents: Synthesis, Characterization, and Invitro Evaluation against pancreatic cancer
Abstract
The present study proposed modification of 5-FU by conjugation with an acyl chloride and a 5-membered heterocyclic ring to improve its invitro cytotoxicity and met...
Abstract 1825: Synthesis and biological evaluation of novel 5-FU analogs against pancreatic cancer
Abstract 1825: Synthesis and biological evaluation of novel 5-FU analogs against pancreatic cancer
Abstract
Purpose: 5-Fluorouracil (5-FU) is one of the standard chemotherapy drugs used to treat pancreatic cancer. However, treatment only extends survival modestly,...
Perancangan Model Bisnis Perusahaan Training dan Consulting PT.XYZ dengan Menggunakan Business Model Canvas
Perancangan Model Bisnis Perusahaan Training dan Consulting PT.XYZ dengan Menggunakan Business Model Canvas
PT. XYZ is a company engaged in Business Training & Consulting located in the city of Bandung. PT. XYZ was established in 2012. Currently, the company cannot achieve its annual...
BATU PUN: ARKEOLOGI DAN MITOS DAYAK LUNDAYEH DI LEMBAH KURID DI KRAYAN, NUNUKAN
BATU PUN: ARKEOLOGI DAN MITOS DAYAK LUNDAYEH DI LEMBAH KURID DI KRAYAN, NUNUKAN
Tradisi megalitik di kawasan Krayan telah berkembang seiring dengan perubahan zaman. Salah satunya adalah Batu Pun yang berada di lembah Kurid, di Nunukan. Tampaknya masyarakat Lun...
Matriks Evaluasi Risiko Penerapan IS/IT Menggunakan Standar ISO 31000:2018 (Studi Kasus: PT XYZ)
Matriks Evaluasi Risiko Penerapan IS/IT Menggunakan Standar ISO 31000:2018 (Studi Kasus: PT XYZ)
PT XYZ is one of the largest trading companies in Palembang city. PT XYZ utilizes IS/IT to support its business processes. PT XYZ uses computers, LANs, servers, supported applicati...
Rencana Penambahan Produk Crushing Plant di PT Indra Biduri Jaya Kecamatan Leles Kabupaten Garut, Provinsi Jawa Barat
Rencana Penambahan Produk Crushing Plant di PT Indra Biduri Jaya Kecamatan Leles Kabupaten Garut, Provinsi Jawa Barat
Abstract. PT Indra Biduri Jaya is a company that mines Sirtu quarry materials. The company is located in the Leles Village, Leles District, Garut Regency, West Java Province. To me...