Analysis and improvement of methods for calculating the resistance of substation earthing equipment
View through CrossRef
In this study, we analyze the results of calculating the resistance of substation earthing equipment taking operational factors into account. The resistance of a substation earthing system was estimated using both calculation (methods of equipment operating factors, generalized parameters and induced potentials) and instrumental (ammeter-voltmeter) methods. During operation, the resistance of the studied earthing system was found to increase in comparison with the rated values, thus reducing its overall efficiency. The resistance of substation earthing equipment measured experimentally by the ammeter-voltmeter method showed the relative error of the considered calculation methods to reach 48, 46.7 and 28.6%, respectively. With the purpose of increasing the calculation accuracy of earthing equipment resistance by the method of induced potentials, it was proposed to use an operating factor. Thus, during the substation operation period of 10, 10–20 and over 20 years, the resistance of the earthing system increases by 1.02–1.1 times due to corrosion. It was shown that the installation procedure and maintenance checks (conducted at least every six years) increase the resistance of earthing systems by 1.02 and 1.05 times, respectively. Lightning discharges and short-circuit currents affect the corrosion rate of earthing systems, thereby increasing their resistance by 1.01–1.03 and 1.03–1.05 times, respectively. Therefore, the operating factor value may range from 1.115 to 1.274. The use of the operating factor in calculating the resistance of an earthing system by the induced potentials method increased the overall calculation accuracy, with the relative error not exceeding 3%. This corresponds to the normative and technical requirements stipulated by the Federal Grid Company of the Unified Energy System of Russia.
Irkutsk National Research Technical University
Title: Analysis and improvement of methods for calculating the resistance of substation earthing equipment
Description:
In this study, we analyze the results of calculating the resistance of substation earthing equipment taking operational factors into account.
The resistance of a substation earthing system was estimated using both calculation (methods of equipment operating factors, generalized parameters and induced potentials) and instrumental (ammeter-voltmeter) methods.
During operation, the resistance of the studied earthing system was found to increase in comparison with the rated values, thus reducing its overall efficiency.
The resistance of substation earthing equipment measured experimentally by the ammeter-voltmeter method showed the relative error of the considered calculation methods to reach 48, 46.
7 and 28.
6%, respectively.
With the purpose of increasing the calculation accuracy of earthing equipment resistance by the method of induced potentials, it was proposed to use an operating factor.
Thus, during the substation operation period of 10, 10–20 and over 20 years, the resistance of the earthing system increases by 1.
02–1.
1 times due to corrosion.
It was shown that the installation procedure and maintenance checks (conducted at least every six years) increase the resistance of earthing systems by 1.
02 and 1.
05 times, respectively.
Lightning discharges and short-circuit currents affect the corrosion rate of earthing systems, thereby increasing their resistance by 1.
01–1.
03 and 1.
03–1.
05 times, respectively.
Therefore, the operating factor value may range from 1.
115 to 1.
274.
The use of the operating factor in calculating the resistance of an earthing system by the induced potentials method increased the overall calculation accuracy, with the relative error not exceeding 3%.
This corresponds to the normative and technical requirements stipulated by the Federal Grid Company of the Unified Energy System of Russia.
Related Results
Evolution of Antimicrobial Resistance in Community vs. Hospital-Acquired Infections
Evolution of Antimicrobial Resistance in Community vs. Hospital-Acquired Infections
Abstract
Introduction
Hospitals are high-risk environments for infections. Despite the global recognition of these pathogens, few studies compare microorganisms from community-acqu...
ANALISIS SISTEM PEMBUMIAN TOWER SALURAN TRANSMISI DARI GARDU INDUK KAPAL – GARDU INDUK GIANYAR
ANALISIS SISTEM PEMBUMIAN TOWER SALURAN TRANSMISI DARI GARDU INDUK KAPAL – GARDU INDUK GIANYAR
This study aims to improve the earthing value of transmission lines which have an earthvalue less than the standard value off SPLN No 121: 1996, namely 10 and recommend anearthing ...
FLOWER BUD REMOVAL AND EARTHING UP TIME INCREASED GROWTH AND TUBER YIELD OF POTATO AT EASTERN TIGRAY, ETHIOPIA
FLOWER BUD REMOVAL AND EARTHING UP TIME INCREASED GROWTH AND TUBER YIELD OF POTATO AT EASTERN TIGRAY, ETHIOPIA
<p class="abstrakinggris">In Ethiopia, potato is a staple food crop and source of cash income for smallholder farmers, but the national average yield in farmers’ field is low...
A research based on testing method for the whole substation cascaded in digital substation
A research based on testing method for the whole substation cascaded in digital substation
Substation as an important component of the power grid, its safe and steady operation is crucial to the power grid. After building new substation or renovating the old ones, they n...
Optimization of Earth Resistance by Investigating the Surge-Wave Response
Optimization of Earth Resistance by Investigating the Surge-Wave Response
As the number of delicate semiconductor devices in the electric equipment increases, it is
also getting more important to prohibit the surge wave from intruding the equipment. The ...
Life Cycle Cost Analysis and Optimization of Modular Substation
Life Cycle Cost Analysis and Optimization of Modular Substation
Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements. Compared with traditional ...
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Abstract
The rapid prediction of the full life cycle cost of substation has guiding significance for the construction of substation. In this paper, a substation full...
SISTEM PENTANAHAN SWITCHYARD DENGAN KISI-KISI (GRID) PADA GARDU INDUK 150 KV BANTUL
SISTEM PENTANAHAN SWITCHYARD DENGAN KISI-KISI (GRID) PADA GARDU INDUK 150 KV BANTUL
The substation has a great possibility of experiencing a hazard caused by the disturbance of lightning and overcurrent so that the current disturbance flows to the ground as a resu...