Javascript must be enabled to continue!
Research on Construction Sequence and Line Network Structure of Urban Rail Transit
View through CrossRef
Abstract
With the construction of urban subway lines, the network characteristics of subways have begun to appear. Under certain objective conditions such as capital, manpower, and material resources, the construction sequence of subway lines ought to be different, so that priority construction of lines can maximize network benefits. In order to study the time sequence of urban subway line construction and the network effect of the line, the evaluation index of urban rail transit construction time sequence based on the complex network theory is constructed. The catastrophe progression theory is applied to avoid the subjectivity of the weighting of the primary indicators. The existing lines of Xi’an Metro are transformed into the L-space topology, and the relevant network indicators are calculated to judge the network characteristics of the subway. Through the calculation of the membership degree, the construction priority of each line is finally determined. The route planned for the third phase of the Xi’an Metro is taken as an example, the calculation results show that the small-world characteristics of the Xi’an Metro network are emerging and the network is in its infancy. The calculation results of the priority of the planned line construction sequence indicate that large-scale sports meeting and events have a decisive influence on the construction sequence of the subway line.
Title: Research on Construction Sequence and Line Network Structure of Urban Rail Transit
Description:
Abstract
With the construction of urban subway lines, the network characteristics of subways have begun to appear.
Under certain objective conditions such as capital, manpower, and material resources, the construction sequence of subway lines ought to be different, so that priority construction of lines can maximize network benefits.
In order to study the time sequence of urban subway line construction and the network effect of the line, the evaluation index of urban rail transit construction time sequence based on the complex network theory is constructed.
The catastrophe progression theory is applied to avoid the subjectivity of the weighting of the primary indicators.
The existing lines of Xi’an Metro are transformed into the L-space topology, and the relevant network indicators are calculated to judge the network characteristics of the subway.
Through the calculation of the membership degree, the construction priority of each line is finally determined.
The route planned for the third phase of the Xi’an Metro is taken as an example, the calculation results show that the small-world characteristics of the Xi’an Metro network are emerging and the network is in its infancy.
The calculation results of the priority of the planned line construction sequence indicate that large-scale sports meeting and events have a decisive influence on the construction sequence of the subway line.
Related Results
Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition is the driving force of any economic system, as it creates a challenging environment for service suppliers to provide affordable and reliable services to customers. Rai...
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
The increasing of traffic and operation speed in urban transits has accelerated the degradation of track components. Rail wear, especially extended side wear of the high rail on sh...
Research on 5G Key Technologies and Applications in Urban Rail Transit
Research on 5G Key Technologies and Applications in Urban Rail Transit
With the rapid development of science and technology, Chinese urban rail transit
has entered a newstage of intelligent development from the stage of rapid construction....
Design of Flangeway Gap for Restraining Rail
Design of Flangeway Gap for Restraining Rail
The aim of the paper is to classify restraining rail, discuss the advantages and disadvantages of each type of restraining rail, derive the formula to determine the flangeway gap, ...
Towards a Better Understanding of the Rail Grinding Mechanism
Towards a Better Understanding of the Rail Grinding Mechanism
Rail grinding continues to be one of the most effective techniques for extending rail life, improving wheel/rail contact behavior, and reducing the overall cost of track maintenanc...
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
<p>The Toronto Transit Commission (TTC), Toronto’s transit service provider, currently has 3 lines of rapid transit service intended for continued operation, and 4 new rapid ...
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
<p>The Toronto Transit Commission (TTC), Toronto’s transit service provider, currently has 3 lines of rapid transit service intended for continued operation, and 4 new rapid ...
Multi-objective cost optimization for geological risk oriented rail transit route selection
Multi-objective cost optimization for geological risk oriented rail transit route selection
Abstract
China’s rail transit has entered a period of rapid development, but related safety and risk management fail to match with high-speed construction. The compl...

