Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Exploring the Enhancement of Rigless Deployed ESP Technology for Ad-Interim Production

View through CrossRef
Abstract The electrical submersible pump (ESP) change-out using the workover rig contributes to significantly deferred production, including waiting for rig availability, wellsite preparation, and rig mobilization. Finding an alternative ESP deployment method to minimize the deferred production associated with ESP failure is always prioritized during peak global oil demand. This paper focuses on the lessons learned from a temporary slim cable deployed ESP field trial installed for the Ad interim production application. A temporary thru-tubing ESP deployment concept was adopted to allow producing the well until mobilizing the workover rig to replace the failed permanent ESP. The slim cable deployed ESP system uses an inverted high-speed ESP architecture, and the permanent magnet motor offers a broader ESPs operating range and operational flexibility. The compact design simplifies the ESP installation using a standard slickline operation and well-control procedure. The slim cable deployed ESP system was successfully installed thru 4-1/2-inch tubing above the failed ESP. The system's performance was observed during the field trial period, including fully rigless deployment capability in a live well, ESP operational flexibility, and well control guidelines.
Title: Exploring the Enhancement of Rigless Deployed ESP Technology for Ad-Interim Production
Description:
Abstract The electrical submersible pump (ESP) change-out using the workover rig contributes to significantly deferred production, including waiting for rig availability, wellsite preparation, and rig mobilization.
Finding an alternative ESP deployment method to minimize the deferred production associated with ESP failure is always prioritized during peak global oil demand.
This paper focuses on the lessons learned from a temporary slim cable deployed ESP field trial installed for the Ad interim production application.
A temporary thru-tubing ESP deployment concept was adopted to allow producing the well until mobilizing the workover rig to replace the failed permanent ESP.
The slim cable deployed ESP system uses an inverted high-speed ESP architecture, and the permanent magnet motor offers a broader ESPs operating range and operational flexibility.
The compact design simplifies the ESP installation using a standard slickline operation and well-control procedure.
The slim cable deployed ESP system was successfully installed thru 4-1/2-inch tubing above the failed ESP.
The system's performance was observed during the field trial period, including fully rigless deployment capability in a live well, ESP operational flexibility, and well control guidelines.

Related Results

Shifting Focus to Electrical Submersible Pump (ESP) Technology to Enhance Well Productivity and Recovery in Malaysia Fields
Shifting Focus to Electrical Submersible Pump (ESP) Technology to Enhance Well Productivity and Recovery in Malaysia Fields
Abstract More than 50% of Malaysia fields are matured or at its late life stage. These fields are mostly highly dependent on gas lift as the artificial lift method t...
A Novel Approach Utilizing Dual String with ESP System to Enable Gas Separator Configuration with Downhole Packers
A Novel Approach Utilizing Dual String with ESP System to Enable Gas Separator Configuration with Downhole Packers
Abstract The utilization of electrical submersible pumps (ESP) in oil production has been established in the energy industry. Many factors play major roles in select...
Production Optimization in Bonga Deepwater Through Rigless Intervention
Production Optimization in Bonga Deepwater Through Rigless Intervention
Abstract Maximizing oil recovery and production remains paramount in Deepwater operations. This paper focuses on enhanced oil recovery and production optimization in...
ESP Economics as Applied to the Offshore Environment
ESP Economics as Applied to the Offshore Environment
Abstract Electric submersible pump (ESP) economics include capital expenditures (CAPEX) and operating expenditures (OPEX). Because workover rig and associated cos...
Harsh Environment ESP System
Harsh Environment ESP System
Objective/Scope When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than t...
High Rate Slim ESP Viability Assessment in the Field
High Rate Slim ESP Viability Assessment in the Field
Abstract Producing oil at full potential with an electrical submersible pump (ESP) in a slim well remains a challenge in the petroleum industry. A conventional slim ...
Proactive Utilization of ESP Performance Monitoring to Enhance Productivity
Proactive Utilization of ESP Performance Monitoring to Enhance Productivity
Abstract As the electric submersible pump (ESP) population increases, the requirement for continuous operation is required to ensure optimum oil sweep rather than de...
[RETRACTED] Gro-X Male Enhancement | Safely Grow Your Size, Sex Drive v1
[RETRACTED] Gro-X Male Enhancement | Safely Grow Your Size, Sex Drive v1
[RETRACTED]Gro-X Male Enhancement Reviews - Is It Worth the Money? Scam or Legit? Gro-X Male Enhancement Male health is very important, especially for a couple. Low sperm count an...

Back to Top