Javascript must be enabled to continue!
Analysis and Application of Optimal and Fast Drilling Technology in Gaoshangpu Block of Jidong Oilfield
View through CrossRef
Abstract
The Gaoshangpu block of Jidong Oilfield is a hot block for increasing production and storage in Jidong Oilfield. High-quality and efficient drilling and completion can shorten the operation time and have huge economic and social benefits. Aiming at the problems of large well depth, complex geological conditions, poor stratum drillability, low drilling machinery efficiency, and long drilling cycle in the Gaoshangpu block of Jidong Oilfield, this paper optimizes its drill bits, speed-up tools, drilling parameters, and drilling fluid performance. Through bit optimization, a PDC bit optimization template is formed. A single S1942 PDC and BTM159AR PDC bit can solve the problem of poor formation drillability, improve drilling efficiency, shorten completion time and optimize speed-up tools in the study area. For glutenite developed stratum (bottom of Guantao Formation), we use shock-absorbing thruster, and for gray mudstone (Shahejie Formation), we use shock-absorbing thruster + curved screw. 1% organic silicon polymer can be added to the three-open drilling fluid to improve the drilling fluid performance. The adding of the compound (PLH: KPAM: ammonium salt = 1: 1: 2) can inhibit mud making, and the 2% anti-collapse agent before drilling into basalt can solve the well wall collapse of Shahejie Formation and Guantao Formation. The liquid with density of 1.44-1.45 can prevent well overflow. The research results provide guidance for high-quality and efficient drilling in the Gaoshangpu block of Jidong Oilfield and ensure the safety of drilling operations.
Title: Analysis and Application of Optimal and Fast Drilling Technology in Gaoshangpu Block of Jidong Oilfield
Description:
Abstract
The Gaoshangpu block of Jidong Oilfield is a hot block for increasing production and storage in Jidong Oilfield.
High-quality and efficient drilling and completion can shorten the operation time and have huge economic and social benefits.
Aiming at the problems of large well depth, complex geological conditions, poor stratum drillability, low drilling machinery efficiency, and long drilling cycle in the Gaoshangpu block of Jidong Oilfield, this paper optimizes its drill bits, speed-up tools, drilling parameters, and drilling fluid performance.
Through bit optimization, a PDC bit optimization template is formed.
A single S1942 PDC and BTM159AR PDC bit can solve the problem of poor formation drillability, improve drilling efficiency, shorten completion time and optimize speed-up tools in the study area.
For glutenite developed stratum (bottom of Guantao Formation), we use shock-absorbing thruster, and for gray mudstone (Shahejie Formation), we use shock-absorbing thruster + curved screw.
1% organic silicon polymer can be added to the three-open drilling fluid to improve the drilling fluid performance.
The adding of the compound (PLH: KPAM: ammonium salt = 1: 1: 2) can inhibit mud making, and the 2% anti-collapse agent before drilling into basalt can solve the well wall collapse of Shahejie Formation and Guantao Formation.
The liquid with density of 1.
44-1.
45 can prevent well overflow.
The research results provide guidance for high-quality and efficient drilling in the Gaoshangpu block of Jidong Oilfield and ensure the safety of drilling operations.
Related Results
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Abstract
Due to high temperature, high pressure, and gypsum-salt formations in the Tian Mountain Front Block in Tarim Basin, the stability and rheology of traditiona...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract
Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Cluster Drilling Technology in Damintun Oil Field
Cluster Drilling Technology in Damintun Oil Field
ABSTRACT
The cluster drilling technology, as an important part of development and construction of Damintun high pour point oilfield, plays a significant role. It has...
Study of the Wellbore Instability Mechanism of Shale in the Jidong Oilfield under the Action of Fluid
Study of the Wellbore Instability Mechanism of Shale in the Jidong Oilfield under the Action of Fluid
Wellbore instability is the primary technical problem that restricts the low-cost drilling of long-interval horizontal wells in the shale formation of the Jidong Oilfield. Based on...
Application of Comprehensive Harmless Waste Treatment Technology to Treat Drilling Cuttings in the Tian Mountain Front Block in Tarim Basin
Application of Comprehensive Harmless Waste Treatment Technology to Treat Drilling Cuttings in the Tian Mountain Front Block in Tarim Basin
Abstract
Due to high temperature, high pressure, and gypsum-salt formation, the stability and rheology of conventional polymer drilling fluids are difficult to maint...
The First Application of Whole Process Underbalanced Drilling in Ultradeep Horizontal Well in Tarim Oilfield
The First Application of Whole Process Underbalanced Drilling in Ultradeep Horizontal Well in Tarim Oilfield
Abstract
In Tarim Oilfield the Ordovician carbonate reservoirs develop lots of cracks and caves. The formation pressure is very low(>6000m, less than65MPa), l...

