Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

A New All Electric Subsea Control System Development

View through CrossRef
Abstract Over the past few years a specific programme has focused on the development of subsea separators and a subsea water treatment and injection process composed of several modules and requiring a certain amount of new subsea technology (subsea barrier fluid-less water injection pumps, filters, special water analyzers, etc.). One of these technologies is the all-electric subsea control system. The all-electric versus the electro-hydraulic solution was selected for its inherent capability to:enable long step-out distances;run logics such as sequences and fast closed control loops involving subsea proportional valves;handle high frequency of simultaneous valve actuations;implement safety functions, including SIL certified, when required. Within the ongoing industrialization programme of the new technologies, a Joint Development Agreement has been put in place between two partners for the qualification of the open framework platform for the control of subsea processes. The development is pursued according to the API 17N and DNV RP-A203 requirements. The subsea control system is developed according to the approach to interface standardization, which is aimed at guaranteeing:–the interchangeability of modules coming from different vendors;–the reduction of physical interfaces;–the optimization of IMR intervention time. The technology mainly consists of:a qualified basic component platform to be used for project-based assembly;a complete set of tools such as web-server, condition monitoring server, integrated software development environment, etc.;a standard and user-friendly approach for software application development, based on P&ID graphic, in order to facilitate the sharing of software information between contractor and clients;standard industrial communication protocols (no proprietary protocols) accessible to all users, which are designed for easy interfacing of the control system with third party equipment. The JDA activity has concluded the Q1 qualification tests of electronic components and Q2 tests of electronic assemblies, pursuant to API 17F, as well as all the other qualification activities (tests and analyses) relevant to the non-electronic components (e.g. 40kVA subsea electrical transformer), according to the relevant technology qualification plan. Additional software packages have also been developed and successfully tested using the Test Driven Development (TDD) method. The qualification will be completed by Q1 2019 with integration tests of:–Topside Control System;–Subsea Power and Communication Distribution Manager;–Subsea Control Unit. The integration tests will allow to reach TRL 4 of the above subsea equipment, in accordance with API 17N.
Title: A New All Electric Subsea Control System Development
Description:
Abstract Over the past few years a specific programme has focused on the development of subsea separators and a subsea water treatment and injection process composed of several modules and requiring a certain amount of new subsea technology (subsea barrier fluid-less water injection pumps, filters, special water analyzers, etc.
).
One of these technologies is the all-electric subsea control system.
The all-electric versus the electro-hydraulic solution was selected for its inherent capability to:enable long step-out distances;run logics such as sequences and fast closed control loops involving subsea proportional valves;handle high frequency of simultaneous valve actuations;implement safety functions, including SIL certified, when required.
Within the ongoing industrialization programme of the new technologies, a Joint Development Agreement has been put in place between two partners for the qualification of the open framework platform for the control of subsea processes.
The development is pursued according to the API 17N and DNV RP-A203 requirements.
The subsea control system is developed according to the approach to interface standardization, which is aimed at guaranteeing:–the interchangeability of modules coming from different vendors;–the reduction of physical interfaces;–the optimization of IMR intervention time.
The technology mainly consists of:a qualified basic component platform to be used for project-based assembly;a complete set of tools such as web-server, condition monitoring server, integrated software development environment, etc.
;a standard and user-friendly approach for software application development, based on P&ID graphic, in order to facilitate the sharing of software information between contractor and clients;standard industrial communication protocols (no proprietary protocols) accessible to all users, which are designed for easy interfacing of the control system with third party equipment.
The JDA activity has concluded the Q1 qualification tests of electronic components and Q2 tests of electronic assemblies, pursuant to API 17F, as well as all the other qualification activities (tests and analyses) relevant to the non-electronic components (e.
g.
40kVA subsea electrical transformer), according to the relevant technology qualification plan.
Additional software packages have also been developed and successfully tested using the Test Driven Development (TDD) method.
The qualification will be completed by Q1 2019 with integration tests of:–Topside Control System;–Subsea Power and Communication Distribution Manager;–Subsea Control Unit.
The integration tests will allow to reach TRL 4 of the above subsea equipment, in accordance with API 17N.

Related Results

Subsea HIPPS Design Procedure
Subsea HIPPS Design Procedure
ABSTRACT The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subse...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Simple Subsea Trees for Shallow Water: An Economical Alternative
Simple Subsea Trees for Shallow Water: An Economical Alternative
Abstract Simple, diver assisted subsea completions have been installed and operated successfully in many shallow water oil fields around the world. Although these...
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Abstract Subsea conductors are the foundational elements of offshore drilling operations, serving a dual purpose as both the structural framework and the main condui...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
In a cost constrained scenario, technology driven solutions aiming at CAPEX reductions are crucial to make Subsea Processing (SSP) projects economically attractive. Subsea Processi...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...

Back to Top