Identifikasi Waste pada Proses Remanufaktur Blade Lift Cylinder D-8R dengan Pendekatan Lean Manufacturing

View through CrossRef
Intisari— Blade Lift Cylinder D-8R merupakan salah satu komponen hidrolik alat berat. Dampak dari banyaknya remanufaktur terhadap komponen blade lift cylinder D-8R ini menyebabkan leadtime pengiriman ke pelanggan menjadi lama. Hal ini akhirnya merugikan perusahaan dan juga pelanggan secara tidak langsung. Kajian awal mengungkapkan bahwa leadtime disebabkan oleh jumlah pemborosan (waste) pada proses produksi komponen blade lift cylinderD-8R. Adapun anlaisis terhadap pemborosan pada proses remanufaktur blade lift cylinder D-8R dapat menjadi strategi pilihan. Pada penelitian ini menggunakan lean manufacturing sebagai pendekatan analisis 7 pemborosan. Hasil penelitian menunjukan nilai Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) sebesar 30,4%, kemudian nilai PCE pada kondisi perbaikan Future Stream Mapping (FVSM) meningkat menjadi 84,6%. Dari hasil ini dapat diketahui adanya kenaikan sebesar 54,2%. Penurunan leadtime remanufaktur blade lift cylinder D-8R sekitar 10406 menit atau sekitar 63,9%. Dengan demikian, Pemborosan pada proses remanufaktur komponen blade lift cylinder D-8R dengan pendekatan Lean Manufacturing dapat diidentifikasi dan leadtime menurun lebih dari separuh leadtime pada kondisi awal. Abstract— Blade Lift Cylinder D-8R is one of the hydraulic components of heavy equipment. The impact of the many remanufacturing of the blade lift cylinder components of the D-8R causes long lead times for delivery to customers. This ultimately harms the company and also the customers indirectly. Preliminary studies reveal that leadtime is caused by the amount of waste in the production process of the blade lift cylinderD-8R component. The analysis of waste in the remanufacturing process of the D-8R blade lift cylinder can be the strategy of choice. In this study, lean manufacturing is used as a waste analysis approach. The results showed that the Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) was 30.4%, then the PCE value in the improved condition of Future Stream Mapping (FVSM) increased to 84.6%. From these results, it can be seen that there was an increase of 54.2%. The decrease in leadtime for remanufacturing the blade lift cylinder of the D-8R is about 10406 ​​minutes or about 63.9%. Thus, waste in the remanufacturing process of the blade lift cylinder component of the D-8R with the Lean Manufacturing approach can be identified and leadtime is reduced by more than half of the leadtime in the initial condition.
Title: Identifikasi Waste pada Proses Remanufaktur Blade Lift Cylinder D-8R dengan Pendekatan Lean Manufacturing
Description:
Intisari— Blade Lift Cylinder D-8R merupakan salah satu komponen hidrolik alat berat.
Dampak dari banyaknya remanufaktur terhadap komponen blade lift cylinder D-8R ini menyebabkan leadtime pengiriman ke pelanggan menjadi lama.
Hal ini akhirnya merugikan perusahaan dan juga pelanggan secara tidak langsung.
Kajian awal mengungkapkan bahwa leadtime disebabkan oleh jumlah pemborosan (waste) pada proses produksi komponen blade lift cylinderD-8R.
Adapun anlaisis terhadap pemborosan pada proses remanufaktur blade lift cylinder D-8R dapat menjadi strategi pilihan.
Pada penelitian ini menggunakan lean manufacturing sebagai pendekatan analisis 7 pemborosan.
Hasil penelitian menunjukan nilai Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) sebesar 30,4%, kemudian nilai PCE pada kondisi perbaikan Future Stream Mapping (FVSM) meningkat menjadi 84,6%.
Dari hasil ini dapat diketahui adanya kenaikan sebesar 54,2%.
Penurunan leadtime remanufaktur blade lift cylinder D-8R sekitar 10406 menit atau sekitar 63,9%.
Dengan demikian, Pemborosan pada proses remanufaktur komponen blade lift cylinder D-8R dengan pendekatan Lean Manufacturing dapat diidentifikasi dan leadtime menurun lebih dari separuh leadtime pada kondisi awal.
Abstract— Blade Lift Cylinder D-8R is one of the hydraulic components of heavy equipment.
The impact of the many remanufacturing of the blade lift cylinder components of the D-8R causes long lead times for delivery to customers.
This ultimately harms the company and also the customers indirectly.
Preliminary studies reveal that leadtime is caused by the amount of waste in the production process of the blade lift cylinderD-8R component.
The analysis of waste in the remanufacturing process of the D-8R blade lift cylinder can be the strategy of choice.
In this study, lean manufacturing is used as a waste analysis approach.
The results showed that the Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) was 30.
4%, then the PCE value in the improved condition of Future Stream Mapping (FVSM) increased to 84.
6%.
From these results, it can be seen that there was an increase of 54.
2%.
The decrease in leadtime for remanufacturing the blade lift cylinder of the D-8R is about 10406 ​​minutes or about 63.
9%.
Thus, waste in the remanufacturing process of the blade lift cylinder component of the D-8R with the Lean Manufacturing approach can be identified and leadtime is reduced by more than half of the leadtime in the initial condition.

Related Results

[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
Perancangan Proses Remanufaktur pada Komponen Otomotif
Perancangan Proses Remanufaktur pada Komponen Otomotif
Kendaraan bermotor sebagai alat transportasi saat ini menjadi salah satu kebutuhan penting untuk manusia. Jumlah sepeda motor terus meningkat setiap tahunnya. Hal ini menyebabkan s...
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
Numerical Investigations of a Rotating Wire-Wrapped Cylinder
Numerical Investigations of a Rotating Wire-Wrapped Cylinder
Previous investigations [1–3] on the effects of rotating cylinder with either a smooth surface or cylinders with different surface geometries, placed at either the leading or the t...
Music as a framework to better understand Lean leadership
Music as a framework to better understand Lean leadership
PurposeThe purpose of this paper is to explain why most senior managers have great difficulty comprehending and correctly practising the Lean management system, thereby handicappin...
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
Textile waste is one of the 2nd largest types of waste in the world. The increasing amount of textile waste will have an impact on the environment. There has not been much developm...

Back to Top