Application of Managed Pressure Drilling on a Semisubmersible Tender-Assisted Rig to Address Drilling Challenges in HPHT Gas Condensate Wells, Offshore Vietnam
View through CrossRef
Abstract
High-pressure, high-temperature (HP/HT) environments often present kick and losses scenarios. Bien Dong POC Well-1 serves as an example of such scenarios with a very narrow-pressure operating window. Operational pressure challenges prohibited achieving the objectives.
While drilling the Bien Dong Well-1, the well encountered ballooning issues, high pore pressures, and a narrow window. As part of remedial actions when drilling Bien Dong Well-2 & Well-3, the Bien Dong POC drilling team decided to deploy MPD technology with constant bottomhole pressure and early kick-loss detection capabilities.
By applying MPD techniques, the team drilled the 12-1/4-in. hole section with the lowest possible mud weight to accommodate the narrow drilling window. Drilling the well sections to total depth (TD) took only 10 days in Well-2 and 14 days in Well-3. MPD also allowed stripping out of the hole with surface backpressure (SBP) instead of pumping out of the hole to minimize swab once in shoe, which reduced trips for considerable rig-time savings.
The wells were drilled using MPD technology on a semisubmersible tender-assisted rig. A comprehensive rig survey was conducted during the planning phase of rig construction. The survey outlined the permanent installation of the MPD system, including an automated MPD choke manifold and docking-station rotating control device (RCD). The MPD equipment was integrated into the rig on a flexible plug-and-play basis to enable easy rig up and rig down. The integration also enabled moving the equipment between wells when the rig skids and during the MPD operation. The success of MPD operations came through cooperation with team members, experience from lessons learned, and excellence in rig crew performance on well after well.
This paper will discuss how MPD technology led to campaign improvements and cost savings throughout Bien Dong Well-2 and Well-3.
Title: Application of Managed Pressure Drilling on a Semisubmersible Tender-Assisted Rig to Address Drilling Challenges in HPHT Gas Condensate Wells, Offshore Vietnam
Description:
Abstract
High-pressure, high-temperature (HP/HT) environments often present kick and losses scenarios.
Bien Dong POC Well-1 serves as an example of such scenarios with a very narrow-pressure operating window.
Operational pressure challenges prohibited achieving the objectives.
While drilling the Bien Dong Well-1, the well encountered ballooning issues, high pore pressures, and a narrow window.
As part of remedial actions when drilling Bien Dong Well-2 & Well-3, the Bien Dong POC drilling team decided to deploy MPD technology with constant bottomhole pressure and early kick-loss detection capabilities.
By applying MPD techniques, the team drilled the 12-1/4-in.
hole section with the lowest possible mud weight to accommodate the narrow drilling window.
Drilling the well sections to total depth (TD) took only 10 days in Well-2 and 14 days in Well-3.
MPD also allowed stripping out of the hole with surface backpressure (SBP) instead of pumping out of the hole to minimize swab once in shoe, which reduced trips for considerable rig-time savings.
The wells were drilled using MPD technology on a semisubmersible tender-assisted rig.
A comprehensive rig survey was conducted during the planning phase of rig construction.
The survey outlined the permanent installation of the MPD system, including an automated MPD choke manifold and docking-station rotating control device (RCD).
The MPD equipment was integrated into the rig on a flexible plug-and-play basis to enable easy rig up and rig down.
The integration also enabled moving the equipment between wells when the rig skids and during the MPD operation.
The success of MPD operations came through cooperation with team members, experience from lessons learned, and excellence in rig crew performance on well after well.
This paper will discuss how MPD technology led to campaign improvements and cost savings throughout Bien Dong Well-2 and Well-3.
Related Results
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Abstract
Serban is an offshore drilling project located in Nunukan Block, Indonesia, approximately 3 km northwest of Bunyu Island, an offshore area with very shal...
Block 61 Condensate Decline Management Strategy
Block 61 Condensate Decline Management Strategy
Abstract
Block 61 is gas field located in Southwest of Oman and is being operated by BP. Field has been on production under Exploration and Production Sharing Agreem...
Enhanced Gas-Condensate Recovery in Complex Reservoirs: Pilots and Models
Enhanced Gas-Condensate Recovery in Complex Reservoirs: Pilots and Models
Abstract
Gas injection in gas-condensate reservoirs requires reservoir studies with cumbersome and complex simulations of flow and of phase behaviour for multipha...
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
Abstract
The Bureau of Safety and Environmental Enforcement (BSEE) first published High Pressure/High Temperature (HPHT) regulations at 30 CFR 250.807 in 2010. Addit...
Boosting Condensate Recoveries of a Mature Retrograde Gas-Condensate Field in Pakistan
Boosting Condensate Recoveries of a Mature Retrograde Gas-Condensate Field in Pakistan
Abstract
One of the most challenging part of managing a Gas-Condensate reservoir is to reduce Condensate Banking and its damaging impacts on the overall recovery. Se...
Condensate Banking Characterization and Quantification of Improvement from Different Mitigations Using Pressure Transient Analysis: A Case Study in Hai Thach Field Offshore Vietnam
Condensate Banking Characterization and Quantification of Improvement from Different Mitigations Using Pressure Transient Analysis: A Case Study in Hai Thach Field Offshore Vietnam
Abstract
To successfully mitigate a near-wellbore condensate blockage, the status of the condensate blockage must be thoroughly understood. This case study proposes ...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract
This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...