Strategic Value Framing for Brownfield Redevelopment

View through CrossRef
Abstract Objectives/Scope Field A is a brownfield that has been produced for 52 years under natural depletion via a total of 207 strings. The field comprises 7000 ft of reservoir section, multiple fault blocks and over 200 separate reservoir units has been produced to date. Despite the long period of production, the field recovery factor (RF) to date is only 29%. To improve the RF, a strategic assest value framing exercise was carried out to identify the additional subsurface opportunities i.e. infill well drilling, secondary recovery, late field life appraisal in underdeveloped fault blocks as well as adopting standardized low well concepts and the design one build many facility design concept to reduce cost and accelerate development. The main purpose of the exercise was to capture the overall opportunities for the field, outline the roadmap and phase out the project with suitable wells and facilities design to bring down the cost for project commerciality. Methods, Procedures, Process The integrated workflow of the exercise involved subsurface, drilling, facilities, operations and economist and took a total of 3 months to complete. The process started off with a RF benchmarking exercise utilizing a newly developed inhouse RF benchmarking tool to compare the current attained vs the attainable RF(EUR) and identify incremental reserves. The number of new wells required to develop the incremental reserves was estimated by analyzing EUR per well trends over time. This analysis indicated that on a campaign basis the current realistic average EUR per well is in the order of 0.7-1.0 MMstb per well. The preliminary well placements are guided by bubble maps of all reservoirs, in a top to bottom & block by block approach, to identify underdeveloped areas and combining these areas into stacks of reservoirs that can be combined and developed with simpler wells from existing or future facilities. The drilling team has designed a few simple trajectories to penetrate shallower to deeper reservoirs and proposed the drilling center within a radius of 2 km from the targets. This approach differs from the object-based approach where individual high EUR targets are chased with more complex wells drilled from a specific location during a platform campaign. Result, Observations, Conclusions Potential additional reserves and 6 new projects have been identified which would result in a field recovery factor increase of 11%, of which 2 projects are being accelerated to realize early first oil. Timelines for all the projects have been mapped out with the aim of completing all within the next 10 years. A dedicated project management team has been formed to support the project from the initial stage. Detail Full Field Review study will be conducted to mature all the opportunities up to development stage. The listed projects will follow the low cost well guideline established in the framing as well as fast track facility design concept. Novel/added value The strategic value framing exercise is a systematic approach that provide a total picture of the future opportunities to optimize field production/EUR and maximize commercial value of brownfield redevelopment.
Title: Strategic Value Framing for Brownfield Redevelopment
Description:
Abstract Objectives/Scope Field A is a brownfield that has been produced for 52 years under natural depletion via a total of 207 strings.
The field comprises 7000 ft of reservoir section, multiple fault blocks and over 200 separate reservoir units has been produced to date.
Despite the long period of production, the field recovery factor (RF) to date is only 29%.
To improve the RF, a strategic assest value framing exercise was carried out to identify the additional subsurface opportunities i.
e.
infill well drilling, secondary recovery, late field life appraisal in underdeveloped fault blocks as well as adopting standardized low well concepts and the design one build many facility design concept to reduce cost and accelerate development.
The main purpose of the exercise was to capture the overall opportunities for the field, outline the roadmap and phase out the project with suitable wells and facilities design to bring down the cost for project commerciality.
Methods, Procedures, Process The integrated workflow of the exercise involved subsurface, drilling, facilities, operations and economist and took a total of 3 months to complete.
The process started off with a RF benchmarking exercise utilizing a newly developed inhouse RF benchmarking tool to compare the current attained vs the attainable RF(EUR) and identify incremental reserves.
The number of new wells required to develop the incremental reserves was estimated by analyzing EUR per well trends over time.
This analysis indicated that on a campaign basis the current realistic average EUR per well is in the order of 0.
7-1.
0 MMstb per well.
The preliminary well placements are guided by bubble maps of all reservoirs, in a top to bottom & block by block approach, to identify underdeveloped areas and combining these areas into stacks of reservoirs that can be combined and developed with simpler wells from existing or future facilities.
The drilling team has designed a few simple trajectories to penetrate shallower to deeper reservoirs and proposed the drilling center within a radius of 2 km from the targets.
This approach differs from the object-based approach where individual high EUR targets are chased with more complex wells drilled from a specific location during a platform campaign.
Result, Observations, Conclusions Potential additional reserves and 6 new projects have been identified which would result in a field recovery factor increase of 11%, of which 2 projects are being accelerated to realize early first oil.
Timelines for all the projects have been mapped out with the aim of completing all within the next 10 years.
A dedicated project management team has been formed to support the project from the initial stage.
Detail Full Field Review study will be conducted to mature all the opportunities up to development stage.
The listed projects will follow the low cost well guideline established in the framing as well as fast track facility design concept.
Novel/added value The strategic value framing exercise is a systematic approach that provide a total picture of the future opportunities to optimize field production/EUR and maximize commercial value of brownfield redevelopment.

Related Results

Suitability of Redevelopment for Brownfield Area: Case Study for Malacca City
Suitability of Redevelopment for Brownfield Area: Case Study for Malacca City
The redevelopment of brownfield areas requires special attention and research that includes various aspects as a whole. The main factor for brownfield development to be prioritised...
Analysis of the Wangping Brownfield Using a Two-Step Urban Brownfield Redevelopment Model
Analysis of the Wangping Brownfield Using a Two-Step Urban Brownfield Redevelopment Model
With societal progress, urban brownfields have become restrictive, and redevelopment studies have become an important part of urban renewal. In this work, we developed a two-step m...
Challenges in Execution of Brownfield Projects Without Production Shutdown – Case Study
Challenges in Execution of Brownfield Projects Without Production Shutdown – Case Study
Abstract Oil producing companies are targeting minimal modifications to existing facilities in an attempt to increase oil production with minimal capital investment ...
Research on brownfield redevelopment based on Wuli-Shili-Renli system theory and catastrophe progression method
Research on brownfield redevelopment based on Wuli-Shili-Renli system theory and catastrophe progression method
Brownfields are an important part of urban land resources. Strengthening the governance and redevelopment of brownfields is significant to environmental protection, high-quality ur...
Critical Success Factors in Brownfield Construction Project
Critical Success Factors in Brownfield Construction Project
ABSTRACT A minimal number of studies have explored developing the critical success factors (CSFs) in a brownfield construction project in Malaysia. This study intend...
Sustainable Empowerment as a Tool to Activate Brownfield
Sustainable Empowerment as a Tool to Activate Brownfield
The redevelopment of brownfields participate to sustainable urban development, it can make cities more valuable worth for community and more attractive for companies to settle down...

Back to Top