Free Rotating Eccentric Guide Shoe Reached TD in High Angle Well Saves ±60 Hours of Rig Time
View through CrossRef
AbstractIn the pursuit to access reserves at ever increasing departures the ability to successfully run very long casing strings in highly deviated wells is essential. Running 6200 ft. (1890 m.) long 7″ liner in a highly deviated ‘S’ shape well (80 Deg.) with high dogleg severity 15 Deg. /100 ft. across whipstock window) is considered a big challenge. The severity of this challenge increases multifold while passing the string through challenging interbedded formations.The case presented here had unique achievement that last seven days while performing extensive open-hole logging after drilling 8-½″ section and prior running the liner hanger system. Aligned with the pre-determined challenges; the normal drilling practice is performing two wiper trips. First wiper trip after drilling the 8-½″ section, pulling out till the 9–5/8″ window at 8740 ft. and RIH again till 8-½″ TD at 14442 ft., the first wiper trip would have consumed +/- 24 hours rig time. Then follow with another wiper trip through running 8-½″ drilling BHA from surface till TD at 14442 ft. after pulling out of hole with the logging tools, the second wiper trip would have consumed +/- 36 hours. Accordingly, a total of +/- 60 hours rig time would have been consumed in both wiper trips. Wiper trips would have increase the gap between finalizing drilling 8-½″ hole and running liner hanger system. Increasing the gap would thereby increased the possibility of open-hole pack-off while running the liner hanger system. Accordingly, an optimum solution is to run Free Rotating Eccentric Guide Shoe (FREG) with two Sure Seal valves each provided a 3.14 square inch (20.3 CM2) minimum flow area to allow large cuttings and debris to pass through. In addition, any resulting side force during running would rotates the guide shoe away from the obstruction, thus allowing continued running of the pipe to the predetermined depth without rotation of the entire casing or liner string and reducing the risk of string stuck. Accordingly, the risk of pulling out of hole twice and performing two wiper trips was eliminated.
Title: Free Rotating Eccentric Guide Shoe Reached TD in High Angle Well Saves ±60 Hours of Rig Time
Description:
AbstractIn the pursuit to access reserves at ever increasing departures the ability to successfully run very long casing strings in highly deviated wells is essential.
Running 6200 ft.
(1890 m.
) long 7″ liner in a highly deviated ‘S’ shape well (80 Deg.
) with high dogleg severity 15 Deg.
/100 ft.
across whipstock window) is considered a big challenge.
The severity of this challenge increases multifold while passing the string through challenging interbedded formations.
The case presented here had unique achievement that last seven days while performing extensive open-hole logging after drilling 8-½″ section and prior running the liner hanger system.
Aligned with the pre-determined challenges; the normal drilling practice is performing two wiper trips.
First wiper trip after drilling the 8-½″ section, pulling out till the 9–5/8″ window at 8740 ft.
and RIH again till 8-½″ TD at 14442 ft.
, the first wiper trip would have consumed +/- 24 hours rig time.
Then follow with another wiper trip through running 8-½″ drilling BHA from surface till TD at 14442 ft.
after pulling out of hole with the logging tools, the second wiper trip would have consumed +/- 36 hours.
Accordingly, a total of +/- 60 hours rig time would have been consumed in both wiper trips.
Wiper trips would have increase the gap between finalizing drilling 8-½″ hole and running liner hanger system.
Increasing the gap would thereby increased the possibility of open-hole pack-off while running the liner hanger system.
Accordingly, an optimum solution is to run Free Rotating Eccentric Guide Shoe (FREG) with two Sure Seal valves each provided a 3.
14 square inch (20.
3 CM2) minimum flow area to allow large cuttings and debris to pass through.
In addition, any resulting side force during running would rotates the guide shoe away from the obstruction, thus allowing continued running of the pipe to the predetermined depth without rotation of the entire casing or liner string and reducing the risk of string stuck.
Accordingly, the risk of pulling out of hole twice and performing two wiper trips was eliminated.
Related Results
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Abstract
Serban is an offshore drilling project located in Nunukan Block, Indonesia, approximately 3 km northwest of Bunyu Island, an offshore area with very shal...
Rig Inspection and Safety Relationship
Rig Inspection and Safety Relationship
Abstract
Preventing the occurrence of accidents in drilling and well servicing operations is a constant and major concern for any company or contractor acting in ...
Upper g- Eccentric Domination in Fuzzy Graphs
Upper g- Eccentric Domination in Fuzzy Graphs
Objectives: To introduce a contemporary aspect notorious as upper g-eccentric point set, upper g-eccentric number, upper g-eccentric dominating set, upper g-eccentric domination nu...
Rig Sizing: Revolutionizing Rig Sizing for Optimal Performance and Efficiency
Rig Sizing: Revolutionizing Rig Sizing for Optimal Performance and Efficiency
Abstract
Rig sizing is a critical process that ensures the appropriate rigs are selected for drilling oil or gas wells, balancing safety and cost-effectiveness. Prop...
Influence of process variables on shoe polish viscosity
Influence of process variables on shoe polish viscosity
Valourisation of non-biodegradable wastes into value added products like shoe polish can indeed be an effective tool for waste management and climate change mitigation. However, ha...
Project To Upright The Alexander L. Kielland
Project To Upright The Alexander L. Kielland
Abstract
The Alexander L Kielland is a drilling rig of Pentagone type. It was being used as an accommodation unit when it capsized in the North Sea in 1980 as a r...
Determining Rig State from Computer Vision Analytics
Determining Rig State from Computer Vision Analytics
Abstract
For years, many companies involved with drilling have searched for the ideal method to calculate the state of a drilling rig. While companies cannot agree o...
Kuwait Oil Company's Latest Semiautomated Deep Drilling Rig – HAH Rig 124, The Middle East's Most Modern 3,000-HP Land Rig
Kuwait Oil Company's Latest Semiautomated Deep Drilling Rig – HAH Rig 124, The Middle East's Most Modern 3,000-HP Land Rig
Abstract
KOC has been drilling deep HPHT wells from the mid 1980’s, and during this time the Kuwait deep well prospects have become deeper and more challenging. The ...