Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Execution of Repair Works on the Trogir –Čiovo Island Bridge

View through CrossRef
The paper presents the execution of repair works of the movable bridge conducted by Spegra, a company specialized in the restoration and reconstruction of various types of structures. The Trogir - Čiovo Island bridge is located on the Croatian coast near the historic city of Trogir. The bridge spans a narrow sea strait, connecting the city of Trogir with the nearby Čiovo Island. It was built in 1962 as a movable bridge with a structure consisting of steel and reinforced concrete elements with a stone cladding. The bridge has three spans, with a total length of 102 meters including approaches. The central movable span structure is an arch steel construction, while the other two are reinforced concrete arches. The bridge restoration works are divided into three groups. The first group: dismantling, restoration, and assembly of the steel span structure and expansion joint steel elements. The second group: restoration of reinforced concrete elements: roadway slabs, pedestrian walkways, arches, and the interior of caissons. The third group: restoration of the stone cladding of the bridge. All works were conducted in cooperation with the Conservation Department of the city of Trogir.
Title: Execution of Repair Works on the Trogir –Čiovo Island Bridge
Description:
The paper presents the execution of repair works of the movable bridge conducted by Spegra, a company specialized in the restoration and reconstruction of various types of structures.
The Trogir - Čiovo Island bridge is located on the Croatian coast near the historic city of Trogir.
The bridge spans a narrow sea strait, connecting the city of Trogir with the nearby Čiovo Island.
It was built in 1962 as a movable bridge with a structure consisting of steel and reinforced concrete elements with a stone cladding.
The bridge has three spans, with a total length of 102 meters including approaches.
The central movable span structure is an arch steel construction, while the other two are reinforced concrete arches.
The bridge restoration works are divided into three groups.
The first group: dismantling, restoration, and assembly of the steel span structure and expansion joint steel elements.
The second group: restoration of reinforced concrete elements: roadway slabs, pedestrian walkways, arches, and the interior of caissons.
The third group: restoration of the stone cladding of the bridge.
All works were conducted in cooperation with the Conservation Department of the city of Trogir.

Related Results

A historical reconstruction of the legend of Miljenko and Dobrila (Kaštela, Croatia, 17th century)
A historical reconstruction of the legend of Miljenko and Dobrila (Kaštela, Croatia, 17th century)
Aim: To explore the historical basis of the legend of Miljenko and Dobrila, which tells the story of the tragic love between Miljenko Rosani and Dobrila Vitturi, descendants of Kaš...
On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
<span style="font-size:11pt"><span style="background:#f9f9f4"><span style="line-height:normal"><span style="font-family:Calibri,sans-serif"><b><spa...
New (and old) aspects of the island syndrome in plants on New Zealand’s outlying islands
New (and old) aspects of the island syndrome in plants on New Zealand’s outlying islands
For reasons not fully understood, plant communities on islands differ predictably from mainland ones. For example, plants with herbaceous relatives on the mainland are often woody ...
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
Oral interaction is sometimes not articulated by its participants as perfect as they project. The unsuccessful instances of talk in exchange may cause serious communicative breakdo...
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
<p dir="ltr">There is inequity in access to surgical treatment and quality of care globally and this is more pronounced in low-and middle-income countries (LMICs) especially ...
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
<p dir="ltr">There is inequity in access to surgical treatment and quality of care globally and this is more pronounced in low-and middle-income countries (LMICs) especially ...
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
Background: Several methods for fixing inguinal hernias have been documented. Anterior or posterior approaches,open or laparoscopic procedures, may be used for hernia repair. While...

Back to Top