Decision Support System on Pipeline Replacement of 200 kilometers Main Oil Transport Pipeline in a Very Mature Oil Block

View through CrossRef
Abstract Objectives/Scope The objectives of the research are to establish decision support system for pipeline replacement. The scope of the research is 2005 – 2014 inspection data on 200 kilometers main oil transport pipeline in one of mature oil block under Production Sharing Contract. The incident varies from small leak, rupture, congeal, and to the most: hit by trucks incidents. Methods, Procedures, Process Research starts in 2005 – 2014 after first leak in 2005. The research performed with many investigation methods, from visual inspection, in line inspection, long-range ultra-sonic method, to magnetic tomographic method. Results from those investigation used for short-term action and used for risk analysis. Risk analysis conducted from process hazard identification and analysis, to risk based inspection analysis. SWOT analysis also performed to make conceptual decision for the replacement. Front End Engineering Design (FEED) was conducted to replace the pipeline. Quantitative Risk Analysis for new pipeline is included in FEED. Results, Observations, Conclusions Pipeline inspection performed since 2005 shows there were significant wall thickness loss at the pipeline. Short-term action has performed by installing pipe metal sleeve. This procedure significantly reduces numbers of leak incident. The predictive and preventive maintenance is performed every year to assure safe pipeline operation. Inspection on right of way shows significant population growth along the pipeline route. Inspection shows rapid growth in land encroachment, illegal crossing, and illegal tapping activities along right of way. Police records shows "pipeline hit by truck" occurred every year. Short-term action has already performed to protect the right of way including access limitation, hazard signs, and fencing. Unfortunately, these actions do not reduce the numbers of incident significantly. All inspection data and records become inputs for process hazards analysis and risk based analysis. Risk based analysis shows most of 200 kilometers pipeline sections are exposed to high risk. Pipe metal sleeve do not reduce overall risk significantly yet. Pipeline is highly exposed to third party risk. SWOT analyses shows pipeline replacement with new route are required to significantly reduce the calculated risk. Novel/Additive Information This paper shows a structured decision support system is required in the very first step of project to make conceptual decision massive pipeline replacement in a very mature oil block.
Title: Decision Support System on Pipeline Replacement of 200 kilometers Main Oil Transport Pipeline in a Very Mature Oil Block
Description:
Abstract Objectives/Scope The objectives of the research are to establish decision support system for pipeline replacement.
The scope of the research is 2005 – 2014 inspection data on 200 kilometers main oil transport pipeline in one of mature oil block under Production Sharing Contract.
The incident varies from small leak, rupture, congeal, and to the most: hit by trucks incidents.
Methods, Procedures, Process Research starts in 2005 – 2014 after first leak in 2005.
The research performed with many investigation methods, from visual inspection, in line inspection, long-range ultra-sonic method, to magnetic tomographic method.
Results from those investigation used for short-term action and used for risk analysis.
Risk analysis conducted from process hazard identification and analysis, to risk based inspection analysis.
SWOT analysis also performed to make conceptual decision for the replacement.
Front End Engineering Design (FEED) was conducted to replace the pipeline.
Quantitative Risk Analysis for new pipeline is included in FEED.
Results, Observations, Conclusions Pipeline inspection performed since 2005 shows there were significant wall thickness loss at the pipeline.
Short-term action has performed by installing pipe metal sleeve.
This procedure significantly reduces numbers of leak incident.
The predictive and preventive maintenance is performed every year to assure safe pipeline operation.
Inspection on right of way shows significant population growth along the pipeline route.
Inspection shows rapid growth in land encroachment, illegal crossing, and illegal tapping activities along right of way.
Police records shows "pipeline hit by truck" occurred every year.
Short-term action has already performed to protect the right of way including access limitation, hazard signs, and fencing.
Unfortunately, these actions do not reduce the numbers of incident significantly.
All inspection data and records become inputs for process hazards analysis and risk based analysis.
Risk based analysis shows most of 200 kilometers pipeline sections are exposed to high risk.
Pipe metal sleeve do not reduce overall risk significantly yet.
Pipeline is highly exposed to third party risk.
SWOT analyses shows pipeline replacement with new route are required to significantly reduce the calculated risk.
Novel/Additive Information This paper shows a structured decision support system is required in the very first step of project to make conceptual decision massive pipeline replacement in a very mature oil block.

Related Results

Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
Autonomy on Trial
Autonomy on Trial
Photo by CHUTTERSNAP on Unsplash Abstract This paper critically examines how US bioethics and health law conceptualize patient autonomy, contrasting the rights-based, individualist...
Predict Seasonal Maximum Freezing Depth Changes Using Machine Learning in China over the Last 50 Years
Predict Seasonal Maximum Freezing Depth Changes Using Machine Learning in China over the Last 50 Years
Seasonal freezing depth change is important in many environmental science and engineering applications. However, such changes are rare at region scales, especially over China, in t...
Dewatering And Commissioning The Uk Central Area Transmission System (CATS) Pipeline
Dewatering And Commissioning The Uk Central Area Transmission System (CATS) Pipeline
ABSTRACT A monoethylene glycol swabbing technique was used to successfully dewater the 36" diameter, 410 kilometer, Central Area Transmission System (CATS) gas pi...
SYSTEMATIZATION OF THE REGULATORY FRAMEWORK OF ENSURING THE WATER TRANSPORT COMPETITIVENESS IN UKRAINE
SYSTEMATIZATION OF THE REGULATORY FRAMEWORK OF ENSURING THE WATER TRANSPORT COMPETITIVENESS IN UKRAINE
Topicality. Business entities in the field of water transport can gain competitive advantages and ensure their competitiveness through the introduction of innovations into the proc...
Pipeline Resistance
Pipeline Resistance
Pipeline resistance is where an often abstract and wonky climate movement meets the bravery and boldness of Indigenous and other frontline defenders of land and water who inspire d...
Research on Approval of Domestic and International Transport Container Application of Radioactive Material
Research on Approval of Domestic and International Transport Container Application of Radioactive Material
Due to the potentially dangerous properties of radioactive material, it is during the transport that the process of nuclear energy and technology uses are prone to nuclear and radi...
A Fluid-pipe-soil Approach to Stability Design of Submarine Pipelines
A Fluid-pipe-soil Approach to Stability Design of Submarine Pipelines
Abstract The conventional approach to submarine pipeline stability design considers interactions between water and pipeline (fluid-pipe) and pipeline and seabed (...

Back to Top