Javascript must be enabled to continue!
Modeling bid/no bid decisions using fuzzy fault tree
View through CrossRef
Purpose
Decisions by construction contractors to bid (or not to bid) require the thorough assessment and evaluation of factors relevant to the decision, as well as the quantification of their combined impact, to produce successful bid/no-bid decisions. The purpose of this study is to present a fuzzy fault tree model to assist construction contractors to more efficiently bid for future projects.
Design/methodology/Approach
The proposed model consist of two stages: first, identification of the factors that affect bidding decision using a questionnaire survey after an extensive literature review, and second, usage of the identified factors to build a fuzzy fault tree model to simulate the bidding decision.
Findings
A list of 15 factors that affect bid/no-bid decisions was identified. Analysis of factors revealed that the highest-ranking factors were related to financial aspects of the project. A case study is presented to demonstrate the capabilities of the model, and a fuzzy important analysis is performed on the basic events to demonstrate the differences between three contractors’ bid/no-bid decisions. The results reveal that there is variation between the decisions of each contractor based on their willingness to participate. Besides, the influence of evaluation factors on the final decision for each contractor is different.
Originality/value
The study contributes to the body of knowledge on tendering and bidding practices. The proposed model incorporated the fuzzy set theory, which suits human subjectivity. The proposed methodology overcomes the limitations of previous models as it can, using the linear pool opinion principle, combine and weigh the evaluations of multiple experts. In addition, the model is convenient for situations where historical data are not available.
Title: Modeling bid/no bid decisions using fuzzy fault tree
Description:
Purpose
Decisions by construction contractors to bid (or not to bid) require the thorough assessment and evaluation of factors relevant to the decision, as well as the quantification of their combined impact, to produce successful bid/no-bid decisions.
The purpose of this study is to present a fuzzy fault tree model to assist construction contractors to more efficiently bid for future projects.
Design/methodology/Approach
The proposed model consist of two stages: first, identification of the factors that affect bidding decision using a questionnaire survey after an extensive literature review, and second, usage of the identified factors to build a fuzzy fault tree model to simulate the bidding decision.
Findings
A list of 15 factors that affect bid/no-bid decisions was identified.
Analysis of factors revealed that the highest-ranking factors were related to financial aspects of the project.
A case study is presented to demonstrate the capabilities of the model, and a fuzzy important analysis is performed on the basic events to demonstrate the differences between three contractors’ bid/no-bid decisions.
The results reveal that there is variation between the decisions of each contractor based on their willingness to participate.
Besides, the influence of evaluation factors on the final decision for each contractor is different.
Originality/value
The study contributes to the body of knowledge on tendering and bidding practices.
The proposed model incorporated the fuzzy set theory, which suits human subjectivity.
The proposed methodology overcomes the limitations of previous models as it can, using the linear pool opinion principle, combine and weigh the evaluations of multiple experts.
In addition, the model is convenient for situations where historical data are not available.
Related Results
Integration Techniques of Fault Detection and Isolation Using Interval Observers
Integration Techniques of Fault Detection and Isolation Using Interval Observers
An interval observer has been illustrated to be a suitable approach to detect and isolate faults affecting complex dynamical industrial systems.
Concerning fault detection, interv...
Deformational Processes Accommodating Slip on an Active Low-Angle Normal Fault, Suckling-Dayman Metamorphic Core Complex, Papua New Guinea
Deformational Processes Accommodating Slip on an Active Low-Angle Normal Fault, Suckling-Dayman Metamorphic Core Complex, Papua New Guinea
<p><b>Detachment faults that can be shown to have slipped at dips <30° in highly extended continental crust are referred to as “Low-Angle Normal Faults” (LANFs). The...
Konstruksi Sistem Inferensi Fuzzy Menggunakan Subtractive Fuzzy C-Means pada Data Parkinson
Konstruksi Sistem Inferensi Fuzzy Menggunakan Subtractive Fuzzy C-Means pada Data Parkinson
Abstract. Fuzzy Inference System requires several stages to get the output, 1) formation of fuzzy sets, 2) formation of rules, 3) application of implication functions, 4) compositi...
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Generated Fuzzy Quasi-ideals in Ternary Semigroups
Here in this paper, we provide characterizations of fuzzy quasi-ideal in terms of level and strong level subsets. Along with it, we provide expression for the generated fuzzy quasi...
Decomposition and Evolution of Intracontinental Strike‐Slip Faults in Eastern Tibetan Plateau
Decomposition and Evolution of Intracontinental Strike‐Slip Faults in Eastern Tibetan Plateau
Abstract:Little attention had been paid to the intracontinental strike‐slip faults of the Tibetan Plateau. Since the discovery of the Longriba fault using re‐measured GPS data in 2...
ω – SUBSEMIRING FUZZY
ω – SUBSEMIRING FUZZY
Mapping ρ is called a fuzzy subset of an empty set of S if ρ is the mapping from S to the closed interval [0,1]. A fuzzy subset ρ introduced into this paper is a fuzzy subset of se...
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
Background Several scholars defined the concepts of fuzzy soft set theory and their application on decision-making problem. Based on this concept, researchers defined the generalis...
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
New Approaches of Generalised Fuzzy Soft sets on fuzzy Codes and Its Properties on Decision-Makings
Background Several scholars defined the concepts of fuzzy soft set theory and their application on decision-making problem. Based on this concept, researchers defined the generalis...

