Javascript must be enabled to continue!
William Burges and the Completion of St. Paul's
View through CrossRef
SummarySt. Paul's is a post-Reformation cathedral, built on a pre-Reformation plan; designed for Anglicans, re-planned for Evangelicals, and then re-decorated for Anglo-Catholics. Hence the complexity of its architectural history. This article examines Wren's unfinished legacy, and discusses the many schemes to complete the cathedral's decoration, beginning with Sir James Thornhill and ending with Sir William Richmond. Central to its theme are the decorative proposals produced between 1870 and 1874 by William Burges (1827–81). Public outcry prevented the implementation of Burges's plans for a full-scale programme of marble and mosaic decoration. Nevertheless, his schemes formed the basis of the cathedral's eventual refurbishment during the 1890s.
Title: William Burges and the Completion of St. Paul's
Description:
SummarySt.
Paul's is a post-Reformation cathedral, built on a pre-Reformation plan; designed for Anglicans, re-planned for Evangelicals, and then re-decorated for Anglo-Catholics.
Hence the complexity of its architectural history.
This article examines Wren's unfinished legacy, and discusses the many schemes to complete the cathedral's decoration, beginning with Sir James Thornhill and ending with Sir William Richmond.
Central to its theme are the decorative proposals produced between 1870 and 1874 by William Burges (1827–81).
Public outcry prevented the implementation of Burges's plans for a full-scale programme of marble and mosaic decoration.
Nevertheless, his schemes formed the basis of the cathedral's eventual refurbishment during the 1890s.
Related Results
"Qui Transtulit Sustinet": William Burges, Francis Kimball, and the Architecture of Hartford's Trinity College
"Qui Transtulit Sustinet": William Burges, Francis Kimball, and the Architecture of Hartford's Trinity College
William Burges's master plan for Trinity College in Hartford has long been considered more as the product of fantasy than as a serious proposal for the reconstruction of the colleg...
Recent Innovations in Offshore Completion and Workover Systems
Recent Innovations in Offshore Completion and Workover Systems
ABSTRACT
Humble Oil &Refining Company has developed an offshore completion and workover system, for use with multi-well fixed platform development, which util...
Novel Workflow to Optimise Annular Flow Isolation in Advanced Wells
Novel Workflow to Optimise Annular Flow Isolation in Advanced Wells
Abstract
Advanced well completion with multiple, downhole flow control devices such as Inflow Control Devices (ICDs), are a proven and effective solution to mitig...
A Skin Factor Model of Sliding Sleeve and its Production Optimization
A Skin Factor Model of Sliding Sleeve and its Production Optimization
Abstract
In order to effectively alleviate the problem of premature water breakthrough in horizontal wells, sectionalized variable-density perforation completion, st...
Innovative Approaches and Lessons Learned from Longest Slim Hole Smart Completion Wells with Hybrid Cable: Twin Fraternal Well Monobore Case Study
Innovative Approaches and Lessons Learned from Longest Slim Hole Smart Completion Wells with Hybrid Cable: Twin Fraternal Well Monobore Case Study
Abstract
This case study aims to break down the engineering and operational strategies, along with the challenges faced in deploying the longest slim hole smart comp...
Completion And Workover Well Control Needs Are Different!
Completion And Workover Well Control Needs Are Different!
Abstract
Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fa...
A Novel Underbalanced-Perforating Gun Deployment System Using Production Packer Technology Successfully Completes Offshore Horizontal Wells in a Single Trip
A Novel Underbalanced-Perforating Gun Deployment System Using Production Packer Technology Successfully Completes Offshore Horizontal Wells in a Single Trip
Abstract
An innovative completion method was recently used to complete two oil fields in the central and northern areas of the North Sea. The Skua field was a sin...
Gas Lift Production Benchmarking Using IPR Risked Inflow Modeling: Case Study
Gas Lift Production Benchmarking Using IPR Risked Inflow Modeling: Case Study
Abstract
Ensuring effective production benchmarking studies and field management requires a through and continuing understanding of the reservoir performance. Deviat...

